Waste Management Plan

SITE AND DEVELOPMENT DETAILS

Existing Development Vacant Lot.

Proposed Development Proposed Single Storey Dwelling.

Number of Proposed
1
Dwellings

Number of Proposed
Commercial/ N/A
Industrial Tenancies

Date 01.05.2017
Part 1: Demolition

RE-USE/RECYCLING/DISPOSAL
Materials Destinatio
Onsite n
Re-Use and Recycling Disposal
Type of Estimat Onsite Offsite
Material ed Re- Use Re- Use Offsite Disposal
Volume and and
(m3 or Recycling Recyclin
Excavation tonnes) g
3.5m3 N/A N/A Eastern Creek
Material

Green Waste
N/A N/A N/A N/A

Bricks Crushed for Concrete


4.5m3 temporary Recycling Eastern Creek
driveway

Concrete Crushed for Concrete


5m3 temporary Recycling Eastern Creek
driveway
Timber
4m3 Garden beds N/A Eastern Creek

Plasterboard
7m3 N/A N/A Eastern Creek

Metals
3m3 N/A N/A Eastern Creek

Tiles Crushed for Concrete


0.5m3 temporary Recycling Eastern Creek
driveway
Other specify
(such as light Eastern Creek
fittings, 2m3 N/A N/A
kitchen/bathro
om fittings)
Part 2: Construction

RE-USE/RECYCLING/DISPOSAL
Materials Destination
Onsite Re-Use and Recycling Disposal
Type of Estimated Onsite Re- Offsite Re- Offsite
Material 3 Use and Use and Disposal
Volume (m
or tonnes) Recycling Recycling

Excavation
30m3 N/A N/A N/A
Material
Green Waste
N/A N/A N/A N/A

Bricks Crushed for Concrete


3 temporary Recycling Eastern Creek
4m
driveway
Concrete Crushed for Concrete
3 temporary Recycling Eastern Creek
2m
driveway
Timber 3
5m Garden beds N/A Eastern Creek

Plasterboard
3 N/A N/A Eastern Creek
5m

Metals
3m3 N/A N/A
N/A

Tiles Crushed for Concrete


6 temporary Recycling N/A
driveway
Other specify
(such as light
fittings, 8 N/A N/A N/A
kitchen/bathr
oom fittings)