ELECTRICAL ENGINEERING

TECHNICAL PARTICULARS CUM DATA SHEET


Lurgi India

Technical Particulars cum Data Sheet


for
LV Sq. Cage Induction Motor

xx xxxxxx xxxx xx/xx/xx xxxx xx/xx/xx xxxx xx/xx/xx xxxxx Xxxxxxx xxxxxxxx
Rev. Sheet Name Date Name Date Name Date Status Remark, kind of revision

Prepared , revised Checked Approved


Designation Basis document DG DL-No. DCC

Project Name Project No. Document No. Sheet / of Revision


Lurgi India X 0 0 1/13 00

EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 1 of 5
Table of Contents
Section Page
1 General...............................................................................................................................................4
2 Major parameters...............................................................................................................................4
3 Efficiency, current , power factor and slip..........................................................................................5
Project Name Project No. Document No. Sheet / of Revision
X 0 2/13 00
4Lurgi Time and duty cycle...........................................................................................................................5
India
0
EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
5 Insulation............................................................................................................................................6
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 2 of 5
6 Shaft, enclosure and bearing..............................................................................................................7
7 Terminal box......................................................................................................................................7
8 RTD, BTD, thermistor.......................................................................................................................8
9 Space heater.......................................................................................................................................9
10 Weight and dimension........................................................................................................................9

Project Name Project No. Document No. Sheet / of Revision


X 0 3/13 00
Lurgi India
0
EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 3 of 5
Index of Relevant Documents
No. Title Summary of Revisions

Project Name Project No. Document No. Sheet / of Revision


X 0 4/13 00
Lurgi India
0
EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 4 of 5
Project Name Project No. Document No. Sheet / of Revision
X 0 5/13 00
Lurgi India
0
EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 5 of 5
Item Unit Technical Particulars

1 General
1.1 Manufacturer Name :
1.2 Job No. :
1.3 PO No. :
1.4 Equipment No. :
1.5 Location : Outdoor Indoor Roofed, open sides
1.6 Hight : 1000m >1000m
o
1.7 Design ambient temperature C :
1.8 Design relative humidity % :
1.9 Plant atmospheric condition :

Balance Data to be filled by the Vendor

2 Major parameters
2.1 Application (driven :
equipment)
2.2 Frame size and design code :
No.
2.3 Mounting type :
2.4 Enclosure Protection. :
2.5 Suitable for area classification. : Zone : Zone 1 Zone 2
Gas Group : IIA IIA/IIB IIC
Temp. class : T1 T2 T3 T4
T5
Temp. rise limited to oC
2.6 Rated kW kW :
2.7 kW actually required by kW :
driven equipment under
specified operating conditions.
2.8 Rated voltage Volt :
2.9 Rated frequency Hz
2.10 Permissible voltage variation % :
under normal running
conditions.
2.11 Permissible frequency %
variation under normal
running conditions
2.12 Minimum voltage required % :
under starting conditions to
bring driven equipment upto

Project Name Project No. Document No. Sheet / of Revision


X 0 0 6/13 00
Lurgi India

EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 4 of 5
Item Unit Technical Particulars
rated speed.
2.13 No. of phases :
2.14 Stator Windings connection : Star Delta
2.15 Resistance per phase Ohm :
2.16 Resistance between terminals. Ohm :
2.17 Full load speed at rated rpm :
Voltage and Frequency
2.18 Full load torque kg-m :
2.19 Starting torque (% of full load % :
torque)
2.20 Maximum torque (% of full % :
load torque)
2.21 Moment of inertia (Gd2)
a) Of load kg-m2 :
b) Of motor kg-m2 :
2.22 Critical speed
a) Upper rpm :
b) Lower rpm :
2.23 Purging required. If yes Yes No Details:
details.

3 Efficiency, current , power


factor and slip
3.1 Efficiency
a) At full load % :
b) At load % :
c) At load % :
3.2 Current
a) At no load Amp :
b) At starting Amp
c) At full load Amp :
d) At load Amp :
e) At load Amp :
3.3 Power factor
a) At starting :
b) At full load
c) At load :
d) At load :

Project Name Project No. Document No. Sheet / of Revision


X 0 0 7/13 00
Lurgi India

EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 4 of 5
Item Unit Technical Particulars
3.4 Slip
a) At full load % :
b) At load % :
c) At load % :

4 Time and duty cycle


4.1 Accelerating time without
load
a) Uncoupled at rated sec :
voltage
b) Coupled at rated voltage. Sec :
c) Coupled at minimum sec :
permissible starting
voltage
4.2 Accelerating time with load
a) Coupled at rated voltage. Sec :
b) Coupled at minimum sec :
permissible starting
voltage
4.3 Duty cycle
a) Starting duty cycle at cold :
conditions.
b) Starting duty cycle at hot :
conditions
c) Average number of starts :
permissible during 1 hour
period
d) Number of consecutive :
start from cold condition
e) Number of consecutive :
start from hot condition
4.4 Safe stall time
a) When motor is at rated sec :
operating temperature
b) When motor is at ambient sec :
temperature
o
c) Limiting rotor C :
temperature used (to
determine stall time) i
d) Stator thermal time :
constant
4.5 Permissible running time

