SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
TABLE OF CONTENTS
ENGG CERT
SS
SS
SS
1. INTRODUCTION 4
GH
GH
RH
1.1 Purpose 4
1.2 FACILITIES Overview 4
1.3 Operating Areas 4
1.4 Detailed Analyser Specification 5
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
2. GENERAL REQUIREMENTS 5
DESCRIPTION
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
3. ANALYSER INSTALLATION 10
3.1 General 10
REV. NO.
C
A
________________
5. ANALYSER SHELTER DESIGN 13
DATE ___________ 5.1 Shelter Layout and Design. 13
OPERATIONS
5.2 Shelter Construction 14
________
5.3 Heating Ventilation and Air Conditioning System (HVAC) 16
DATE ___________
5.4 Utilities 18
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
5.6 Electrical 20
5.7 Lighting 22
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
6. ANALYSERS 30
6.1 General Requirements for Analysers 30
6.2 Requirements For GC Analysers 34
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
REV. NO.
C
A
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
________
DATE ___________
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENGG CERT
1. INTRODUCTION
SS
SS
SS
1.1 Purpose
GH
GH
RH
The purpose of the facilities is to increase the Arab Light (AL) crude oil
production capacity of Khurais field from 1,200 MBCD to 1,500 MBCD. The
Khurais Central Producing Facilities (KhCPF) will be expanded to process
additional 300 MBCD of dry AL crude.
The project will design and install a fifth Crude Train at KhCPF to produce
the additional AL crude oil. The additional gas from the new oil train will
require installation of a third Gas Train with molecular sieve dehydrators.
10-01506-0001
10-01506-0001
10-01506-0001
13/12/13
19/02/14
DATE
Off plot scope includes installation of 48, 145 km Seawater supply line
from Ain Dar to KhCPF along with Ain Dar pumping station additional
REV. NO.
DISCIPLINE modification will be required to accommodate the full flow of Khurais Sour
ENGINEER
________________
Gas along with the Uthmaniyah Gas Plant Swing Flow. Additionally, two
DATE ___________
new residential buildings will be required along with all plant major electric
and non-electric utility systems and security infrastructure expansion
PROJECT
ENGINEER required to support operation of the proposed facilities at KhCPF and the
________________ residential area.
DATE ___________
CERTIFIED In addition to the 300 MBCD train in KhCPF, a Satellite Gas and Oil Plant
________________ (GOSP) is required to be situated between Abu Jifan and Mazalij fields.
DATE ___________
________________ For operability and maintenance reasons, the plant is divided into
DATE ___________
Operating Areas. This provides logical plant areas which are represented
OPERATIONS by major portions of plant within the Process.
________
Segregation of equipment within these Operating Areas provides a
DATE ___________
measure of isolation between principal sections of plant and equipment.
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
All Process Control System (PCS) I/O together with its related process
EDSD
control equipment and any other control equipment for each of the
Operating Areas shall be totally independent of each other.
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
2. GENERAL REQUIREMENTS
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
DISCIPLINE
Entire shelters, specific control room mounted equipment and analyser
ENGINEER local panels shall be assembled and fully functionally tested as a complete
________________
system at the analyser shelter Vendors factory prior to shipment to site.
DATE ___________
COMPANY shall witness selected analyser tests. All analyser FATs and
PROJECT
ENGINEER
appropriate intermediate testing shall be witnessed. Analyser shelters may
________________
contain a number of analysers supplied by different analyser
DATE ___________ manufacturers.
CERTIFIED
________________
The analyser shelters and local analyser panels shall be designed for
DATE ___________ installation upon a pre-prepared site. Major modular components shall not
require removal for shipping and re-assembly on site unless there is no
CONSTRUCTION
AGENCY
alternative due to transport or site plot restrictions. Site re-assembly shall
________________ be kept to a minimum and shall be subject to COMPANY approval. Major
DATE ___________ modular components include: HVAC unit, sample conditioning system
OPERATIONS
cabinets, external headers or connections for utilities, signal and power
cables, sample and return lines etc.
________
DATE ___________
Roof canopies, HVAC ducting, and Sandboxes may require removal for
shipment and re-assembly on site. However, these items should be pre-
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
analyser shelter.
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
All site connections for services, utilities, etc shall be on the outside of the
OF THIS DRAWING IS COVERED, FOR ALL
analyser shelters.
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
Connections for power and signal cables shall also be located on the
ENGG CERT
SS
SS
Fibre Optic cables transit the analyser shelter wall via transit frames and
GH
GH
RH
10-01506-0001
10-01506-0001
Standards
JO/EWO
13/12/13
19/02/14
DATE
DISCIPLINE
ENGINEER
________________
Where equipment is located outside hazardous certified areas then non-
DATE ___________
classified equipment may be used.
PROJECT
ENGINEER Refer to SAES-J-502 for additional requirements relating to electrical area
________________ classification and electrical system design.
DATE ___________
CERTIFIED Protection
________________
DATE ___________
Type EEx d components in EEx e enclosures (Nema 4x)
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
Type 'p' equipment shall not be used where a viable alternative exists.
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
Note: this may be the only viable certification method of protection for those
analysers that are not certified but require it due to criticality of service.
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
Intrinsically Safe
ENGG CERT
SS
SS
SS
GH
RH
hazardous area certificate for the selected analyser and shall ensure that
DESCRIPTION
IS calculations shall be for the worst case scenario for each type of IS loop.
Each installed loop shall be compared against these calculations and the
discrepancy shall not exceed the worst case scenario.
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
C
A
________________
Where analyser shelters are designed to handle flammable gases and
DATE ___________ vapors they shall be installed in a Class 1, Division 2 (Zone 2) area. Gas
PROJECT
group, and temperature class of the interior shall be based on the plant
ENGINEER
area and the material/samples handled within the shelter; this classification
________________
shall be subject to COMPANY approval.
DATE ___________
CERTIFIED
Analyser shelters shall not be installed in Zone 1 or 0 hazardous areas.
________________
DATE ___________
Analyser shelters shall be force ventilated with fresh air. The air shall
CONSTRUCTION
preferably be drawn from a non-classified area, or otherwise from a
AGENCY
location approved by the COMPANY. A positive overpressure shall be
________________
maintained to prevent ingress of potentially flammable gases.
DATE ___________
OPERATIONS
Analysers and electrical equipment that are required to remain in operation
________
during abnormal conditions in the analyser shelter, including failure of the
DATE ___________
ventilation or overpressure, shall be certified to meet or exceed the
classification of the interior of the analyser shelter.
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
the small sample flow required by the analysers and the flow of any
flammable carrier gases to the analysers.
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
GH
RH
fitting);
ISSUED FOR PROJECT PROPOSAL
I SSUED FOR CLIENT E -REVIEW
10-01506-0001
10-01506-0001
JO/EWO
15/11/13
13/12/13
19/02/14
This will allow their safe, continued operation under abnormal or failure
REV. NO.
C
A
DATE ___________ Analysers designated as critical that are not available in a certified version
PROJECT shall be installed in a cabinet with a standard purge system wherever
ENGINEER
required to maintain operational availability and safety. Purge systems shall
________________
DATE ___________
be provided in accordance with CENELEC EExp protection or NFPA 496,
and issued with an appropriate certificate or appropriate marked listing to
CERTIFIED
verify the installation.
________________
DATE ___________
Sockets may also be provided as appropriately certified versions but shall
CONSTRUCTION be used in accordance with the recommendations within IEC 61285.
AGENCY
________________
DATE ___________
The following equipment may be provided as safe area or unclassified
versions if the shelter is ventilated with air from a safe area or otherwise
OPERATIONS
monitored location. The installation shall be in accordance with IEC 61285
________ or NFPA 496 articles 5 & 7:
DATE ___________
DATE _____________
BY: ______________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
Recorders;
OF THIS DRAWING IS COVERED, FOR ALL
Printers;
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
suitable for use in either location (switches, junction boxes, cable glands,
DESCRIPTION
etc.)
ISSUED FOR PROJECT PROPOSAL
I SSUED FOR CLIENT E -REVIEW
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
All analysers and instruments in common use on the plant (e.g. gas
C
A
DISCIPLINE
ENGINEER
detectors) shall be identified by unique tag number in accordance with the
________________
project wide standard tagging philosophy.
