Caractersticas de la barra SLACK

Name Grid Terminal Bus Active Reactive Apparent u, Power


T. Power Power Power Magnitude Factor
Busbar MW Mvar MVA p.u.
G9 Grid SL 43.38606 29.54835 52.49243 1.05 0.8265203
Terminal(14)

REPORTE CALCULO DE FLUJO

-------------------------------------------------------------------
----------------------------------------------------------------
| |
| DIgSILENT | Project: |
| |
| PowerFactory |-------------------------------
| |
| 15.1.7 | Date: 8/29/2017 |
-------------------------------------------------------------------
----------------------------------------------------------------
-------------------------------------------------------------------
----------------------------------------------------------------
| Load Flow Calculation
Grid Summary |
-------------------------------------------------------------------
----------------------------------------------------------------
| AC Load Flow, balanced, positive sequence |
Automatic Model Adaptation for Convergence No |
| Automatic Tap Adjust of Transformers Yes |
Max. Acceptable Load Flow Error for |
| Consider Reactive Power Limits Yes |
Nodes 1.00 kVA |
| |
Model Equations 0.10 % |
-------------------------------------------------------------------
----------------------------------------------------------------
-------------------------------------------------------------------
----------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study
Case: Caso de Estudio 1 | Annex: / 1 |
-------------------------------------------------------------------
----------------------------------------------------------------
| Grid: Grid Summary
|
|
|
| No. of Substations 2 No. of Busbars 21
No. of Terminals 52 No. of Lines 18 |
| No. of 2-w Trfs. 14 No. of 3-w Trfs. 0
No. of syn. Machines 15 No. of asyn.Machines 0 |
| No. of Loads 8 No. of Shunts 10
No. of SVS 0 |
|
|
| Generation = 238.39 MW 84.48 Mvar
252.91 MVA |
| External Infeed = 0.00 MW 0.00 Mvar
0.00 MVA |
| Inter Grid Flow = 0.00 MW 0.00 Mvar
|
| Load P(U) = 231.88 MW 110.75 Mvar
256.97 MVA |
| Load P(Un) = 231.88 MW 110.75 Mvar
256.97 MVA |
| Load P(Un-U) = 0.00 MW 0.00 Mvar
|
| Motor Load = 0.00 MW 0.00 Mvar
0.00 MVA |
| Grid Losses = 6.51 MW -149.12 Mvar
|
| Line Charging = -199.12 Mvar
|
| Compensation ind. = 141.70 Mvar
|
| Compensation cap. = -18.84 Mvar
|
|
|
| Installed Capacity = 325.41 MW
|
| Spinning Reserve = 87.02 MW
|
|
|
| Total Power Factor:
|
| Generation = 0.94 [-]
|
| Load/Motor = 0.90 / 0.00 [-]
|
|------------------------------------------------------------------
---------------------------------------------------------------|

TENSIONES EN BARRAS FIEE, FIM, FIC, FIIS, FAUA

Name In Folder Grid Nom.L-L Volt. Ul, Magnitude u, Magnitude U, Angle


kV kV p.u. deg
FAUA Grid Grid 225 230.4204 1.024091 147.9331
FIC Grid Grid 225 230.0804 1.02258 147.6995
FIEE Double Busbar(1) Grid 225 229.6979 1.02088 147.8821
FIEE(1) Double Busbar(1) Grid 225 229.6979 1.02088 147.8821
FIM Grid Grid 90 83.94349 0.9327055 146.0563
FISS Grid Grid 225 222.8028 0.9902347 145.2971
FLUJOS DE POTENCIA EN LAS lneas L2, L8, L9, L5, L12 Y L18.

Name Terminal i Terminal j Terminal Loading Active Power Reactive Power Apparent Power Power
j Factor
Busbar StaCubic Busbar % Terminal i in Terminal i in Terminal i in Terminal i
MW Mvar MVA
L12 FIM Double BB1 21.73347 7.553158 2.853137 8.074069 0.9354835
Busbar
L18 Double BB2 54.85729 33.0883 3.249515 33.24748 0.9952123
Terminal(8) Busbar
L2 FIEE FAUA 7.706922 -6.317171 -14.06982 15.42292 -0.4095963
L5 FAUA FIC 8.37229 16.17288 -0.2491926 16.1748 0.9998813
L8 FIEE(1) FISS 29.97124 21.62338 -11.46201 24.47342 0.8835456
L9 FIC FISS 83.6303 28.6706 -0.6035442 28.67695 0.9997785

REPORTE DE ALGUNAS CONTINGENCIAS

Component Branch, Voltage Voltage Voltage Contingency Contingency Base Case and Post Voltage
Substation
or Site Min. Step Base Number Name [0.709 p.u. - 0.933 p.u.]
[p.u.] [p.u.] [p.u.]
FIM 0.709 -0.224 0.933 9 2-Winding 1#708;935#709,0;933,11;9999000,2
Transformer(1)
Terminal(6) 0.743 -0.123 0.865 9 2-Winding 1#708;935#743,0;865,11;9999000,2
Transformer(1)
Terminal(7) 0.753 -0.119 0.872 9 2-Winding 1#708;935#753,0;872,11;9999000,2
Transformer(1)
Terminal(10) 0.764 -0.116 0.88 9 2-Winding 1#708;935#764,0;880,11;9999000,2
Transformer(1)
BB1 Double 0.765 -0.116 0.881 9 2-Winding 1#708;935#765,0;881,11;9999000,2
Busbar Transformer(1)
BB2 Double 0.765 -0.116 0.881 9 2-Winding 1#708;935#765,0;881,11;9999000,2
Busbar Transformer(1)

COMENTARIOS:

Podemos ver que por ejemplo en la barra FIM est en un voltaje de 0.709 p.u. y el voltaje
mximo permitido es 0.9 p.u este se encuentra por debajo en 0.224.
Anlisis de cortocircuito trifsico norma IEC (resaltando barra ms fuerte)

Name In Folder Ik" Sk" Sb


kA MVA MVA
Terminal(14) Grid 150.15 3588.935 2380.929
FIC Grid 3.56459 1389.161 1297.773
FAUA Grid 3.43471 1338.544 1254.047
1 Double Busbar(1) 3.36083 1309.754 1232.754
2 Double Busbar(1) 3.36083 1309.754 1232.754
3 Double Busbar(1) 3.36083 1309.754 1232.754
4 Double Busbar(1) 3.36083 1309.754 1232.754
5 Double Busbar(1) 3.36083 1309.754 1232.754
6 Double Busbar(1) 3.36083 1309.754 1232.754
7 Double Busbar(1) 3.36083 1309.754 1232.754
8 Double Busbar(1) 3.36083 1309.754 1232.754
9 Double Busbar(1) 3.36083 1309.754 1232.754
FIEE Double Busbar(1) 3.36083 1309.754 1232.754
FIEE(1) Double Busbar(1) 3.36083 1309.754 1232.754

Anlisis de cortocircuito monofsico norma IEC (resaltando barra ms fuerte)

Name In Folder Ik" A Sk" A


kA MVA
FIC Grid 3.129669 406.5559
Terminal(14) Grid 50.82239 404.924
FAUA Grid 3.05541 396.9094
1 Double Busbar(1) 2.881141 374.2712
2 Double Busbar(1) 2.881141 374.2712