CONSULTANT COMMENTS :

1. Lighting control system protocol shall comply with the dimming protocol of the approved light fittings as
per contract specification.
2. Follow the lighting system as per latest approved detailed design development drawing GE-196, GE-
197, and GE-198 on transmittal No OT/MAK/EL/26/933.
3. Motion/Occupancy/Daylight sensors shall be shown as per latest approved design.
4. Provide separate circuit for charging battery of BB light fixtures.
5. Lux level calculations shall be match the relevant levels as per contract specifications, MEW regulations
and MOH requirements,
6. Co-ordinate the latest reflected ceiling layout, latest architecture layout and all other services and trades.
7. The entire lighting installation shall be as per MEW regulations.
8. Refer to comments as indicated on the drawing and DB schedule.

CONSULTANT COMMENTS :
1. Lighting control system protocol shall comply with the dimming protocol of the approved light fittings as
per contract specification.
2. Follow the lighting system as per latest approved detailed design development drawing GE-196, GE-
197, and GE-198 on transmittal No OT/MAK/EL/26/933.
3. Motion/Occupancy/Daylight sensors shall be shown as per latest approved design.
4. Provide separate circuit for charging battery of BB light fixtures.
5. Lux level calculations shall be match the relevant levels as per contract specifications, MEW regulations
and MOH requirements,
6. Co-ordinate the latest reflected ceiling layout, latest architecture layout and all other services and trades.
7. The entire lighting installation shall be as per MEW regulations.
8. Refer to comments as indicated on the drawing and DB schedule.

CONSULTANT COMMENTS :
1. Lighting control system protocol shall comply with the dimming protocol of the approved light fittings as
per contract specification.
2. Follow the lighting system as per latest approved detailed design development drawing GE-196, GE-
197, and GE-198 on transmittal No OT/MAK/EL/26/933.
3. Motion/Occupancy/Daylight sensors shall be shown as per latest approved design.
4. Provide separate circuit for charging battery of BB light fixtures.
5. Lux level calculations shall be match the relevant levels as per contract specifications, MEW regulations
and MOH requirements,
6. Co-ordinate the latest reflected ceiling layout, latest architecture layout and all other services and trades.
7. The entire lighting installation shall be as per MEW regulations.
8. Refer to comments as indicated on the drawing and DB schedule.

You might also like