DATE ___________
Sample system components and instrument types specific to the analyser
PROJECT
ENGINEER shelter shall be uniquely tagged by the Analyser System Vendor, subject to
________________
approval.
DATE ___________
CERTIFIED All instruments shall be identified in the field with the tag number and a
________________ service.
DATE ___________
CONSTRUCTION
Refer to specification PP-965021 C&I P&ID Symbols and Identification for
AGENCY Instrumentation for details on the tag convention for analysers, analyser
________________
streams, and analyser signals (hardwired and serial data signals.) All tag
DATE ___________
numbers shall be issued in accordance with this specification.
OPERATIONS
DATE ___________
The analyser equipment shall comply with IEC 61000-4, parts 1 to 6.
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
All analysers and major components within the analyser systems shall have
the following identifying information on a permanently fastened nameplate:
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
Identification number;
BY DRAWING COMPLETION CERTIFICATE
REVISION CERTIFICATE
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
All cables shall be numbered and tagged at the shelter transits and
equipment entry points.
All piping and tubing shall at entry and exit points both inside and outside
the shelter walls and sample system cabinets have permanently fastened
labels defining product stream and destination.
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
All valve components and indicators, within the shelter systems and sample
systems shall have permanently fastened labels describing their function
eg sample flow to analyser.
15/11/13
13/12/13
19/02/14
DATE
All sample system panels shall have a permanently fixed label on the door
REV. NO.
C
A
giving the associated analyser tag number and a brief service description of
DISCIPLINE
ENGINEER
the analyser.
________________
DATE ___________ All labels and tags shall be in the English language.
PROJECT
ENGINEER All sample take-off and return points from the main process lines shall have
________________
permanently fastened labels to identify their function.
DATE ___________
DATE ___________
3.1 General
CONSTRUCTION
AGENCY It shall be determined during the detailed engineering phase; the
________________
installation method required for individual analysers, the installation
DATE ___________
methods proposed which shall be subject to COMPANY approval.
OPERATIONS
Analyser shelter and local analyser panel locations shall provide good
________
DATE ___________
accessibility and safety for maintenance. Analyser shelters must not be
located underneath process equipment or pipe racks and must be at least
7.5 metres from possible sources of toxic or flammable releases e.g.
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
For the site installation of the analyser shelters, local analyser panels, field
mounted sensors, sample transport lines and sample probes with site
assistance from the Vendor as required. The Vendor shall provide
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
maintenance manual.
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
COMPANY reserves the right to review and approve any decision to use
analyser local panels. Where multiple analysers are located within
geographic proximity of each other, common analyser shelters shall be
used to house these wherever possible, and should not use multiple
analyser local panels.
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
C
A
a given plot area. COMPANY reserves the right to review and approve any
DISCIPLINE
ENGINEER
such decision.
________________
________________
3.5 Field Mounted Analysers
DATE ___________
CONSTRUCTION
Where appropriate, field mounted analyser sensors/transmitters shall be
AGENCY
used.
________________
DATE ___________
The selection and installation of such devices shall ensure that
OPERATIONS maintenance; testing and operation can easily be undertaken. All field
________
mounted devices shall be suitable for the hazardous area and ambient
DATE ___________
conditions in which they are installed.
DATE _____________
BY: ______________
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENGG CERT
SS
SS
GH
RH
10-01506-0001
10-01506-0001
All fittings e.g. locks, hinges, screws, bolts, nuts, washers, supports etc and
15/11/13
13/12/13
19/02/14
DATE
C
A
DISCIPLINE The door shall have a fixed open position,or be lift off type.
ENGINEER
________________
DATE ___________
Adequate lighting (minimum 500 Lux) for full maintenance within the panel
shall be provided local to the cabinet installation under the canopy. This
PROJECT
ENGINEER lighting shall be powered from the 120Vac sub-station supply (permanently
________________ available supply) and not from the instrument UPS supply.
DATE ___________
Where utilities are required at a local panel, the utility installation shall
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
Where gas cylinders are required at Analyser Shelters or a local panel for
validation/calibration gases or as a reference gas/utility, these shall be
mounted at grade, clamped to the panel framework or exterior of the
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
cabinet in bottle racks and located to allow easy removal and replacement.
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
The layout and positioning of any local analyser panel requiring gas
GH
GH
RH
cylinders shall ensure that a minimum distance of 7.5 m from any process
pumps/compressors or any other hazardous process equipment is
maintained.
A stainless steel tag plate giving the analyser tag number and service shall
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
Where a local panel contains a sample with 100 ppm or more H2S, a
I SSUED FOR CLIENT E -REVIEW
prominent warning label advising that high levels of H2S may be present
inside shall be fitted to the door of the panel.
Where a local panel contains a sample with 500 ppm H2S or more, an H2S
detector shall be installed inside the panel (the detector electronics shall be
mounted with other area H2S detector electronics in the PIB). An alarm
beacon indicating H2S has been detected inside shall be installed outside
the cabinet. A prominent warning label advising that high levels of H2S
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
If the panel contains a sample with 500 ppm H2S or more, a vent shall be
installed to a point at least 3.0 metres away from where personnel will ever
15/11/13
13/12/13
19/02/14
DATE
DISCIPLINE
ENGINEER
________________
5.1 Shelter Layout and Design.
DATE ___________
Analyser shelter layout and design shall be developed to suit the
PROJECT
ENGINEER requirements of the types of analysers. Layout and location of analyser
________________ shelters shall be subject to COMPANY approval.
DATE ___________
OPERATIONS Shelters shall be sized to cater for future expansion and need to provide
________
space and utilities for possible future analyzer application based upon
DATE ___________
COMPANY input.
DATE _____________
BY: ______________
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
The following items shall be taken into consideration in the sizing and
ENGG CERT
SS
SS
SS
GH
RH
A trolley complete with built in draw and bottom shelf shall be provided in
the shelter, suitable to accommodate a recorder and printer, where
required.
Power distribution boards, HVAC control panel and analyser house safety
system shall be mounted on the wall inside the analyser shelter.
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
Junction boxes, safety system alarm lamp box, fan starters, and main
power isolation switches shall be mounted on the outside wall of the
analyser shelter.
15/11/13
13/12/13
19/02/14
DATE
shelter.
DISCIPLINE
ENGINEER
________________ Carrier gas and utility gas cylinders shall be supplied with a free standing
DATE ___________ bottle rack with supports and chains. Positioning of gas bottles away from
PROJECT other equipment shall be as per SAES-J-502.
ENGINEER
________________
DATE ___________
5.2 Shelter Construction
CERTIFIED
The following requirements shall be met in the design and construction of
________________
DATE ___________
the analyser shelters:
________________
DATE ___________
A concrete pad will be provided for each analyser shelter. The perimeter of
the concrete pad shall extend sufficiently to allow personnel access to
OPERATIONS
equipment mounted on the outside walls. Refer to SAES-J- 502 for specific
________ guidance on positioning of and access to analyser shelters.
DATE ___________
DATE _____________
BY: ______________
The Vendor shall provide a foot-print drawing giving the recommended size
of the concrete pad for equipment access in relation to the position of the
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
The analyser shelter shall be of the analyser Vendors standard design and
GH
GH
RH
construction.
Painting
All external house parts (cladding) including the walls, roof, doors and the
10-01506-0001
10-01506-0001
10-01506-0001
13/12/13
19/02/14
DATE
within the analyser shelter and not directly from the walls.
C
A
DISCIPLINE
ENGINEER A means shall be provided for mounting equipment as required on the
________________ external shelter walls. This will include sample conditioning system
DATE ___________
cabinets, junction boxes, electrical supply hardware etc.
PROJECT
ENGINEER
________________
Miscellaneous Hardware
DATE ___________
All equipment mounted on the external shelter walls, e.g. junction boxes,
CERTIFIED
________________
cable tray etc plus all fittings e.g. screws, bolts, nuts, washers, supports etc
DATE ___________
and any other components in contact with the atmosphere shall be
stainless steel. Use of any other material shall be subject to COMPANY
CONSTRUCTION
AGENCY
approval.
________________
DATE ___________
Lifting
OPERATIONS
The shelters shall be designed to be lifted as entire structures. Any
________ specialist lifting equipment required, such as spreader beams, shall be
DATE ___________ supplied with the shelter by the Vendor to provide a safe four-point lift by a
single hook.
