HERVE Engineering Training

BARON

Welcome to this presentation.

It is part of a suite of Engineering training modules.

It shows the activities and deliverables of the Piping


Engineering discipline.

Comments are most welcome (herve.baron@gmail.com),


which I will incorporate for the benefit of all.

Please download this file so that you can see my trainers


notes in the top left corner latest Acrobat Pro feature.

2015 Herv Baron


Herv
HERVE Engineering disciplines: activities and deliverables
BARON

PROCESS

PLANT LAYOUT

EQUIPMENT

SAFETY & ENVIRONMENT

CIVIL

PIPING

PIPELINE

2015 Herv Baron


INSTRUMENTATION

ELECTRICAL
HERVE
BARON

Process design

PFDs P&IDs We are


here
H&M balance
Piping
Instrumentation

Equipment specification
Process
data sheet Vendor
Rotating drawings Layout
Pressure vessels
Fired equipment Civil

2015 Herv Baron


Heat exchangers
Electrical
Packages etc.
HERVE Piping discipline
BARON

Plant Layout &


Piping discipline

Piping Piping Piping stress


Plant Layout
installation materials analysis

2015 Herv Baron


HERVE Piping installation
BARON

2015 Herv Baron


Unit Plot Plan Line diagram
HERVE Piping study & layouts
BARON

2015 Herv Baron


Piping layout
Line diagram
HERVE Piping study
BARON

2015 Herv Baron


HERVE Piping study
BARON
Requirements from Process

2015 Herv Baron


HERVE Piping routing/provision for flexibility
BARON

2015 Herv Baron


HERVE Piping layout
BARON

Important considerations
for piping layouts:

Operator access to:


Valves
Instruments

2015 Herv Baron


HERVE Piping Routing
BARON

2015 Herv Baron


HERVE Piping Routing
BARON

2015 Herv Baron


HERVE Piping layout
BARON

Important considerations
for piping layouts:

Operator access to:


Valves
Instruments

Straight pipe lengths


upstream & downstream
flow meters

Straight pipe lengths


upstream & downstream
control valves

PSVs and BDVs located at


high points with slopes on

2015 Herv Baron


both side lines

Safe location of vents


HERVE Piping design basis
BARON

The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)

Contents include

Provisions for future


Clearance
Valve accessibility

2015 Herv Baron


HERVE Piping design basis
BARON

The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)

Contents include

Provisions for future


Clearance
Valve accessibility

2015 Herv Baron


HERVE Piping design basis
BARON

The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)

Contents include

Provisions for future, e.g., spare space on pipe-racks and sleeper ways
Clearance
Valve accessibility

2015 Herv Baron


HERVE Piping design basis
BARON

The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)

Contents include

Provisions for future


Clearance
Valve accessibility

2015 Herv Baron


HERVE Piping design basis
BARON

The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)

Contents include

Provisions for future


Clearance
Valve accessibility

2015 Herv Baron


HERVE Piping Layout/3D model
BARON

2015 Herv Baron


Piping layout
HERVE Piping modelling in 3D model
BARON

2015 Herv Baron


HERVE 3D model reviews
BARON

Second model review:

When 60% of the piping is modelled, i.e., all 4 and larger indicated on P&IDs

Aspects reviewed: location of individual items (valves, instruments, junction boxes, panels),
arrangement around all equipment, location of fire fighting equipment, confirm space around
equipment for maintenance based on vendor requirements, handling equipment (hoist/davit),
platforms for all accesses required for operation

Third model review:

When 90% of Piping is modelled, i.e., all 2" and larger as indicated on P&IDs

Allows to start ISOs production after implementation of comments raised.


Aspects reviewed: accesses to all remaining items (flanged joints etc.), location of remaining items
(utility stations etc.).

2015 Herv Baron


HERVE Piping drawing extraction
BARON

2015 Herv Baron


HERVE Isometric drawings
BARON

2015 Herv Baron


HERVE Isometric drawings
BARON

2015 Herv Baron


HERVE Isometric drawings
BARON

What checks would you


do before issuing an
isometric drawing?

2015 Herv Baron


HERVE Isometric drawings
BARON

2015 Herv Baron


HERVE Piping Isometric
BARON

2015 Herv Baron


HERVE Piping Isometric
BARON

2015 Herv Baron


HERVE Piping design iso vs Shop iso
BARON

2015 Herv Baron


HERVE Post weld heat treatment
BARON

2015 Herv Baron


HERVE Post weld heat treatment
BARON

When is PWHT
applied?

