ORIFICIOS
Pulg cm
1/2" 1.27
3/4" 1.905
1" 2.54
1.1/2" 3.81
2" 5.08
2.1/2" 6.35
3" 7.62
4" 10.16
6" 15.24
TUBERAS
Pulg cm
1/2 1.27
3/4 1.905
1 2.54
1 1/2 3.81
2 5.08
2 1/2 6.35
3 7.62
4 10.16
6 15.24
1.00
1/4 + 0.002 + 0.011 + 0.000 + 0.003 - 0.005 - 0.023
1.00 1/2 + 0.009 + 0.013 + 0.005 + 0.005 - 0.006 - 0.029
3/4 + 0.008 + 0.008 + 0.005 + 0.004 - 0.004 - 0.020
1 - 0.035 - 0.007 - 0.022 - 0.005 0 0
0 0 + 0.004 0 + 0.001 0 - 0.007
1/4 + 0.001 + 0.008 - 0.000 + 0.002 - 0.002 - 0.011
0.75 1/2 + 0.005 + 0.010 + 0.002 + 0.003 - 0.003 - 0.017
3/4 + 0.007 + 0.007 + 0.003 + 0.003 - 0.003 - 0.013
1 - 0.024 - 0.005 - 0.015 - 0.003 0 0
0 0 + 0.001 0 + 0.000 0 - 0.002
1/4 + 0.000 + 0.005 - 0.000 + 0.001 - 0.001 - 0.004
0.50 1/2 + 0.002 + 0.006 + 0.001 + 0.001 - 0.002 - 0.009
3/4 + 0.004 + 0.006 + 0.001 + 0.001 - 0.001 - 0.007
1 - 0.015 - 0.003 - 0.008 - 0.002 0 0
AREA (cm2) segn nmero de barras
7 8 9 10
RESULTADOS
Tasa de Crecimiento r : 0.0140
Lugar :
Distrito : Provincia :
a. Poblacin:
Poblacin ao 1993 569 hab
1. DISEO HIDRAULICO
1.1 Calculo de la Pantalla
Altura entre el afloramiento y Orifico de entrada h= 0.40 m
Aceleracin de la gravedad (g) g= 9.81
Velocidad de Pase V = (2.g.h/1.56) 1/2
V= 2.24 m/s
La Velocidad de Pase es mayor que la recomendada, por lo tanto se asume V= 0.5 m/s
Altura entre el afloramiento y Orifico de entrada definitivo h o = 1.56 V2/(2.g) ho = 0.02 m
Prdida de carga hf = h - ho hf = 0.38 m
Distancia del Afloramiento a Cmara de Captacin L = hf/0.30 L= 1.27 m
Coeficiente de Descarga (Cd) Cd = 0.80
Caudal mximo de la fuente (Qmx) Qmx = 0.0013 m3/s
Area de orifico de pase A = Qmx/(Cd.V) Ao = 0.00325 m2
Dimetro del orificio (D) D= 6.43 cm
Dimetro de orificio Calculado (D1) Doc = 2.1/2" 6.35 cm
Dimetro de orificio Seleccionado (D2) Dos = 1.1/2" 3.81 cm
Nmero de Agujeros NA = (D1/D2)2 +1 N.A. 4.00 Agujeros
Ancho de Pantalla b = 2(6D) + NA.D + 3D (NA - 1) b= 95.25 cm
Ancho de Pantalla asumido b= 100.00 cm
2. DISEO ESTRUCTURAL
0.45
0.55
0.15
Mr - Mv 329.30 - 36.50
a= = = 0.44
Wt 664.80
2.4 Chequeos
2.4.1 Por Volteo ( Cdv = Mr/Mv > 1.6 )
Momento resistente Mr = 329.30
Momento de Volteo Mv = 36.50
Coeficiente de Volteo ( Cdv = Mr/Mv > 1.6 ) Cdv = 9.02 > 1.60 O.K.
2.4.2 Por Mxima Carga Unitaria (Maxima Carga Unitaria < Capacidad Portante del terreno)
Carga unitaria P1 = (4L - 6a) Wt / L P1 = 0.022
Carga unitaria P2 = (6a - 2L) Wt / L P2 = 0.168
Cota del Terreno Prdida de Dimetros (Pulg.) Cota del Terreno Cota Piezomtrica
Presin Prdida de Prdida de Prdida de
Longitud Caudal Prdida de carga carga Velocidad Longitud Desnivel Presin
residual carga unitaria carga tramo carga
Tramo Total L Qmd deseada Hf unitaria V (L-X, X) del Terreno Final
deseada hf1, hf2 Hf1, Hf2 acumulada
(m) (l/s) Inicial Final (m) deseada (m/s) (m) Inicial Final (m) Inicial Final (m)
(m) Calculado Asumido (m/m) (m) (m)
(msnm) (msnm) hf (m) (msnm) (msnm) (msnm) (msnm)
Capt - CRP 1 121.78 1.000996 1320.00 1309.00 0 11.00 0.0903 1.18 1 1/2 0.878 0.0257 121.78 3.133 1320.00 1309.00 11.00 3.133 1320.00 1316.87 7.87
1 1.975 0.1850 121.78 22.530 1309.00 1309.00 0.00 25.663 1316.87 1294.34 -14.66
CRP 1 - CRP 2 300 1.000996 3447.00 3377.50 20 49.50 0.1650 1.04 1 1/2 0.878 0.0257 160 4.117 3447.00 3404.60 42.40 4.117 3447.00 3442.88 38.28
1 1.975 0.1850 140 25.901 3404.60 3377.50 27.10 30.017 3442.88 3416.98 39.48
RESERVORIO DE ALMACENAMIENTO
1. DISEO HIDRAULICO
Volumen del Reservorio V= 20 M3
Altura de agua h= 1.48 m
Ancho de la Pared b = 3.67607 m
Ancho de la Pared asumido b= 3.70 m
Relacin b/h b/h = 2.48383
Relacin b/h asumido b/h = 2.50
Borde libre B.L. = 0.30 m
Altura total H= 1.78 m
2. DISEO ESTRUCTURAL
Consideracin : Tapa Libre y Fondo Empotrado