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
In the event that major external components e.g. HVAC system, sample
EDSD
recovery system etc need to be removable for transport. The shelters and
component enclosures shall be suitable for hoisting and shipment on a flat
bed trailer. The centre of gravity must be clearly marked on each system
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
assembly.
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
meet the full HVAC requirements for the shelter and shall be supplied in
ISSUED FOR PROJECT PROPOSAL
The dual HVAC systems shall be frame mounted package units located at
each end of the shelter on extensions to the shelter sub-frame. HVACs
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
shall be close coupled to the analyser shelter. The controls for the HVAC
unit should be mounted on the internal of the shelter wall.
13/12/13
19/02/14
DATE
DISCIPLINE
ENGINEER
________________
Each shelter shall be forced draft (positive pressure) ventilated with
DATE ___________
independent fresh air fans from each HVAC unit. Ventilation shall be
PROJECT
continuous and provide both fresh air makeup and recirculation of inside
ENGINEER air. Each fan shall be sized to supply twelve (12) fresh air changes per hour
________________
within the shelter and designed to maintain a positive overpressure. The
DATE ___________
Vendor shall supply an inclined tube manometer for indication of the
CERTIFIED overpressure in shelter.
________________
DATE ___________
The number of air changes per hour must be sufficient to dilute the worst
CONSTRUCTION
case hydrocarbon leak to less than 25% LEL in the event of a complete
AGENCY
failure of any single line carrying flammable materials. Similarly, toxic leaks
________________
shall be diluted below the toxic threshold and leaks of asphyxiating gases
DATE ___________
shall be diluted to maintain a minimum 18% volume oxygen concentration
OPERATIONS
in the analyser shelter air. Leak rates shall be controlled by flow limiting or
________
restriction devices located outside the analyser shelter. It is preferred that
DATE ___________
the leak rate is limited to suit the dilution provided by the ten fresh air
changes. However, if the leak rate cannot be limited to suit this
CONTROL NUMBER
DATE _____________
The Vendor shall furnish calculations for the worst case leak rate to
demonstrate adequate dilution.
THIS INDICATES THAT REV. NO. ____________
Only one fresh air fan will be in operation at any one time but each fan will
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
panel will enable either HVAC to be selected as the normal duty HVAC.
Failure of the selected duty fan shall automatically start the other fan and
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
removable dust filters shall be provided for each HVAC to remove dust
SS
SS
SS
GH
RH
Each fan motor and compressor motor shall have its own main power
switch and manual remote/start/stop switch located close to the motor
which will override the automatic facilities when switched out of the remote
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
position. This will be in addition to the main board power isolation switch,
DESCRIPTION
and the individual circuit breakers and motor protection for compressors
ISSUED FOR PROJECT PROPOSAL
and fans, at the 3-phase distribution board. Ventilation fans shall have
I SSUED FOR CLIENT E -REVIEW
10-01506-0001
10-01506-0001
JO/EWO
A single fresh air intake duct shall be provided for the HVAC system. This
will be a point that is at least 7.5 metres from any equipment containing
hydrocarbons or other flammable or toxic vapours.
15/11/13
13/12/13
19/02/14
DATE
All necessary HVAC fresh air ducting and accessories shall be provided by
the Vendor. The ducting shall be vertical, self supporting, and located in
REV. NO.
the centre of the analyser house roof. The ducting inlet shall be a minimum
C
A
DISCIPLINE
ENGINEER
2m above the roof of the shelter and otherwise as required to reach the
________________
safe area. The Vendor shall provide guy wires as required for supporting
DATE ___________ the duct. The duct inlet shall be topped with a weather cap and bird-screen.
PROJECT
ENGINEER Calculations for air velocity and pressure drop down the inlet duct shall be
________________
provided by the Vendor to demonstrate that pressure drop shall not
DATE ___________
adversely affect the fan performance.
CERTIFIED
________________
A sand box shall be provided at the inlet to the HVAC air handling unit. The
DATE ___________
sand box shall be sized so as to reduce the velocity of the air and
CONSTRUCTION
precipitate out any conveyed sand and dust for easy removal.
AGENCY
________________
A low ventilation air flow switch shall be provided for each fan and set to
DATE ___________
alarm at 80 percent of normal flow. This shall be achieved by a Zone 1
OPERATIONS certified thermal switch in the air flow. Failure of the duty HVAC ventilation
________
fan shall automatically start the back-up HVAC, provide a local duty HVAC
DATE ___________
failure alarm, low flow alarm at CCR and be part of the group HVAC fail
input to the common shelter trouble alarm. The flow switch for non-duty
CONTROL NUMBER
fan shall be inhibited until it is automatically started. The back-up fan shall
DATE _____________
BY: ______________
VERIFICATION
in the shelter. In this case both fans shall remain running until manually
reset.
THIS INDICATES THAT REV. NO. ____________
Loss of air flow through both duty and standby HVAC systems shall
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
the shelter without causing spurious alarms or to allow the non-duty fan to
cut in upon failure of the duty fan. A local loss of shelter pressurisation
shall be initiated and an input provided to the shelter in hazardous
condition alarm.
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
Air release from the shelter shall be by weighted barometric louvers located
only at the top and bottom of the shelter walls. The louvers shall be
DESCRIPTION
The HVAC system should provide an even distribution of air throughout the
shelter to prevent uneven cooling or a localised build-up of hazardous
10-01506-0001
10-01506-0001
10-01506-0001
13/12/13
19/02/14
DATE
Air Conditioning
REV. NO.
DISCIPLINE
maintain the temperature within the shelter to 23C 2C with the ambient
ENGINEER
conditions. Calculations to demonstrate that the HVAC system has
________________
sufficient cooling capacity shall be made available by the Vendor. The
DATE ___________
system shall be fully self contained and automatic. The temperature control
PROJECT
ENGINEER
limits may be relaxed if major savings can be demonstrated; this is subject
________________ to COMPANYs approval.
DATE ___________
CERTIFIED
Cooling shall be provided by means of an air cooled mechanical
________________ refrigeration unit. This shall also dehumidify the air to prevent condensation
DATE ___________ within the analyser shelter.
CONSTRUCTION
AGENCY
Cooling shall be controlled using humidity and temperature switches.
________________ Heating shall be considered for the low ambient temperature and also for
DATE ___________ anti-condensation, to run in conjunction with the cooling for humidity
OPERATIONS control.
________
5.4 Utilities
DATE ___________
DATE _____________
BY: ______________
VERIFICATION
The utilities and drain return headers (1 inch minimum size) shall run along
the entire length of the longitudinal shelter walls. The headers should be
run either inside or outside the shelters as most appropriate.
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
Each utility header shall have a primary shut-off valve, accessible from
grade, located upstream of any user connections. The primary shut-off
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
valve shall be outside the shelter. All pressurised headers shall be fitted
ENGG CERT
with a pressure gauge. The incoming headers for instrument air, plant air,
SS
SS
SS
plant nitrogen and fresh (potable) water (as required) shall have filters
GH
GH
RH
upstream of any users. The steam header (if required) shall have a Y-
strainer and blow down valve. Dual filters and dual driers (mounted
downstream of the filters) shall be supplied for the instrument air header to
permit change over without shutting services down. The filters for the
instrument air headers and the filter/regulators for each individual
instrument air user shall have automatic drains.
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
DESCRIPTION
compatible with the fluids contained and shall comply with the requirements
of the piping specification as a minimum.
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
Each header shall be provided with all valves necessary for the current
REV. NO.
C
A
analysers plus at least two extra plugged inlets/outlets in the region of the
DISCIPLINE
ENGINEER
spare space inside and outside the shelter.
________________
DATE ___________ All headers shall slope to a low point and include a knock out pot and drain
PROJECT
valve. All low point drains shall be connected to the atmospheric drain
ENGINEER
header.
________________
DATE ___________
When required at a shelter, provision shall be made for installing gas
CERTIFIED
cylinders at grade, alongside the concrete pad. The cylinders shall be
________________
clamped in bottle racks. The cylinders shall be located to allow easy
DATE ___________
disconnecting and removal. The layout and location of the analyser shelter
CONSTRUCTION shall ensure that any cylinders are a minimum distance of 7.5 m from any
AGENCY
process pumps/compressors or any other hazardous process equipment.