2015 Herv Baron


HERVE Post weld heat treatment
BARON

When is PWHT
applied?

2015 Herv Baron


For sour service
(NACE) and above
19mm w.t. (B31.3)
HERVE Piping inspection and testing
BARON
How is the % of welds
to be RT defined?

2015 Herv Baron


HERVE Piping NDE
BARON

ANSI B31.3 Requirements:

Extent of RT/US (for circumferential welds) shall be as follows, or


to any greater extent specified in the engineering design:
Normal Fluid Service 5%, random selection to cover work of
each welder
Category D fluid Visual only
Severe Cyclic Conditions 100%

States that supplementary examinations and any acceptance


criteria that differs shall be specified in the engineering design
Therefore ASME B31.3 gives minimum requirements and
Client shall include in Design Basis a specification for higher

2015 Herv Baron


inspection requirements (see example that follows)
HERVE Piping NDE
BARON

ANSI B31.3 Requirements:

Extent of RT/US (for circumferential welds) shall be as follows, or


to any greater extent specified in the engineering design:
Normal Fluid Service 5%, random selection to cover work of
each welder
Category D fluid Visual only
Severe Cyclic Conditions 100%

States that supplementary examinations and any acceptance


criteria that differs shall be specified in the engineering design
Therefore ASME B31.3 gives minimum requirements and
Client shall include in Design Basis a specification for higher

2015 Herv Baron


inspection requirements (see example that follows).

On what criteria will they be based?


HERVE Piping NDE
BARON

ANSI B31.3 Requirements:

Extent of RT/US (for circumferential welds) shall be as follows, or


to any greater extent specified in the engineering design:
Normal Fluid Service 5%, random selection to cover work of
each welder
Category D fluid Visual only
Severe Cyclic Conditions 100%

States that supplementary examinations and any acceptance


criteria that differs shall be specified in the engineering design
Therefore ASME B31.3 gives minimum requirements and
Client shall include in Design Basis a specification for higher

2015 Herv Baron


inspection requirements (see example that follows).

On what criteria will they be based? Service + pressure class


HERVE Piping NDE
BARON

2015 Herv Baron


HERVE Piping general arrangement drawing
BARON

2015 Herv Baron


HERVE Piping Hydrotest
BARON

2015 Herv Baron


HERVE Piping Hydrotest
BARON

ASME B31.3 requires:

Hydrostatic leak test at 1.5 times the design pressure

If Owner considers that hydrostatic leak test is impracticable, a


pneumatic test may be substituted

At the Owners option, a service test can be done in lieu of


hydrostatic leak test for category D fluids, i.e.,
Nonflammable, non toxic
and
Design Pressure < 10 barg

2015 Herv Baron


For which fluids is it common to do a service test?
HERVE Piping Hydrotest
BARON

ASME B31.3 requires:

Hydrostatic leak test at 1.5 times the design pressure

If Owner considers that hydrostatic leak test is impracticable, a


pneumatic test may be substituted

At the Owners option, a service test can be done in lieu of


hydrostatic leak test for category D fluids, i.e.,
Nonflammable, non toxic
Design Pressure < 10 barg

2015 Herv Baron


What does ASME B31.3 says about golden welds?
HERVE Piping Hydrotest
BARON

ASME B31.3 requires:

Hydrostatic leak test at 1.5 times the design pressure

If Owner considers that hydrostatic leak test is impracticable, a


pneumatic test may be substituted

At the Owners option, a service test can be done in lieu of


hydrostatic leak test for category D fluids, i.e.,
Nonflammable, non toxic
Design Pressure < 10 barg

Closure welds. The final weld connecting piping systems which

2015 Herv Baron


have been successfully tested need not be tested provided the
weld passes with 100% RT or US.
HERVE Piping installation work process
BARON

Line Piping Isometric


Plot Plan 3D model
Diagram Layout drawing

2015 Herv Baron


HERVE Piping discipline
BARON

Plant Layout &


Piping discipline

Piping Piping Piping stress


Plant Layout
installation materials analysis

2015 Herv Baron


HERVE Piping stress analysis
BARON

2015 Herv Baron


HERVE Piping stress analysis
BARON

Which calculations are done

2015 Herv Baron


for Piping?
HERVE Piping stress analysis
BARON

2015 Herv Baron


By how much does a 10 meter long
carbon steel line expand when its
temperature increases by 100C?
HERVE Piping Flexibility and Stress Analysis Criteria
BARON

Not all lines are subject to calculation for stress.


