Profile Optimization Report

Autodesk InfraWorks 360 Track ID: V2016A05451293, Date: 03/01/2016

3 75
1

72
2

70

67

8
64
0 80 160 240 310 380 450 520 590 660 740 820 900 980 1,060 1,140 1,210 1,280 1,355 1,430 1,566

Road profile; PVI; Fixed; Curve start/end; Waste pit; Borrow pit; Elevation scale 46.2 : 1

1. Profile Information
Total project cost: $646,770 Number of PVIs: 8
Linear unit: meter Maximum grade: 5.00 %
Design speed: 30 Required drainage grade: 0.00 %
Length: 1,566.02 Minimum PVI spacing: 18.75

2. Construction Information
Total construction cost: $583,957 Maximum fill height before bridge: 10.00
Number of bridges: 0 Maximum cut depth before tunnel: 20.00
Number of tunnels: 0 Sample line distance: 10.00

2.1. Road Assembly Information. The construction cost for a sample line subsection with a road assembly is l times the road cost per linear
unit.
wd

l: Sample line distance


wr l wr : Road width
wd : Datum width

Road cost per linear meter: $372.54 Daylight cut slope: 0.33
Road width: 5.00 Daylight fill slope: 0.33
Datum width: 10.40

The construction costs are computed at every sample line, using a selected assembly or style, and a sample line distance for the length of a construction subsection. Individual cost
computations for the different assemblies are explained below. The total construction cost is the sum of the individual subsection costs.

The road cost per linear unit iswr (0.3 C + 0.7 A) + D + S + L + G, where C is the cement pavement cost per square unit,A is the asphalt pavement cost per square unit, D
is the cost for drainage, S for signing, L for lighting, and G for signaling per linear unit.
The road width is the number of road lanes multiplied by the width of a road lane. It does not include the width of medians, sidewalks, etc.

1
3. Earthwork Information
Total earthwork cost: $62,813 Max section length: 136.02
Num earthwork sections: 20 Num waste pits: 1
Num earthwork sub-sections: 186 Num borrow pits: 1
Num. stratum: 1 Swath width: 31.20

3.1. Earthwork for Strata Layer 1.


Cum. cut: 6,835.33 Excavation cost: $3.06
Cum. fill: 6,835.33 Load cost: $1.87
Net volume: 0.00 Haul cost (per km): $2.40
Volume unit: cubic meter Embankment cost: $4.41
Layer name: Waste cost: $.98
Reusability factor: 1.00 Borrow cost: $2.75

3.1.1. Mass diagram for strata layer 1.

1,608

-376
0 510 560580 650
662 695 726 791 847 914 979 1,111
1,139 1,563

75
72
70
67
64
0 80 160 240 310 380 450 520 590 660 740 820 900 980 1,060 1,140 1,210 1,280 1,355 1,430 1,566

Haul movements: Borrow Waste Local earthwork:


3.1.2. Hauling Scheme for strata layer 1. meter3 meter3 meter3 meter3

279 371 3 1,438 74

700 376 40 203 161

121 84 53 48

1 47 118 10 204

149 12 43 236 25 1,265

75 2 73 34 61

0 80 160 240 310 380 450 520 590 660 740 820 900 980 1,060 1,140 1,210 1,280 1,355 1,430 1,566

164 77 185 102 3

0 80 160 240 310 380 450 520 590 660 740 820 900 980 1,060 1,140 1,210 1,280 1,355 1,430 1,566

2
Cut area: 0.10
Station: 0.00
Fill area: 0.10
Road elevation: 74.04
Surface high: 74.18
Surface low: 73.76
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 13.27


Station: 80.00
Fill area: 0.00
Road elevation: 72.86
Surface high: 74.26
Surface low: 71.68
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.00


Station: 160.00
Fill area: 3.73
Road elevation: 71.69
Surface high: 72.00
Surface low: 70.43
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.00


Station: 240.00
Fill area: 5.09
Road elevation: 72.16
Surface high: 72.35
Surface low: 71.57
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 4.42


Station: 310.00
Fill area: 0.00
Road elevation: 72.66
Surface high: 74.00
Surface low: 71.93
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 16.48


Station: 380.00
Fill area: 0.00
Road elevation: 73.17
Surface high: 75.08
Surface low: 72.45
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

3
Cut area: 0.00
Station: 450.00
Fill area: 16.25
Road elevation: 73.68
Surface high: 73.00
Surface low: 71.05
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.29


Station: 520.00
Fill area: 0.56
Road elevation: 74.18
Surface high: 74.94
Surface low: 73.20
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 1.19


Station: 590.00
Fill area: 0.08
Road elevation: 73.89
Surface high: 74.39
Surface low: 73.53
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.33