________________
DATE ___________
Connections to all gas cylinders/bottles shall be via flexible stainless steel
OPERATIONS
tubing to facilitate their removal and replacement. The dual pressure
________
reducing stations with pressure gauges and change over facilities for all
DATE ___________ validation gas cylinders at the shelter shall be provided.
CONTROL NUMBER
DATE _____________
All validation vessels containing liquid sample shall have a connection from
BY: ______________
VERIFICATION
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
Low pressure switches shall be installed on the main instrument air header,
GH
GH
RH
plant air header, plant nitrogen header, carrier gas header and detector fuel
gas header, as appropriate, which shall input to the shelter common
trouble alarm.
10-01506-0001
10-01506-0001
shelters.
13/12/13
19/02/14
DATE
DISCIPLINE
ENGINEER
________________
Pockets or void spaces where hazardous gas could accumulate shall be
DATE ___________
minimised.
PROJECT
ENGINEER Sample systems containing highly toxic or flammable components shall
________________ include facilities for purging with an inert gas prior to maintenance of
DATE ___________
sample system components.
CERTIFIED
________________ Sample systems and analysers containing toxic or odorous samples shall
DATE ___________
be installed in enclosures and purged with instrument air. The effluent air
CONSTRUCTION
from these enclosures shall be connected to a separate atmospheric vent
AGENCY system and routed outside the analyser shelter.
________________
DATE ___________
For samples containing Toxic or Carcinogenic materials, such as Benzene,
OPERATIONS then the manual sampling device must be of special design, such as
Dopak, Prise Masson system 1000, system 2000 or equivalent.
________
DATE ___________
5.6 Electrical
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
Earthing
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
system if required. The I.S. earth shall be fully insulated from the electrical
SS
SS
SS
ground system.
GH
GH
RH
Power Distribution
Power distribution panels shall be provided for each shelter. All switches
and distribution boards shall be certified suitable for the hazardous area
classification. The primary isolation switch for each type of power supply
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
This shall be a 3 phase 3-wire, 480 VAC, 60 Hz supply from the sub-
station. It shall be used for the three-phase consumers in the HVAC units
and for any three-phase sample pump motors. The three-phase distribution
board shall be mounted outside the shelter.
10-01506-0001
10-01506-0001
JO/EWO
phase, 4-wire supply from the 480VAC supply for the general purpose
power. The transformer shall be mounted outside the shelter.
13/12/13
19/02/14
DATE
This will be a 120 VAC, 60 Hz power supply derived from single phases of
REV. NO.
DISCIPLINE
ENGINEER
analyser shelter. It will be used to feed shelter single phase users such as
________________
sockets, non-critical analyzers, and the shelter lighting. The distribution
DATE ___________ board shall be mounted inside the shelter and the loads shall be divided
PROJECT
evenly across the phases of the 208 VAC supply.
ENGINEER
________________
UPS Power Supply
DATE ___________
CERTIFIED
This will be a 120VAC, 60 Hz secure supply. It will be used to power the
________________
critical analysers (and the shelter safety and alarm system), as required.
DATE ___________
The distribution board shall be inside the shelter. This supply will be
CONSTRUCTION sourced from the nearest instrument UPS.
AGENCY
________________
Each power user shall have an individual automatic circuit breaker (or
DATE ___________
switch/fuse) at the distribution board. Circuit breakers shall be provided at
OPERATIONS
each distribution board for every analyser. A spare allowance shall be
________
made for circuit breakers, 20% spare or two spare circuit breakers,
DATE ___________ whichever is greater, for future analysers and equipment. Spare breakers
shall be rated 20A and 6A for the future 120 Vac consumers.
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
All motors including ventilation fans, fast loop and sample recovery pumps
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
The shelter duty fan shall automatically restart after a power failure.
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
connecting test equipment. The sockets shall be certified for Class 1, Zone
SS
SS
SS
GH
RH
5.7 Lighting
provided by each door. Light fixtures and switches inside the shelter shall
DESCRIPTION
be certified for Class 1, Zone 2, Groups IIC, IIB and IIA as necessary
ISSUED FOR PROJECT PROPOSAL
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
All cabling inside each shelter shall be run in cable trays. The main cable
trays running around the shelter ceiling shall be mounted horizontally.
REV. NO.
Separate cable trays shall be provided for signal and power cabling.
C
A
DISCIPLINE
ENGINEER
________________
Cable transits through the analyser shelter walls shall be provided
DATE ___________
separately for power and signal cables.
PROJECT
ENGINEER For power cables, gas tight cable transits shall be provided below or
________________
above the power distribution panels. These transits shall be single or
DATE ___________
double frame with a minimum of 10% spare entries fitted with rubber
CERTIFIED blocks;
________________
DATE ___________
For signal cables, gas tight cable transits with a minimum of 10%
CONSTRUCTION
spare entries shall be provided. Single or double frame transits may
AGENCY
be used.
________________
DATE ___________
Single layer terminal blocks/connectors must be used for all wiring
OPERATIONS
connections.
________
DATE ___________
5.9 Signal Junction Boxes
DATE _____________
BY: ______________
VERIFICATION
wall. All terminals and wires shall be identified. To ensure proper levels of
EDSD
THIS INDICATES THAT REV. NO. ____________
Analogue signal circuits (4-20 mA). All analyser signals for process
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
Fire and Gas contact outputs, digital status, and alarm signals.
The analyser shelter fire and gas system shall be provided in accordance
ISSUED FOR PROJECT PROPOSAL
with Fire Detection System (FDS) PP-965015 and Gas Detection System
I SSUED FOR CLIENT E -REVIEW
A least one flammable vapour (LEL) detectors shall be installed for every
14 m or part thereof of shelter floor. The number of detectors may need to
be increased; this and the position of the detectors shall depend on the
nature and property (such as density relative to air) of the fluids (gases,
liquids, vapours) contained within the shelter. The alarm settings shall be
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
The shelter LEL and toxic gas detectors shall be wired direct to the Fire
15/11/13
13/12/13
19/02/14
DATE
and Gas Detection Systems. The Fire and Gas Detection Systems will then
provide an alarm in the control room and a local alarm back to the analyser
REV. NO.
C
A
________________ H2S monitors shall be installed in shelters handling samples containing H2S
DATE ___________ or located close to a unit where H2S is present. A minimum of two detectors
PROJECT
shall be provided (if more than two analysers in the shelter handle samples
ENGINEER
containing more than 100 ppm H2S, additional detectors shall be provided
________________
as specified to ensure complete personnel safety) located in the vicinity
DATE ___________
and below the analysers containing the H2S. The alarm setting shall be 10
CERTIFIED
ppm. The alarms and actions detailed in Section 5.11 will be initiated at this
________________
level of detection.
DATE ___________
CONSTRUCTION If other toxic gases are present in samples in hazardous levels then
AGENCY
appropriate point detectors or environmental hazard monitoring shall be
________________
DATE ___________
installed in the shelter with alarms and actions as detailed for H2S
detection.
OPERATIONS
________ Calibration kits and calibration gases for one years operation, or as per a
DATE ___________ duration otherwise agreed with COMPANY, for the LEL detectors and gas
detectors shall be supplied with each shelter. Maintenance tools and
CONTROL NUMBER
DATE _____________
Where required, a low Oxygen (O2) detector and rotating beam shall also
be provided in the shelter, loop powered from the gas detection system in
the PIB.
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
For plant wide consistency, the model number and type of gas detectors
shall be selected and provided by the Vendor in accordance with Fire and
Gas Detection System specifications PP-965015 and PP-965013.
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
A manual call point shall be provided outside each door. A minimum of two
ENGG CERT
smoke detectors shall be installed inside the analyser shelter. Both detector
SS
SS
SS
types shall be wired to a junction box outside the analyser shelter for
GH
GH
RH
A fire alarm condition shall halt ventilation from both HVAC units and roof
mounted back-up fan.
The Vendor shall supply an analyser shelter safety system; this shall be a
PLC based controller. The safety system and associated instrumentation
shall be a Zone 1 certified installation designed for continuous operation.
The PLC model shall be standardised across all analyser shelters in the
interests of maintainability and spare parts holding. Final selection of the
PLC model shall be subject to COMPANY approval. Refer also to SAES-J-
002.
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
The CPU and chassis type shall be standardised across the project for all
analyser shelter safety system PLCs. Expansion chassis for additional I/O
shall be used as required. The signal density on I/O cards shall also be
15/11/13
13/12/13
19/02/14
DATE
standardised: there shall be 16 inputs for each DI card and 16 outputs for
each DO card (If the 16 output version is not available for the approved
REV. NO.