This is defined in the Piping Flexibility and Stress Analysis Criteria.

2015 Herv Baron


HERVE Piping Flexibility and Stress Analysis Criteria
BARON

Not all lines are subject to calculation for stress.

This is defined in the Piping Flexibility and Stress Analysis Criteria.

Level 1 : Visual Analysis


No stress analysis is required. The piping lines are routed and supported
by piping designers as per usual practice.

Level 2: Simplified Analysis


This method includes the use of charts, cantilever method or simplified
formulae.

Level 3: Detailed analysis

2015 Herv Baron


Detailed analysis by computer program shall be carried out.
HERVE Piping Flexibility and Stress Analysis Criteria
BARON

Not all lines are subject to calculation for stress.

This is defined in the Piping Flexibility and Stress Analysis Criteria.

Level 1 : Visual Analysis


No stress analysis is required. The piping lines are routed and supported
by piping designers as per usual practice.

Level 2: Simplified Analysis


This method includes the use of charts, cantilever method or simplified
formulae.

Level 3: Detailed analysis

2015 Herv Baron


Detailed analysis by computer program shall be carried out.

On which basis is the category of a line decided?


HERVE Piping Flexibility and Stress Analysis Criteria
BARON

Line temperature Level 1 : Visual Analysis


Line diameter Level 2: Simplified Analysis
Level 3: Detailed analysis

FAT: FLEXIBILITY ANALYSIS TEMPERATURE (C) (Note 9)


PIPING LINE TYPE Amb Tref: 20C
PIPE SIZE (INCHES)
CONNECTION TYPE (Note 9)
FAT (C)
2 3 4 6 8 10 12 14 16 18 20 22 24 26 28 > 28"
400

Non-fragile equipment and/or 300


low movements (<600#)
Level 2 Level 3
A
Carbon steel 200
(Note 7)
100 Level 1
0

2015 Herv Baron


HERVE Piping Flexibility and Stress Analysis Criteria
BARON

Line temperature Level 1 : Visual Analysis


Line diameter Level 2: Simplified Analysis
Criticality of equipment Level 3: Detailed analysis

FAT: FLEXIBILITY ANALYSIS TEMPERATURE (C) (Note 9)


PIPING LINE TYPE Amb Tref: 20C
PIPE SIZE (INCHES)
CONNECTION TYPE (Note 9)
FAT (C)
2 3 4 6 8 10 12 14 16 18 20 22 24 26 28 > 28"
400

Non-fragile equipment and/or 300


low movements (<600#)
Level 2 Level 3
A
Carbon steel 200
(Note 7)
100 Level 1
0

2 3 4 6 8 10 12 14 16 18 20 22 24 26 28 > 28"
Rotating machines

2015 Herv Baron


400
Plate exchangers
300
D Cold boxes - Air cooler Level 3
200
Turbine -Furnace
100
(Note 10) Level 1 Level 2
0
HERVE Piping Flexibility and Stress Analysis Criteria
BARON

Line temperature Level 1 : Visual Analysis


Line diameter Level 2: Simplified Analysis
Criticality of equipment Level 3: Detailed analysis
Material
FAT: FLEXIBILITY ANALYSIS TEMPERATURE (C) (Note 9)
PIPING LINE TYPE Amb Tref: 20C
PIPE SIZE (INCHES)
CONNECTION TYPE (Note 9)
FAT (C)
2 3 4 6 8 10 12 14 16 18 20 22 24 26 28 > 28"
400

Non-fragile equipment and/or 300


low movements (<600#)
Level 2 Level 3
A
Carbon steel 200
(Note 7)
100 Level 1
0

2 3 4 6 8 10 12 14 16 18 20 22 24 26 28 > 28"
400

2015 Herv Baron


Non-fragile equipment and/or 300 Level 3
low movements (<600#)
B
Stainless steel 200
Level 1 Level 2
(Note 7) - (Note 10)
100

0
HERVE Piping stress analysis Calculation note
BARON

2015 Herv Baron


HERVE Piping loads studies
BARON

2015 Herv Baron


HERVE Piping Supports
BARON

2015 Herv Baron


HERVE Pipe support book
BARON

2015 Herv Baron


HERVE Piping Support Book
BARON

2015 Herv Baron


HERVE Pipe support standard
BARON

2015 Herv Baron


HERVE Piping Support Book
BARON

2015 Herv Baron


HERVE Special supports
BARON

2015 Herv Baron


HERVE Spring supports
BARON

2015 Herv Baron


HERVE Spring supports
BARON

2015 Herv Baron


HERVE Design of line supports
BARON

Besides critical lines, the support of some other lines has to be studied.

