METHOD STATEMENT
FOR
ON SITE PULL-OUT TEST FOR SOIL NAILS / DEADMAN ANCHOR
A. Equipment Needed
1. 1 No Hollow Hydraulic Stressing Jack for the minimum capacity
of the anchor to be tested.
2. 1 No prepared Anchor Tip protruded out to fit stressing jack
with Lock-nuts prepared with C-channels ready welded (see
Typical Details of Waling System).
3. 2 Nos calibrated Dial Gauge
4. 1 No calibrated Pressure Gauge
5. 1 No Hydraulic Pump
B. Setup
1. Install the Soil Nail / Deadman Anchor with bar, leaving the
rebar protruded out of the sheet pile wall and C-channel
another approximately 500-600mm, to suit the hydraulic jack.
2. Place the hydraulic jack onto the C-channel with Bearing
Plates (see diagram) and secure the T32 rebar going through
the hollow jack with the lock nuts.
3. Ensure the jack is not fully retracted. Allow approximately 1
of jack ram un-retracted. Lock the lock nuts firmly.
Method Statement
On Site Pull-Out Test for Soil Nail / Deadman Anchor.
4. Setup an independent frame to place the dial gauges. This
frame can rest onto the sheet pile wall or planted firmly into
the ground.
5. Place the 2 Nos dial gauges on either side of the end of the
base plate at the tip of the jack, so as to measure the
extension of the jack while stressing.
Fig 1 : The setup of the test frame for the Soil Nail / Deadman
Anchor Pullout Test.
Method Statement
On Site Pull-Out Test for Soil Nail / Deadman Anchor.
C. Test Method
50% 5 min
100% 5 min
125% 5 min
150% 15 min
100% 5 min
50% 5 min
0% 15 min