PLC model, then 8 output DO cards are also acceptable.) The PLC I/O
C
A
DISCIPLINE
ENGINEER
shall be wired to an external terminal box for ease of termination.
________________
DATE ___________
The Safety System PLC design shall comply with the following
PROJECT
requirements:
ENGINEER
________________
The Safety System PLC and associated I/O shall be powered from
DATE ___________
the 120VAC UPS distribution board in the analyser house and the
CERTIFIED Vendor shall include all necessary 24V DC PSU, and interposing
________________
relays;
DATE ___________
CONSTRUCTION
The Safety System PLC shall be self contained and it is not
AGENCY
anticipated that remote PLC I/O modules shall be used. Serial
________________
interfaces from the PLC to other systems, such as the DCS, are not
DATE ___________
required. PLC interfaces with other systems shall be via discrete I/O.
OPERATIONS
The PLC communications interface will only be used for local
________
maintenance;
DATE ___________
DATE _____________
provided by the Vendor for each operating area, complete with all the
BY: ______________
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
REVISION CERTIFICATE
The Vendor shall supply a laptop PC for maintenance with the PLC
programming software pre-installed. The laptop PC may be a shared
resource with other Vendor supplied maintenance software (e.g. for
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
GH
GH
RH
each card type. The specific requirement for fully spare wired
ISSUED FOR PROJECT PROPOSAL
modules for each type used and the minimum 15% spare expansion
I SSUED FOR CLIENT E -REVIEW
- 10% spare means that none of the PLC cards should initially be
supplied with more than 90% of the I/O in use;
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
- In the instance that spare card slots are available, these should
be covered with the manufacturers standard dust cover and a
spare cable entry (with blanking plug) provided for EExd PLC
enclosures;
15/11/13
13/12/13
19/02/14
DATE
C
A
________________
The analyser shelter PLC safety system shall interface with devices and
DATE ___________
other systems as follows:
CERTIFIED
________________
The fire detection alarm panel in the PIB and gas detection system
DATE ___________
(DCS) shall provide separate alarms for LEL, fire, and toxic point
CONSTRUCTION detection to the PLC safety system (as required);
AGENCY
________________
DATE ___________
The PLC safety system shall provide Shelter in Hazardous
Condition and Common Shelter Trouble Alarms to the DCS;
OPERATIONS
________ The safety system shall operate the analyser shelter Beacons and the
DATE ___________ Horn;
CONTROL NUMBER
DATE _____________
BY: ______________
The safety system shall handle the I/O to the analyser shelter
VERIFICATION
annunciator;
EDSD
The HVAC control devices, switchover, and alarming for cooling and
fresh air shall all be handled by the safety system;
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
shelter:
SS
SS
SS
GH
RH
This will alarm in the DCS. It will be initiated by the following conditions, as
applicable:
DESCRIPTION
Toxic gas or low oxygen detection inside the shelter (V/F contact from
DCS) ;
H2S (or other toxic gas detection) in local analyser cabinets and/or
sample conditioning system cabinets associated with the shelter (V/F
contact from DCS) ;
Loss of ventilation flow from both the duty and the non-duty HVAC
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
units;
13/12/13
19/02/14
DATE
C
A
DATE ___________
Air purge system failure (for purged enclosures) ;
CERTIFIED
________________
DATE ___________
Sample recovery system high-high or low-low level;
________________
DATE ___________
Low instrument air header pressure;
OPERATIONS
Low plant nitrogen header pressure;
________
DATE _____________
BY: ______________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
above. An alarm window shall also be provided for the Common Shelter
SS
SS
SS
Trouble Alarm, and individual indication of the initiators of this alarm is not
GH
GH
RH
required; this grouping is on the basis that local indicators are already
provided to allow fault diagnosis (pressure indicators, etc.). The exception
is loss of the duty HVAC, which shall be annunciated separately. An
annunciator test button and safety system healthy indicator should also be
considered. The alarms shall flash until acknowledged going to a steady
state and shall automatically reset when alarm conditions clear.
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
DESCRIPTION
with ISA S18.1 type A. A horn and beacons shall be provided outside the
I SSUED FOR CLIENT E -REVIEW
Beacons shall be located outside, above the main door of the shelter to
alarm when the shelter is in hazardous condition. Beacons shall also be
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
provided at a clearly visible location inside the shelter. The horn shall be
audible from inside as well as outside the shelter with the door closed, and
provide a minimum of sound level of 103 dB(A) at 1m. Gas and fire
alarming shall be provided in accordance with Fire and Gas Detection
15/11/13
13/12/13
19/02/14
DATE
C
A
provided for fire, a red beacon for LEL detection, and a blue beacon shall
DISCIPLINE
ENGINEER
be provided on H2S detection, low oxygen detection, or detection of any
________________ other toxic hazard.
DATE ___________
PROJECT
Fault and Alarm Contact Philosophy.
ENGINEER
________________
All diagnostic fault alarm contacts (Common shelter trouble, shelter in
DATE ___________
hazard condition, Fire system fault, etc.) shall be open circuit to alarm, fail-
CERTIFIED
safe, alarm as the de-energised state. The alarm contacts for each alarm to
________________
the control room must be completely independent and isolated from other
DATE ___________
alarm contacts.
CONSTRUCTION
AGENCY
All alarms giving a positive indication of hazard (Fire Alarm, Toxic gas
________________
detected, Flammable gas detected, Low oxygen detected) shall be contact
DATE ___________
closure to alarm, non fail-safe, alarm as the energised state; this is
OPERATIONS
necessary to avoid false alarms during fault conditions. Fault conditions are
________
alarmed separately as above.
DATE ___________
Shelter Safety System Actions Related to Fire and Gas Detection Systems
CONTROL NUMBER
DATE _____________
Inputs.
BY: ______________
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
BY DRAWING COMPLETION CERTIFICATE
REVISION CERTIFICATE
Shelter back-up fan shall automatically start and keep running until
manually reset;
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
20% LEL Flammable Vapour Detection at HVAC fresh air inlet (where
GH
GH
RH
provided):
Stop HVAC unit fresh air fans (The same action is required for toxic
detection at the fresh air inlet, if installed.) ;
Shelter back-up fan shall automatically start and keep running until
manually reset;
10-01506-0001
10-01506-0001
JO/EWO
Start the red and blue beacons and the horn (local action at the
shelter only).
15/11/13
13/12/13
19/02/14
Common Fire Alarm Signal (or toxic gas at HVAC inlet, all as required.)
DATE
C
A
DISCIPLINE
ENGINEER Start the appropriate beacons and the horn;
________________
DATE ___________ Signals Repeated to the Safety System from the Gas Detection System.
PROJECT
ENGINEER
The following signals shall be repeated back to the analyser shelter from
________________
the Gas Detection System (DCS) as volt-free alarm contacts for action by
DATE ___________
the shelter safety system:
CERTIFIED
________________
Toxic gas or low oxygen detection inside the shelter;
DATE ___________
________________
DATE ___________
20% LEL Flammable Vapour Detection in Shelter;
OPERATIONS
20% LEL Flammable Vapour Detection at HVAC fresh air inlet (where
________ required);
DATE ___________
Fault alarm from the Gas Detection System for the alarm zone that
CONTROL NUMBER
DATE _____________
BY: ______________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
next to the analyser. The indicator shall display the analyser calibrated
ENGG CERT
SS
SS
GH
RH
Enclosures for air purge systems that are not part of an already certified
analyser system shall have a handle for unlatching the fasteners.
Fasteners which require socket keys or screw drivers to open shall not be
used.
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
DESCRIPTION
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
equipment installed:
C
A
DISCIPLINE
ENGINEER
________________
19 Rack mounted FO Patch Panel (To suit incoming FO cable,
DATE ___________
including spare cores);
PROJECT
ENGINEER LAN connections for GC Network Hub and Fibre Optic Converters.
________________
DATE ___________
The cabinet shall be of a standard manufacturers design, Rittal or
CERTIFIED equivalent (Refer to SAES-J-002.) Design shall generally be in accordance
________________
with specification 34-SAMS-820 Instrument Control Cabinets Indoor.
