You are on page 1of 34

Bridport House

8-Storey Residential Block

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Contents

Eurban
Why CLT / Stora Enso ?
Bridport House
Summary

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Eurban

Independent timber engineers/contractor


Specialists in CLT structures
UK based company offices in London and Inverness
Projects for both public and private sectors
Over 60 projects delivered in the last 6 years
Providers of full structural package

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Eurban

Integrated Supply Partner

ENGINEERING MATERIALS INSTALLATION

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Eurban / Engineering

In-house specialist timber engineers

State-of-the-art technology

Full timber design services

Working with leading European companies

Co-ordination with the design team


ENGINEERING
Close collaboration with the on-site team

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Eurban / Materials

Data interface with manufacturers

Sourcing the most appropriate


product / supplier for each project

Project-specific solutions

SUPPLY

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Eurban / Installation

Our own on-site installation teams

Buildability considered during design

Quality management

INSTALLATIO

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Eurban / Multi-Storey

Hackney, London
2005
5 storeys
6 weeks Installation
1,067m2 GIFA
7 office units
11 residential units

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Eurban / Multi-Storey

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Why CLT?

Simple details => quality management

Solid building system => different to timber frame

Prefabricated system => short installation time

Better tolerance => quality on site / following trades

Sustainable material => green building system

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Why Stora Enso CLT?

Integrated sawmill & manufacturing plant


=> less transport and CO2 emissions

Edge glued panels


=> closed surface, weather resistance

Formaldehyde-free adhesive
=> indoor air quality

Interface with the factory


=> efficient date transfer between Eurban and Stora Enso

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House

7 weeks design period

10 weeks fabrication prior


to start on site

12 weeks installation

CLT Panels 1576m3

Steel Elements 1520kg

30 CLT deliveries

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House
Karakusevic Carson Architects

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House
12

01 02 03 04 05 06 07 08 09 10 11

D D

C C

B B

A A

01 02 03 04 05 06 07 08 09 10 11

12

12

01 02 03 04 05 06 07 08 09 10 11

D D

C C

B B

A A

01 02 03 04 05 06 07 08 09 10 11

12

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Challenge

Different layout of the loadbearing elements

Overall shrinkage

Overall stability

Logistics of a very tight site

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Loadbearing Structure 12

01 02 03 04 05 06 07 08 09 10 11

D D

C C

B B

A A

01 02 03 04 05 06 07 08 09 10 11

12

12

01 02 03 04 05 06 07 08 09 10 11

D D

C C

B B

A A

01 02 03 04 05 06 07 08 09 10 11

12

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Loadbearing Structure

Wall Panels:
CLT 138-5 or CLT 161-5

Floor Panels:
CLT 182-5 or CLT 223-7

Roof Panels:
CLT 165-5 or CLT 182-5

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Loadbearing Structure

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Minimising of overall shrinkage

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Minimising of overall shrinkage

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Minimising of overall shrinkage

OVERALL LONG TERM OVERALL LONG TERM


SHRINKAGE 18mm SHRINKAGE 29mm

40% LESS SHRINKAGE

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Overall Stability - Crosswise


12

01 02 03 04 05 06 07 08 09 10 11

D D

C C

B B

A A

01 02 03 04 05 06 07 08 09 10 11

12

12
01 02 03 04 05 06 07 08 09 10 11

D D

C C

B B

A A

01 02 03 04 05 06 07 08 09 10 11

12

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Overall Stability - Crosswise

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Overall Stability - Crosswise

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Overall Stability - Lengthwise


12

01 02 03 04 05 06 07 08 09 10 11

D D

C C

B B

A A

01 02 03 04 05 06 07 08 09 10 11

12

12

01 02 03 04 05 06 07 08 09 10 11

D D

C C

B B

A A

01 02 03 04 05 06 07 08 09 10 11

12

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Overall Stability - Lengthwise

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Overall Stability - Lengthwise

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Logistics

Very tight site constraints

Transportation time from Austria to the UK

Crane and working time restriction

Follow-on trades

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Day 01

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Day 30

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Day 40

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Bridport House / The Solution

Topping-Out Party, 22 February 2011

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Summary

Layout was not the simplest for a CLT solution

The overall stability was the biggest challenge

CLT competitive when compared to concrete

10+ storeys are possible with CLT

CLT is an attractive alternative to concrete or steel

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011


Thank you for listening

Wood Talks 2011 Building Center Philipp Zumbrunnen 14 September 2011

You might also like