This is the case for:

Lines subject to water hammer (also called surge)

Lines subject to 2 phase flow

Lines subject to flow or accoustic vibration

2015 Herv Baron


HERVE Design of line supports
BARON

Besides critical lines, the support of some other lines has to be studied.

This is the case for:

Lines subject to water hammer (also called surge)

What type of lines are subject to water hammer?

2015 Herv Baron


HERVE Design of line supports
BARON

Besides critical lines, the support of some other lines has to be studied.

This is the case for:

Lines subject to water hammer (also called surge)

What type of lines are subject to water hammer?

What is the work process for such lines?

2015 Herv Baron


HERVE Design of line supports
BARON

Besides critical lines, the support of some other lines has to be studied.

This is the case for:

Lines subject to water hammer (also called surge)

Lines subject to 2 phase flow

How and by whom are 2 phase flow lines identified?

2015 Herv Baron


HERVE Design of line supports
BARON

Besides critical lines, the support of some other lines has to be studied.

This is the case for:

Lines subject to water hammer (also called surge)

Lines subject to 2 phase flow

Lines subject to flow or accoustic vibration

What type of lines are subject to accoustic vibration?

2015 Herv Baron


HERVE Design of line supports
BARON

Besides critical lines, the support of some other lines has to be studied.

This is the case for:

Lines subject to water hammer (also called surge)

Lines subject to 2 phase flow

Lines subject to flow or accoustic vibration

What type of lines are subject to accoustic vibration?

What special design features are incorporated for these lines?

2015 Herv Baron


HERVE Piping installation work process
BARON

Plot Piping Piping Piping 3D Piping Piping


Plan line studies isometric Stress isometric
modelling
diagram & layout drawing OK? drawing IFC

Sometimes, another check is


done. Which one?

2015 Herv Baron


Piping stress analysis
HERVE Piping installation work process
BARON

Plot Piping Piping Piping 3D Piping Piping


Plan line studies isometric Stress Process isometric
modelling
diagram & layout drawing OK? OK? drawing IFC

2015 Herv Baron


Piping stress analysis
HERVE Piping discipline
BARON

Plant Layout &


Piping discipline

Piping Piping Piping stress


Plant Layout
installation materials analysis

2015 Herv Baron


HERVE Piping discipline
BARON

Plant Layout &


Piping discipline

Piping Piping Piping stress


Plant Layout
installation materials analysis

Materials/corrosion,

2015 Herv Baron


insulation, painting
HERVE Piping Material: line pipe, fittings
BARON

2015 Herv Baron


HERVE Material selection
BARON
Selection of steel based on design temperature
STEEL TEMPERATURE RANGE Based on ASME B31.3 edition 2004
- 254C - 198 - 101 - 73 - 46 - 40 - 29 37,8 343 371 427 538 593 650 732 816C

- 425F - 325 - 150 - 100 - 50 - 40 - 20 100 650 700 800 1000 1100 1200 1350 1500F

Low temperature

down to -29C CS
-29C to -46C LTCS
-59C to -101C 3 Nickel
-101C to -195C 9 Nickel
-195C to -254C SS 304, 316, 321, 304L, 316L

High temperature
up to 427C CS

2015 Herv Baron


up to 593C Cr-Mo (typ. 1.25-0.5) Alloy CS
up to 816C SS 304H, 316H, 321H
HERVE Material selection
BARON
Case study: Oil & Gas production facility

2015 Herv Baron


HERVE Material selection
BARON
Case study: Oil & Gas production facility

2015 Herv Baron


HERVE Material selection
BARON
Case study: Oil & Gas production facility

2015 Herv Baron


HERVE Material selection
BARON
Case study: Oil & Gas production facility

2015 Herv Baron


HERVE Material Selection
BARON
Corrosion and Material Selection Report

2015 Herv Baron


HERVE Material Selection
BARON
Corrosion and Material Selection Report

2015 Herv Baron


HERVE Material Selection
BARON
Corrosion and Material Selection Report

2015 Herv Baron


HERVE Material Selection and corrosion control specification
BARON
(pipes)

STREA
Op.
M COMPOSITI Des. T Op. P Des. P
FLUID TYPE T. MATERIAL SELECTION COMMENT
NUMBE ON (C) (barg) (barg)
(C)
R
5-15g/L The design temperature of 80C is
K41,
Barren H2SO4 47 only expected when the line is
AA01, 35 5.9 9.8 HDPE / GRP
Solution 0.9 g/L Cl- (80) empty; in presence of flowing liquid
AA02
pH 1 the design temperature is 47C.