DATE ___________
The following additional design considerations apply:
CONSTRUCTION
AGENCY
The cabinet shall be mounted against the analyser shelter wall and
________________
should be designed for front access. The cabinet shall be adjacent to
DATE ___________
the workbench;
OPERATIONS
________
The cable access shall be at the top of the cabinet;
DATE ___________
DATE _____________
Fibre optic converters shall be suitable for single-mode fibre. The plant-
THIS INDICATES THAT REV. NO. ____________
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
6. ANALYSERS
ENGG CERT
SS
SS
SS
GH
RH
Analyser Selection
COMPANY approval.
I SSUED FOR CLIENT E -REVIEW
Hand held calibration devices shall be provided for field installed analysers.
10-01506-0001
10-01506-0001
10-01506-0001
13/12/13
19/02/14
DATE
Database.
REV. NO.
The datasheet shall include all necessary process and piping design
C
A
DISCIPLINE information for the sample conditioning system. Refer to PP-965007 for
ENGINEER
________________
further details. The analysis should be clearly identified as either extractive
DATE ___________
or In-situ.
PROJECT
ENGINEER The following information is required on the datasheet as a minimum for the
________________ initial analyser design and selection:
DATE ___________
CERTIFIED Process composition and phase at the analyser for each sample
________________ stream (after sample conditioning, if different.);
DATE ___________
CONSTRUCTION
Range and engineering units for measured components (In
AGENCY accordance with the BEDD document PP-962000 and refer also to
________________
SAES-J-003.);
DATE ___________
DATE _____________
BY: ______________
VERIFICATION
applicable;
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
the analyser data from the Vendor into the database and datasheet,
including manufacturer and model number.
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
sheets; these narrative shall define any detailed control requirements in the
SS
SS
SS
field, local to the analyser, or within the DCS, e.g. control of sample stream
GH
GH
RH
switching.
Signal levels
wired to various sub-systems of the PCS including the ESD and the DCS.
DESCRIPTION
Analyser outputs to the ESD System shall be isolated, fully floating 4-20mA
I SSUED FOR CLIENT E -REVIEW
signals; these may be powered from the ESD or from the analyser, subject
to the analyser type. Volt-free fault alarms contacts shall be wired to the
ESD wherever available from the analyser. All analyser signals shall be
repeated to the DCS.
Generally, analyser outputs wired directly to the DCS shall be isolated, fully
floating 4-20mA signals; these may be powered from the DCS or from the
analyser, subject to the analyser type. Volt-free fault alarm contacts shall
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
DISCIPLINE
ENGINEER
There is no specific requirement to repeat critical analyser I/O on the data
________________
link since this shall already be hardwired.
DATE ___________
PROJECT
Foundation Fieldbus is preferred for transmitter type analysers such as pH,
ENGINEER
conductivity, and dissolved oxygen measurements. Where these analyser
________________
types are used on ESD applications, the signal should be 4-20mA, HART
DATE ___________
Protocol, powered from the ESD.
CERTIFIED
________________
Analyser Signal Types and Tagging Philosophy
DATE ___________
CONSTRUCTION
As stated in section 2.6, analysers, analysis streams, analyser fault alarms,
AGENCY
analyser shelter alarms and any other analyser related I/O shall be
________________
uniquely tagged in accordance with specification PP-965021. Fire
DATE ___________
Detection System and Gas Detection System related I/O inside the
OPERATIONS
analyser house shall follow the respective tag conventions given in the
________
same specification.
DATE ___________
Shelter in Hazardous Condition Alarm
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
The tag number shall relate to the analyser shelter identifier and the plant
EDSD
e.g. R250-NSA-0001A
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
The tag number shall relate to the analyser shelter identifier and the plant
area, and be a general, otherwise unclassified alarm NSA, suffix B:
GH
GH
RH
e.g. R250-NSA-0001B
Where one analyser handles multiple process streams, a tag number shall
be allocated for each stream. The stream number shall be unique from all
other stream tags and analyser main tags:
10-01506-0001
10-01506-0001
JO/EWO
The measured value for analysers that are only measuring a single process
value for a single process stream shall adopt the analyser main tag but
designated AI:
15/11/13
13/12/13
19/02/14
DATE
C
A
________________
The measured values for analysers that are measuring multiple process
DATE ___________
values but for a single process stream shall adopt the analyser main tag
PROJECT
ENGINEER and shall be designated AI and with an alpha suffix:
________________
________________ The measured values for analysers that are only measuring a single
DATE ___________ process value but for multiple process streams shall adopt the analyser
OPERATIONS stream tag and shall be designated AI:
________
e.g. <Unit No.>-AI-<1st Unique Stream No.>
DATE ___________
<Unit No.>-AI-<2nd Unique Stream No.>
<Unit No.>-AI-<3rd Unique Stream No.>
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
The measured values for analysers that are only measuring a single
process value but for multiple process streams shall adopt the analyser
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
Certain analysers may only provide a single measured value output but the
DESCRIPTION
DCS logic. In such instances the analogue input to the DCS shall bear the
I SSUED FOR CLIENT E -REVIEW
tag as per the example given for Single stream analysers with a single
measured value.
The DCS logic shall de-multiplex the signal into the separate process
values based on the current selected stream. The internal DCS signals
separated this way shall be tagged as per Multiple stream analysers with a
single measured value per stream.
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
DCS stream tags shall be allocated for these streams as indicated above.
Where local PLC stream selection is provided, the same principle as DCS
stream selection shall apply, except that the PLC shall also provide a
15/11/13
13/12/13
19/02/14
DATE
hardwired signal to the DCS to indicate the current stream being analysed;
in both cases the internal DCS signal tag to identify the current stream shall
REV. NO.
be the root stream tag with a suffix indicating the stream number.
C
A
DISCIPLINE
ENGINEER
________________
e.g. <Unit No.>-AT-<1st Unique Stream No.> S01
DATE ___________ <Unit No.>-AT-<2nd Unique Stream No.> S02, etc.
PROJECT
ENGINEER Note: This concept also applies where the analyser process stream is
________________
selected manually at the analyser sample system panel. A button on the
DATE ___________
HMI should be provided to allow identification of the manually selected
CERTIFIED stream inside the DCS. The tagging concept for the internal DCS stream
________________
tagging is the same.
DATE ___________
CONSTRUCTION
Analyser fault alarms
AGENCY
________________
Generally, only one common fault alarm is required per analyser tag. The
DATE ___________
fault alarm shall adopt the main analyser tag except it shall be designated
OPERATIONS AA:
________
DATE ___________
e.g. <Unit No.>-AA-<Unique No.>
DATE _____________
BY: ______________
VERIFICATION
provided for each stream. Where this level of alarming is required, the
EDSD
steam fault alarms shall adopt the analyser stream tag except these shall
be designated AA:
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
Stream based fault alarms are typically only required for multiple channel
ENGG CERT
SS
SS
analysers.
GH
GH
RH
Other hardwired and serial data analyser signals shall be used but the type
and purpose are subject to the analyser measuring principle and model;
these are dealt with specifically in the respective analyser sections of this
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
specification.
DESCRIPTION
COMPANY reserves the right to inspect all analysers at the OEM works
and the CONTRACTOR and Vendor should make provision for this testing,
including attendance
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
DISCIPLINE
ENGINEER
the Vendor.
________________
DATE ___________
6.2 Requirements For GC Analysers
PROJECT
ENGINEER GC Analyser Selection
________________
DATE ___________
GC analysers are integrated on a common data and maintenance
CONSTRUCTION
network. For the purposes of maintainability and network
AGENCY implementation, no more than two different GC analyser
________________
manufacturers should be used on the complex. The CONTRACTOR
DATE ___________
should seek approval of the bid list from COMPANY in order to
OPERATIONS ensure that this concept is maintained;
________
DATE ___________
The CONTRACTOR shall state the required GC cycle time and
repeatability of measured components at bid stage. The Vendor shall
offer an analyser in compliance with these performance criteria;
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
logic;
ISSUED FOR PROJECT PROPOSAL
I SSUED FOR CLIENT E -REVIEW
10-01506-0001
10-01506-0001
JO/EWO
In addition to the guidance given in section 6.1, this section defines specific
requirements for interfacing GC analysers with the DCS.
15/11/13
13/12/13
19/02/14
C
A
________________ Further details of the GC data network and its interfaces with the DCS and
DATE ___________ other systems are given in this section.
