1 A. PREPARATION WORK
Land cleaning, forest (after tree cutting) include lrees less
1 1 than 15 cm dia and height below 2 m
Tota
CE
m3 540.0 12,500.00
m3 61.31 265,000.00
\ Ea 10.00 35,000.00
ganya sama
lapangan (jika ada perubahan harus tertulis)
n, PPE, MCU
but oleh subcont
7 kepada team bidding Sarku Jakarta
r potongan pembayaran hanya 2% apabila tidak di lampirkan SUJK maka potongan sebesar 4%.
ESTIMATE
Remark
QUANTITY
4,860,000.00
19,114,800.00
Pondation Support
10,762,500.00
2,450,000.00
10,147,500.00
350,000.00
113,012,150.00
Time Schedule -Proximal - Trenching Cable for Bidding
(AWI 1 to AWI 13)
ESTIMATE VALUE
NO WORK ITEMS DESCRIPTION MONT 1 MONT 2
QUANTITY %
1 A. PREPARATION WORK
Land cleaning, forest (after tree cutting) include lrees less
1 1 4,860,000.00 4.30 1.43 1.43 1.43
than 15 cm dia and height below 2 m
2 2 Backlif (including compaction & Cleaning after excavation) 19,114,800.00 16.91 2.42 2.42
2 3 Supply material and install lean concrete 5,225,000.00 4.62 0.66 0.66 0.66
2 5 Supply & Install Wairing tape (Clour Black + Yellow) 6,750,000.00 5.97 0.85 0.85 0.85
2 6 Supply & pour sand 16,247,150.00 14.38 2.05 2.05 2.05
3 B. TRENCING CABLE
3 1 Install Power cablle - above ground, underground, in wall 10,762,500.00 9.52 1.36 1.36
Pondation Support