Concentrat
AM05, Refer to 9806J-0000-JSD-2400-003
ed 98.5wt%
AA03, 35 80 5.4 9.3 High Silicon SS For safety consideration High Silicon
Sulphuric H2SO4
AA04 SS selection preferred to CS.
Acid

The design temperature of 80C is


V23,
Process Process 47 only expected when the line is
AA08, 35 0 0 HDPE
Water Water (80) empty; in presence of flowing liquid
AA09
the design temperature is 47C.

2015 Herv Baron


Air
- 35 80 Atm. Atm. CS + 1.5mm CA To filtration
Air + Ore dust
- Air 35 80 Atm. Atm. CS + 1.5mm CA To atmosphere
HERVE Material Selection and corrosion control specification
BARON
(equipment)

2015 Herv Baron


HERVE Material selection
BARON
Material Selection Diagrams

2015 Herv Baron


HERVE Sour service
BARON

What is Sour service?

2015 Herv Baron


HERVE Sour service
BARON

What is Sour service?

Fluids containing water + a certain amount of H2S

The concentration of H2S above which the service is considered


sour is specified in NACE MR0175 for Upstream (oil & gas
production) applications and in NACE MR0103 for Downstream
(Refinery) applications.

2015 Herv Baron


HERVE Sour service
BARON

What happens to materials subject to Sour service?

2015 Herv Baron


HERVE Sour service
BARON

What happens to materials subject to Sour service?

Phenomenon: Presence of H2S in the aqueous solution causes the


steel to absorb a large amount of H2. The steel is subject to
cracking above a critical concentration of hydrogen absorbed.
This cracking is called Sulfide Stress Cracking (SSC).

The possible loss of containment resulting from this cracking


causes a particularly severe hazard as H2S is fatal in minutes.

2015 Herv Baron


HERVE Sour service
BARON

What happens to materials subject to Sour service?

Phenomenon: Presence of H2S in the aqueous solution causes the


steel to absorb a large amount of H2. The steel is subject to
cracking above a critical concentration of hydrogen absorbed.
This cracking is called Sulfide Stress Cracking (SSC).

The possible loss of containment resulting from this cracking


causes a particularly severe hazard as H2S is fatal in minutes.

How to avoid this?

2015 Herv Baron


HERVE Sour service
BARON

What happens to materials subject to Sour service?

Phenomenon: Presence of H2S in the aqueous solution causes the


steel to absorb a large amount of H2. The steel is subject to
cracking above a critical concentration of hydrogen absorbed.
This cracking is called Sulfide Stress Cracking (SSC).

The possible loss of containment resulting from this cracking


causes a particularly severe hazard as H2S is fatal in minutes.

How to avoid this?

Apply requirements of NACE:

2015 Herv Baron


Base materials: chemical composition, max hardness, heat
treatment
Welds: limit hardness by PWHT
HERVE Piping discipline
BARON

Plant Layout &


Piping discipline

Piping Piping Piping stress


Plant Layout
installation materials analysis

2015 Herv Baron


HERVE Piping Material Classes Specification
BARON

Piping fluids list

2015 Herv Baron


HERVE Piping material class specification
BARON

2015 Herv Baron


HERVE Piping material
BARON
Wall thickness calculation
Design code for Process plants: ASME B31.3

P*D
t=
(2SWE + PY)

P design pressure
D (outside) diameter
S stress value for material as per table in ASME B31.3
W weld joint reduction factor for long term strength of weld at elevated temperature
E quality factor, from table in ASME B31.3 (1 for seamless, 0.85 for ER welded pipe, etc.)
Y coefficient from table in ASME B31.3 (from 0.4 to 0.7 depending on material and temperature)

2015 Herv Baron


To the above calculated thickness shall be added:
- The corrosion allowance, e.g., 3 mm
- The manufacturing tolerance: 12.5%
HERVE Piping material class specification
BARON