PROJECT
ENGINEER
Critical I/O from Critical GC analysers shall be hardwired directly to the
________________
DCS or the ESD as appropriate. Critical I/O means the critical measured
DATE ___________
values and the fault alarm.
CERTIFIED
________________
The following types GC analyser I/O shall be transferred between the GC
DATE ___________
Controller and the DCS:
CONSTRUCTION
AGENCY
Non-critical measured values (process indication and alarm only);
________________
DATE ___________
Fault and communication alarm signals for Non-critical GC analysers;
OPERATIONS
________ Stream ID of the last sample stream updated (for multi-stream GCs);
DATE ___________
DATE _____________
BY: ______________
VERIFICATION
facility).
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
Network:
OF THIS DRAWING IS COVERED, FOR ALL
Validation values;
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
This section refers to the signal types transferred via the data network and
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
the tagging requirements for these. A fully defined signal map shall be
DESCRIPTION
appropriate.
I SSUED FOR CLIENT E -REVIEW
The map shall state all required information including the analyser tag,
OPC tag or Modbus address (as applicable), the signal type description,
the meaning of the value of status bits and integers, the ranges and
component names related to registers, and any scale factors used.
The CONTRACTOR shall ensure that the Vendor completes all the
required mapping information including the tagging in accordance with the
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
tag philosophy.
13/12/13
19/02/14
DATE
The analyser measured values and fault alarms transferred via the data
C
A
DISCIPLINE
ENGINEER
network shall be tagged as per the equivalent hardwired signals (the
________________
relevant examples in section 6.1 refer.)
DATE ___________
Stream ID of the last sample stream updated
PROJECT
ENGINEER
________________ The Stream ID signal is used to indicate the last set of results updated by
DATE ___________
the GC analyser and is triggered when the analysis for the subject stream
CERTIFIED has completed and the measured values for that stream are updated. The
________________ signal may either be a pulse signal (a status bit typically set to 1 for 10
DATE ___________
seconds) or a constant signal, reset to 0 when another stream for the
CONSTRUCTION
same analyser has been updated.
AGENCY
________________
The pulse signals for stream ID shall adopt the root stream tags and shall
DATE ___________
be suffixed (P01 to P0n) for stream numbers 1 to n.
OPERATIONS
DATE ___________
<Unit No.> AT-<2nd Unique Stream No.> P02, etc.
These signals shall generate a DCS tag for stream ID as per the tag
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
convention given for Stream ID in the DCS and PLC stream selection part
EDSD
of section 0. This DCS generated tag shall latch to 1 when the pulse
signal is received and reset when a pulse is received for the next stream.
The DCS tag is as follows:
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
e.g.
REVISION CERTIFICATE
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
When the stream ID latching is done within the GC analyser, the tag shall
ENGG CERT
SS
SS
GH
RH
the DCS logic. The activation and deactivation signals shall be identified
ISSUED FOR PROJECT PROPOSAL
using the root stream tag and D01 to n for deactivate and A01 for
I SSUED FOR CLIENT E -REVIEW
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
The validation signal from the DCS to the GC Gateway shall adopt the
REV. NO.
DISCIPLINE
ENGINEER
________________
e.g. <Unit No.> AT-<Unique No.> GV
DATE ___________
Some GC analysers may have multiple analysis methods which require
PROJECT
ENGINEER separate validation methods for different measuring streams. Wherever
________________ possible, the analyser shall run each validation method sequentially and
DATE ___________
automatically on receipt of the validation signal.
CERTIFIED
DATE ___________
e.g. <Unit No.> AT-<1st Unique Stream No.> GV
OPERATIONS <Unit No.> AT-<2nd Unique Stream No.> GV
________ The following examples relate to the GC interface:
DATE ___________
Validation values
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
The tag number of the validation value shall adopt the root tag of the
ENGG CERT
SS
SS
GH
RH
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
DISCIPLINE
ENGINEER
________________
All inlet and outlet connections to the analyser shall be clearly
DATE ___________
identified as to service and function;
PROJECT
ENGINEER Tube fittings shall be standardised with regards to manufacturer and
________________
tube diameters (Refer to PP-965018);
DATE ___________
DATE ___________
Analytical columns shall comply with the following requirements:
OPERATIONS
________
Columns used for measured component separation shall be neatly
DATE ___________
coiled, supported, and accessible for maintenance without special
tools;
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
The electrical, instrument, and local control design for GC Analysers shall
include the following:
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
GH
RH
valves in the sample system. The solenoid valves shall generally not
be direct acting or separate from the analyser unless the sample is
inert or not from process applications, such as for air monitoring
systems;
the requirement;
ISSUED FOR PROJECT PROPOSAL
I SSUED FOR CLIENT E -REVIEW
10-01506-0001
10-01506-0001
13/12/13
19/02/14
DATE
header pressure alarms. The header low pressure alarms are pre-alarms
C
A
DISCIPLINE
ENGINEER
with a higher set-point than the individual GC analyser alarms.
________________
The GC analyser fault alarm group shall include the following
DATE ___________
software related alarms:
PROJECT
ENGINEER
Missing peak alarm (generally for key measured components);
________________
DATE ___________ Late elution time (generally for key measured components);
CERTIFIED Communications failure alarm;
________________
GC analyser off-line (not running an analysis or validation).
DATE ___________
CONSTRUCTION
6.3 Oxygen Analysers
AGENCY
DATE ___________
The CONTRACTOR shall specify the required measuring principle on
the analyser data sheet: Paramagnetic, Zirconium Oxide,
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
The CONTRACTOR shall state the maximum allowable span drift and
zero drift per month and the required linearity for the measured range
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
at the bid stage. For critical analysers, the overall required accuracy
REVISION CERTIFICATE
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
GH
GH
RH
In addition to the guidance given in section 6.1, this section defines specific
requirements for interfacing oxygen analysers with the PCS.
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
Oxygen analysers may be connected to the DCS via the GC data network
subject to the requirements of section 6.2.
REV. NO.
C
A
DISCIPLINE
ENGINEER
Dissolved oxygen analysers shall be either wired as Foundation Fieldbus
________________
compliant, or loop powered 4-20mA, HART protocol as appropriate.
DATE ___________
Oxygen Analyser Signal Types and Tagging Philosophy
PROJECT
ENGINEER
________________ Oxygen analyser signals may be hardwired to the DCS or connected via a
DATE ___________
GC data network. Both hardwired signals and signals sent via the GC data
CERTIFIED network shall be tagged in accordance with section 6.1. The signals to
________________ which this statement applies are generally the measured value and the fault
DATE ___________
alarm
CONSTRUCTION
AGENCY Where oxygen analysers require automatic validation, the validation valve
________________
shall be controlled via the DCS. The output to the oxygen analyser sample
DATE ___________
system shall adopt the analyser main tag with the suffix GV
OPERATIONS
DATE ___________
6.4 Infra-red and UV analysers
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
Analyser Selection
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
Situ or extractive;
SS
SS
SS
GH
GH
RH
The CONTRACTOR shall state the maximum allowable span drift and
zero drift per month and the required linearity for the measured range
at the bid stage. For critical analysers, the overall required accuracy
shall be considered, including tolerance of calibration mixtures.
Atmospheric pressure compensation shall be provided for gas phase
analysers as necessary to meet the required accuracy. The Vendor
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
In addition to the guidance given in section 6.1, this section defines specific
requirements for interfacing infra-red and UV analysers with the PCS.
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
Infra-red and UV analysers may be connected to the DCS via the data
REV. NO.
DISCIPLINE
ENGINEER
________________
For certain types of hydrocarbon analysis, infrared gas detectors may be
DATE ___________ suitable. These are generally loop-powered 4-20mA, HART protocol. Fault
PROJECT
diagnosis shall be carried out as per other gas detectors and shall be used
ENGINEER
to generate a fault alarm signal. Please note that where such detectors are
________________
used as analysers, the detector shall be treated as an analyser in terms of
DATE ___________
design and maintenance.
