BARON
PROCESS
PLANT LAYOUT
EQUIPMENT
CIVIL
PIPING
PIPELINE
ELECTRICAL
HERVE
BARON
Process design
Equipment specification
Process
data sheet Vendor
Rotating drawings Layout
Pressure vessels
Fired equipment Civil
Important considerations
for piping layouts:
Important considerations
for piping layouts:
The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)
Contents include
The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)
Contents include
The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)
Contents include
Provisions for future, e.g., spare space on pipe-racks and sleeper ways
Clearance
Valve accessibility
The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)
Contents include
The Piping design basis, also called Job specification for design Piping, modifies and
supplements to design code (AME B31.3)
Contents include
When 60% of the piping is modelled, i.e., all 4 and larger indicated on P&IDs
Aspects reviewed: location of individual items (valves, instruments, junction boxes, panels),
arrangement around all equipment, location of fire fighting equipment, confirm space around
equipment for maintenance based on vendor requirements, handling equipment (hoist/davit),
platforms for all accesses required for operation
When 90% of Piping is modelled, i.e., all 2" and larger as indicated on P&IDs
When is PWHT
applied?
When is PWHT
applied?
2 3 4 6 8 10 12 14 16 18 20 22 24 26 28 > 28"
Rotating machines
2 3 4 6 8 10 12 14 16 18 20 22 24 26 28 > 28"
400
0
HERVE Piping stress analysis Calculation note
BARON
Besides critical lines, the support of some other lines has to be studied.
Besides critical lines, the support of some other lines has to be studied.
Besides critical lines, the support of some other lines has to be studied.
Besides critical lines, the support of some other lines has to be studied.
Besides critical lines, the support of some other lines has to be studied.
Besides critical lines, the support of some other lines has to be studied.
Materials/corrosion,
- 425F - 325 - 150 - 100 - 50 - 40 - 20 100 650 700 800 1000 1100 1200 1350 1500F
Low temperature
down to -29C CS
-29C to -46C LTCS
-59C to -101C 3 Nickel
-101C to -195C 9 Nickel
-195C to -254C SS 304, 316, 321, 304L, 316L
High temperature
up to 427C CS
STREA
Op.
M COMPOSITI Des. T Op. P Des. P
FLUID TYPE T. MATERIAL SELECTION COMMENT
NUMBE ON (C) (barg) (barg)
(C)
R
5-15g/L The design temperature of 80C is
K41,
Barren H2SO4 47 only expected when the line is
AA01, 35 5.9 9.8 HDPE / GRP
Solution 0.9 g/L Cl- (80) empty; in presence of flowing liquid
AA02
pH 1 the design temperature is 47C.
Concentrat
AM05, Refer to 9806J-0000-JSD-2400-003
ed 98.5wt%
AA03, 35 80 5.4 9.3 High Silicon SS For safety consideration High Silicon
Sulphuric H2SO4
AA04 SS selection preferred to CS.
Acid
P*D
t=
(2SWE + PY)
P design pressure
D (outside) diameter
S stress value for material as per table in ASME B31.3
W weld joint reduction factor for long term strength of weld at elevated temperature
E quality factor, from table in ASME B31.3 (1 for seamless, 0.85 for ER welded pipe, etc.)
Y coefficient from table in ASME B31.3 (from 0.4 to 0.7 depending on material and temperature)
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?
1st MTO:
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?
1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?
1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
2nd MTO
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?
1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part)
Piping
specifications
- Uncertain items
Bill of Material
P&IDs Materials Requisition
+ Allowances for
cut & losses
MTO
+ Estimates of
Piping what is not
routing / taken-off
layout
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?
1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part)
3rd and subsequent MTOs
On the basis of which document(s) are the 1st, 2nd and 3rd piping MTO
prepared?
1st MTO: P&IDs 1st issue + Plot Plan or Line diagram (if available)
2nd MTO: IFD P&IDs + Piping studies/layouts or 3D model (part)
3rd and subsequent MTO: (IFC P&IDs) + isometrics (3D model)
Piping
1st MTO 2nd MTO 3rd MTO
Material
(for order) (top-ups)
Take-Offs (for inquiry)
http://www.editionstechnip.com/en/catalogu
e-detail/1111/oil-gas-engineering-guide-
the.html