Project Name Project No. Document No. Sheet / of Revision


X 0 0 8/13 00
Lurgi India

EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 4 of 5
Item Unit Technical Particulars
a) With full load at 80% min :
rated voltage
b) With full load at 75% min :
rated voltage
5 Insulation :

5.1 Class of insulation


5.2 Class of insulation upto which :
temperature rise is limited
5.3 Material and treatment of :
insulation.
o
5.4 Maximum temperature rise C :
which can be withstood by the
above insulation.
o
5.5 Maximum temp. rise limited C :
to.
5.6 Temp. rise over ambient
o
a) By thermometer C :
o
b) By winding resistance C :
5.7 Varnish for winding

6 Shaft, enclosure and bearing


6.1 Shaft
a) Horizontal orientation :
b) Vertical orientation :
c) Method of connection to :
driven equipment.
d) Direction of rotation : Clockwise Counter clockwise
viewed from driven
equipment towards motor
6.2 Enclosure
a) Material :
b) Ventilation type :
c) Method and number of :
ground points
d) Conductor for which :
grounding is suitable
e) Painting details :
6.3 Bearing Driving end Non driving end
a) Type :
b) Size :

Project Name Project No. Document No. Sheet / of Revision


X 0 0 9/13 00
Lurgi India

EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 4 of 5
Item Unit Technical Particulars
c) Clearance mm :
d) Life in hours for actual year :
speed
e) Recommended lubrication :
interval
f) End play mm :
g) Housing fit with :
tolerances.
h) Thrust bearing losses :
i) Shaft fit with tolerances :
j) Bearing insulation details :
k) Min. permissible lube oil :
flow (if applicable)
l) Normal lube oil flow ( if :
applicable)
7 Terminal box
7.1 Main terminal box
a) Location of terminal box : Left Right Top
viewed from driving end
towards motor
b) Whether phases : Yes No
segregated.
c) Terminal connectors for :
stator leads -type and
number
d) Terminal connectors for : X C mm2
incoming cable runs, size Type
and type
e) Distance beween gland mm :
plate and terminal
7.2 Other terminal boxes
a) Separate neutral terminal : Yes No
box provided
b) Separate terminal box for : Yes No
space heater provided
c) Separate terminal box for : Yes No
thermistor provided
d) Separate terminal box : Yes No
for wdg. temp detector
provided
e) Separate terminal box for : Yes No
bearing temp provided

Project Name Project No. Document No. Sheet / of Revision


X 0 0 10/13 00
Lurgi India

EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 4 of 5
Item Unit Technical Particulars
f) Separate terminal box for : Yes No
techogenerator provided
8 RTD, BTD, thermistor
8.1 Winding Temperature detector
a) Type :
b) Material :
c) No. of wire connection :
d) No. per phase :
8.2 Bearing temperature detector
a) Type :
b) No. of wire connection :
c) Material :
d) Total no. :
8.3 Thermistor
a) Type :
b) Material :
c) No. of wire connection :
d) Total no.
8.4 Flow indicator (if applicable)
a) Type :
b) Dial size :
c) No. of spare contacts :

8.5 Oil temperature indicator


a) Type :
b) Dial size :
c) No. of spare contacts :

9 Space heater
9.1 Whether provided : Yes No
9.2 Rated Voltage and phase : Volt ; phase
9.3 Wattage & No. : Watt X no.
9.4 Cable size and type : C mm2 : type -

10 Weight and dimension


10.1 Weight
a) Weight of the rotor kg :
b) Total weight kg :

Project Name Project No. Document No. Sheet / of Revision


X 0 0 11/13 00
Lurgi India

EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 4 of 5
Item Unit Technical Particulars
10.2 Overall dimensions mm : mm (H) X mm (W) X mm
(D)
10.3 Minimum clear height mm :
required to lift the core and
winding
10.4 Transportation
a) Parts detached for :
transportation
b) Dimension of heaviest mm : mm (H) X mm (W) X mm (D)
package
c) Weight of heaviest kg :
package

Project Name Project No. Document No. Sheet / of Revision


X 0 0 12/13 00
Lurgi India

EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 4 of 5
Index of Revisions
Rev. Sheet Prepared, revised Checked Approved Remark, kind of revision
Name Date Name Date Name Date Status

Project Name Project No. Document No. Sheet / of Revision


X 0 0 13/13 00
Lurgi India

EDP Ident. No. 365541401.doc Derived from GFA 0373Ei Blank form LI-OEE-FMT- 0010
Issue 00, 25.02.2000 Issue: Rev. 00 , 18.12.2000 Sheet 5 of 5