2015 Herv Baron


HERVE Piping material class specification
BARON

2015 Herv Baron


HERVE Piping material class specification
BARON

2015 Herv Baron


HERVE Piping material class specification
BARON
ASME B16.5 Flanges

2015 Herv Baron


HERVE Piping material class specification
BARON

2015 Herv Baron


HERVE Piping material class specification
BARON

2015 Herv Baron


HERVE Piping material requisition
BARON

The Piping MTO is issued 3 times as a minimum:

1st MTO: issued for Inquiry, to get the Unit prices


2nd MTO: issued for Order
3rd and subsequent MTOs: to top-up

On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?

2015 Herv Baron


HERVE Piping material requisition
BARON

The Piping MTO is issued 3 times as a minimum:

1st MTO: issued for Inquiry, to get the Unit prices


2nd MTO: issued for Order
3rd and subsequent MTOs: to top-up

On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?

1st MTO:

2015 Herv Baron


HERVE Piping material requisition
BARON

The Piping MTO is issued 3 times as a minimum:

1st MTO: issued for Inquiry, to get the Unit prices


2nd MTO: issued for Order
3rd and subsequent MTOs: to top-up

On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?

1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)

2015 Herv Baron


HERVE Piping material requisition
BARON

The Piping MTO is issued 3 times as a minimum:

1st MTO: issued for Inquiry, to get the Unit prices


2nd MTO: issued for Order
3rd and subsequent MTOs: to top-up

On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?

1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
2nd MTO

2015 Herv Baron


HERVE Piping material requisition
BARON

The Piping MTO is issued 3 times as a minimum:

1st MTO: issued for Inquiry, to get the Unit prices


2nd MTO: issued for Order
3rd and subsequent MTOs: to top-up

On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?

1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part)

2015 Herv Baron


How are Quantities to purchase (BOM) obtained
from the MTO quantities?
HERVE Material Take-Offs
BARON
Piping material

Piping
specifications

Piping installation MTO quantities

- Uncertain items
Bill of Material
P&IDs Materials Requisition
+ Allowances for
cut & losses
MTO
+ Estimates of
Piping what is not
routing / taken-off
layout

2015 Herv Baron


+ Allowances for
design
development
HERVE Piping material requisition
BARON

The Piping MTO is issued 3 times as a minimum:

1st MTO: issued for Inquiry, to get the Unit prices


2nd MTO: issued for Order
3rd and subsequent MTOs: to top-up

On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?

1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part)
3rd and subsequent MTOs

2015 Herv Baron


HERVE Piping material requisition
BARON

The Piping MTO is issued 3 times as a minimum:

1st MTO: issued for Inquiry, to get the Unit prices


2nd MTO: issued for Order
3rd and subsequent MTOs: to top-up

On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?

1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part)
3rd and subsequent MTO: (IFC P&IDs) + isometrics (3D model)

2015 Herv Baron


HERVE Piping Material Management
BARON
Above ground Piping

P&ID IFR IFD IFC

Piping
1st MTO 2nd MTO 3rd MTO
Material
(for order) (top-ups)
Take-Offs (for inquiry)

Drawing Piping Piping layout Piping

2015 Herv Baron


routing drawings isometric
drawings drawings
HERVE Piping Material Management
BARON
Above ground Piping

RFQ 1st PO Final


qties

2015 Herv Baron


Line Piping Isometric
Plot Plan 3D model
Diagram Layout drawing
HERVE Piping Bill Of Materials
BARON
Final qties (from IFC isos)

- Ordered qties (MTO 2)


= additional qties to supply

2015 Herv Baron


HERVE Material Requisition
BARON

2015 Herv Baron


HERVE The Oil & Gas Engineering Guide
BARON

A unique synthetic overveiw of Engineering...

2015 Herv Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

2015 Herv Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

This suite of training modules


covered the discipline
chapters of the book...

2015 Herv Baron


HERVE The Oil & Gas Engineering Guide - 2nd edition
BARON
Table of Contents

The Guide contains much more:

The overall picture, interfaces,


methods & tools, etc.

2015 Herv Baron


HERVE The Oil & Gas Engineering Guide
BARON
2nd edition

Order direct from the publisher:

http://www.editionstechnip.com/en/catalogu
e-detail/1111/oil-gas-engineering-guide-
the.html

2015 Herv Baron