CERTIFIED
________________
Infra-red and UV Analyser Signal Types and Tagging Philosophy
DATE ___________
CONSTRUCTION
Infra-red and UV analyser signals may be hardwired to the DCS or
AGENCY
connected via a data network. Both hardwired signals and signals sent via
________________
the data network shall be tagged in accordance with section 6.1. The
DATE ___________
signals to which this statement applies are generally the measured value
OPERATIONS
and the fault alarm. Where Infra-red and UV analysers require automatic
________
validation, the validation valve shall be controlled via the DCS. The output
DATE ___________
to the Infra-red and UV analyser sample system shall adopt the analyser
main tag with the suffix GV
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
Analyser Selection
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
GH
GH
RH
The CONTRACTOR shall state the maximum allowable span drift and
zero drift per month and the required linearity for the measured range
at the bid stage. For critical analysers, the overall required accuracy
shall be considered, including tolerance of calibration devices. The
Vendor shall offer an analyser in compliance with these performance
criteria;
ISSUED FOR INTERNAL/CLIENT PMT REVIEW
DESCRIPTION
In addition to the guidance given in section 6.1, this section defines specific
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
volt-free fault contact, and the measured value is typically powered from
the analyser.
REV. NO.
C
A
DISCIPLINE
ENGINEER
Fault alarm signals should be stream based where available for multi-
________________ stream moisture transmitters.
DATE ___________
PROJECT
Moisture Analyser Signal Types and Tagging Philosophy
ENGINEER
________________
Moisture analyser signals shall be hardwired to the PCS. Hardwired signals
DATE ___________
shall be tagged in accordance with section 6.1. The signals to which this
CERTIFIED statement applies are generally the measured value(s) and the fault
________________
alarm(s).
DATE ___________
CONSTRUCTION
Moisture Analyser Hardware Requirements
AGENCY
________________
It is desirable to be able to isolate and maintain individual elements
DATE ___________
(sensors, sample systems, and output cards) of multi-stream moisture
OPERATIONS
analysers without interfering with operation of the other analysis streams.
________
This feature should be provided wherever available.
DATE ___________
The moisture analyser transmitter shall be located in the PIB, or preferably
in a nearby analyser shelter if there is already a requirement for a shelter
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
for other analyser types. Field wiring between the sensor and the
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
Analyser Selection
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
GH
GH
RH
The CONTRACTOR shall state the maximum allowable span drift and
DESCRIPTION
zero drift per month and the required linearity for the measured range
ISSUED FOR PROJECT PROPOSAL
10-01506-0001
10-01506-0001
JO/EWO
In addition to the guidance given in section 6.1, this section defines specific
requirements for interfacing density analysers with the PCS.
15/11/13
13/12/13
19/02/14
DATE
C
A
PROJECT
Density Analyser Signal Types and Tagging Philosophy
ENGINEER
________________
Density analyser signals shall be hardwired to the PCS. Hardwired signals
DATE ___________
shall be tagged in accordance with section 6.1. The signals to which this
CERTIFIED statement applies are generally the measured value and the fault alarm.
________________
DATE ___________
Density Analyser Hardware Requirements
CONSTRUCTION
AGENCY Certain models of density analyser are provided with a separate transmitter
________________
and sensor. In such cases, the transmitter shall be located in the nearest
DATE ___________
analyser shelter (preferred) or PIB. Field wiring between the sensor and the
OPERATIONS
transmitter shall preferably be non-intrinsically safe. The sensor shall be
________
certified for Zone 1.
DATE ___________
6.7 Conductivity and pH analysers
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
Analyser Selection
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
The CONTRACTOR shall state the maximum allowable span drift and
ENGG CERT
zero drift per month and the required linearity for the measured range
SS
SS
SS
GH
RH
In addition to the guidance given in section 6.1, this section defines specific
requirements for interfacing pH and conductivity analysers with the PCS.
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
C
A
DISCIPLINE
ENGINEER
Signal Types and Tagging Philosophy for pH and Conductivity Analysers
________________
DATE ___________ The pH and conductivity analyser signals shall be wired to the PCS as
PROJECT
described above. The signals shall be tagged in accordance with section
ENGINEER
________________
6.1. The signal to which this statement applies is the measured value (and
DATE ___________
the fault alarm, if any.)
CERTIFIED
________________
Hardware Requirements for pH and Conductivity Analysers
DATE ___________
CONSTRUCTION
Field wiring from the transmitter to the PCS shall preferably be
AGENCY non-intrinsically safe. The transmitter and sensor assembly shall be
________________
certified for Zone 1.
DATE ___________
DATE ___________
Analyser Selection
DATE _____________
BY: ______________
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
The CONTRACTOR shall state the maximum allowable span drift and
ENGG CERT
zero drift per month and the required linearity for the measured range
SS
SS
SS
GH
RH
The physical property analyser data sheets shall be as per section 6.1.
In addition to the guidance given in section 6.1, this section defines specific
ISSUED FOR PROJECT PROPOSAL
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
C
A
DISCIPLINE
ENGINEER
Physical property analysers shall be certified for Zone 1 and installed in an
________________
analyser shelter or local air conditioned and weatherproof cabinet.
DATE ___________
PROJECT
Physical property analysers shall generally be manually validated.
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
________
DATE ___________
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
ACRONYMS
GH
GH
RH
10-01506-0001
10-01506-0001
FO Fibre Optic
JO/EWO
GC Gas Chromatograph
15/11/13
13/12/13
19/02/14
I/O Input/Output
REV. NO.
C
A
________________
LAN Local Area Network
DATE ___________
PROJECT
ENGINEER LEL Lower Explosive Limit
________________
________________
MTTR Mean Time To Repair
DATE ___________
OEM Original Equipment Manufacturer
CONSTRUCTION
AGENCY
PCS Process Control System
________________
DATE ___________
PIB Process Interface Building
OPERATIONS
DATE ___________
PLC Programmable Logic Controller
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
TC Total Carbon
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
TERMS
Process Control System The entire plant control system for KhCPF
Development Project including all DCS
Groups, auxiliary equipment systems,
interfaces to external equipment, and
networks.
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
benchmarking.
REV. NO.
DISCIPLINE
building for housing analysers. This may be
ENGINEER referred to in other standards in the same
________________ context as Analyser House.
DATE ___________
DATE _____________
loop.
BY: ______________
VERIFICATION
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
GH
RH
sample.
ISSUED FOR PROJECT PROPOSAL
I SSUED FOR CLIENT E -REVIEW
10-01506-0001
10-01506-0001
10-01506-0001
JO/EWO
15/11/13
13/12/13
19/02/14
DATE
REV. NO.
C
A
DISCIPLINE
ENGINEER
________________
DATE ___________
PROJECT
ENGINEER
________________
DATE ___________
CERTIFIED
________________
DATE ___________
CONSTRUCTION
AGENCY
________________
DATE ___________
OPERATIONS
________
DATE ___________
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
ENGG CERT
SS
SS
GH
RH
comply with the latest edition of the references listed below at time of issue
of this specification and are considered part of this specification.
Number Description
DESCRIPTION
10-01506-0001
10-01506-0001
JO/EWO
13/12/13
19/02/14
DATE
DISCIPLINE
ENGINEER 34-SAMSS-517 Density Meters
________________
34-SAMSS-820 Instrument Control Cabinets Indoor
DATE ___________
________________
Number Description
DATE ___________
SAES-B-014 Safety Requirements for Plant and Operational
CERTIFIED
Support Buildings
________________
DATE _____________
BY: ______________
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SS
SS
SS
All International Codes and Stanards that are referenced in the Saudi
AramcoStandards as well as those listed below are applicable
GH
GH
RH
British Standards
DESCRIPTION
10-01506-0001
10-01506-0001
13/12/13
19/02/14
DATE
Requirements
C
A
DATE ___________
National Association of Corrosion Engineers
PROJECT
ENGINEER
NACE MR0103 Materials Resistant in Sulphide Stress Cracking in
________________
Corrosive Petroleum Refining Environment
DATE ___________
NACE MR0175 Petroleum Natural Gas Industries Materials for use
CERTIFIED
in H2S Containing Environments in Oil and Gas
________________
Production
DATE ___________
CONSTRUCTION
National Electrical Manufacturing Association Standards
AGENCY
________
DATE ___________
CONTROL NUMBER
DATE _____________
BY: ______________
VERIFICATION
EDSD
THIS INDICATES THAT REV. NO. ____________
APPROVAL/CERTIFICATION REQUIREMENTS,
(DCC)NO. _______________________________
OF THIS DRAWING IS COVERED, FOR ALL
PROJECT SPECIFICATION DWG.TYPE PLANT .NO INDEX DRAWING NO. SHT. NO. REV. NO.