Station: 660.00
Fill area: 0.74
Road elevation: 71.57
Surface high: 72.31
Surface low: 70.48
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.13


Station: 740.00
Fill area: 0.21
Road elevation: 71.03
Surface high: 72.00
Surface low: 71.00
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.00


Station: 820.00
Fill area: 4.96
Road elevation: 72.37
Surface high: 72.54
Surface low: 71.50
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

4
Cut area: 0.00
Station: 900.00
Fill area: 8.60
Road elevation: 72.22
Surface high: 72.92
Surface low: 70.63
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 21.02


Station: 980.00
Fill area: 0.00
Road elevation: 70.84
Surface high: 72.72
Surface low: 71.88
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.00


Station: 1,060.00
Fill area: 11.01
Road elevation: 69.46
Surface high: 70.93
Surface low: 67.94
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 2.01


Station: 1,140.00
Fill area: 0.00
Road elevation: 68.08
Surface high: 69.20
Surface low: 66.31
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 1.46


Station: 1,210.00
Fill area: 0.00
Road elevation: 66.87
Surface high: 67.84
Surface low: 67.00
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.00


Station: 1,280.00
Fill area: 7.93
Road elevation: 65.75
Surface high: 66.78
Surface low: 65.00
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

5
Cut area: 15.71
Station: 1,355.00
Fill area: 0.00
Road elevation: 67.84
Surface high: 69.39
Surface low: 68.12
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.00


Station: 1,430.00
Fill area: 4.20
Road elevation: 66.66
Surface high: 67.00
Surface low: 64.75
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

Cut area: 0.10


Station: 1,566.02
Fill area: 1.90
Road elevation: 64.51
Surface high: 65.84
Surface low: 63.91
Road cost per linear meter: $372.54
Road width: 5.00
Datum width: 10.40

4. Volume Report

Station: Cut area: Cut vol: Fill area: Fill vol. Cum. cut: Cum. fill: Cum. net:
(m2 ) (m3 ) (m2 ) (m3 ) (m3 ) (m3 ) (m3 )
0.00 0.10 0.00 0.10 0.00 0.00 0.00 0.00
80.00 13.27 1,100.49 0.00 0.50 1,100.49 0.50 1,099.99
160.00 0.00 148.60 3.73 427.17 1,249.09 427.67 821.42
240.00 0.00 0.00 5.09 700.09 1,249.09 1,127.76 121.33
310.00 4.42 122.45 0.00 75.09 1,371.54 1,202.85 168.69
380.00 16.48 383.64 0.00 12.26 1,755.17 1,215.11 540.07
450.00 0.00 539.54 16.25 163.87 2,294.72 1,378.97 915.74
520.00 0.29 1.57 0.56 917.32 2,296.29 2,296.29 -0.00
590.00 1.19 43.45 0.08 43.45 2,339.74 2,339.74 0.00
660.00 0.33 76.58 0.74 76.58 2,416.32 2,416.32 0.00
740.00 0.13 42.45 0.21 39.58 2,458.77 2,455.89 2.87
820.00 0.00 83.93 4.96 204.56 2,542.70 2,660.45 -117.75
900.00 0.00 426.75 8.60 73.37 2,969.45 2,733.82 235.63
980.00 21.02 202.98 0.00 623.90 3,172.44 3,357.72 -185.28
1,060.00 0.00 1,675.67 11.01 52.71 4,848.10 3,410.43 1,437.67
1,140.00 2.01 10.30 0.00 1,482.16 4,858.41 4,892.60 -34.19
1,210.00 1.46 219.94 0.00 24.56 5,078.35 4,917.15 161.20
1,280.00 0.00 149.96 7.93 102.12 5,228.31 5,019.27 209.04
1,355.00 15.71 278.19 0.00 203.98 5,506.50 5,223.25 283.25
1,430.00 0.00 1,326.29 4.20 61.02 6,832.79 5,284.27 1,548.52
1,566.02 0.24 2.54 1.46 1,551.06 6,835.33 6,835.33 -0.00

5. List of PVIs

6
PVI Station Elevation Curve length PVI Station Elevation Curve length
?1 0.00 74.04 0.00 5 856.30 72.98 18.00
2 164.83 71.61 18.00 6 1,289.88 65.49 40.35
3 576.99 74.60 87.17 7 1,341.19 68.06 18.00
4 695.49 70.28 31.88 ?8 1,566.02 64.51 0.00

6. Legal Reminder
All data and data files contained in the Profile Optimization Results are created as a result of your use of Profile Optimization for InfraWorks
360 and are subject to the Autodesk InfraWorks Software License Agreement and the Autodesk 360 Terms of Service you accepted prior to
your use of Profile Optimization.

You might also like