BLT-IFS design has been completed including proto-type
development in a record time of 3 months and its drawings and construction guidelines has been prepared which has been approved by the Railway Board vide letter dt. 13.12.2013. The drawing & construction guidelines have been sent to zonal railways on 16.12.2013 for undertaking the trial