49 Renew Solar Power Private Limited (India) 16/08/17 11h34 Page 1/4

Grid-Connected System: Simulation parameters

Project : 20MW Turuvekere


Geographical Site Turuvekre Country India
Situation Latitude 13.20 N Longitude 76.70 E
Time defined as Legal Time Time zone UT+5.5 Altitude 802 m
Albedo 0.20
Meteo data: Turuvekre Synthetic

Simulation variant : fixed 20% PARN


Simulation date 16/08/17 11h17
Simulation for the first year of operation

Simulation parameters
Collector Plane Orientation Tilt 12 Azimuth 0
999 Sheds Pitch 6.00 m Collector width 3.92 m
Inactive band Top 0.02 m Bottom 0.02 m
Shading limit angle Gamma 20.89 Occupation Ratio 65.3 %

Models used Transposition Perez Diffuse Perez, Meteonorm


Horizon Free Horizon
Near Shadings Mutual shadings of sheds

PV Array Characteristics
PV module Si-poly Model JAP6-72-315/3BB
Original PVsyst database Manufacturer JA Solar
Number of PV modules In series 20 modules In parallel 3810 strings
Total number of PV modules Nb. modules 76200 Unit Nom. Power 315 Wp
Array global power Nominal (STC) 24003 kWp At operating cond. 21539 kWp (50C)
Array operating characteristics (50C) U mpp 667 V I mpp 32281 A
Total area Module area 147706 m Cell area 133517 m

Inverter Model Solar Ware 1000 - PVL-L1000E


Custom parameters definition Manufacturer TMEIC
Characteristics Operating Voltage 605-950 V Unit Nom. Power 1000 kWac
Inverter pack Nb. of inverters 20 units Total Power 20000 kWac

PV Array loss factors


Array Soiling Losses Loss Fraction 2.0 %
Thermal Loss factor Uc (const) 29.0 W/mK Uv (wind) 0.0 W/mK / m/s
Wiring Ohmic Loss Global array res. 0.58 mOhm Loss Fraction 2.5 % at STC
LID - Light Induced Degradation Loss Fraction 1.0 %
Module Quality Loss Loss Fraction -0.1 %
Module Mismatch Losses Loss Fraction 1.0 % at MPP
Module average degradation Year no 1 Loss factor 0.4 %/year
Mismatch due to degradation Imp dispersion RMS 0.4 %/year Voc dispersion RMS 0.4 %/year
Incidence effect, ASHRAE parametrization IAM = 1 - bo (1/cos i - 1) bo Param. 0.05

PVsyst Licensed to Renew Solar Power Private Limited (India)


PVSYST V6.49 Renew Solar Power Private Limited (India) 16/08/17 11h34 Page 2/4

Grid-Connected System: Simulation parameters (continued)

System loss factors


AC wire loss inverter to transfo Inverter voltage 418 Vac tri
Wires: 3x30000.0 mm 178 m Loss Fraction 1.5 % at STC
External transformer Iron loss (24H connexion) 23510 W Loss Fraction 0.1 % at STC
Resistive/Inductive losses 0.1 mOhm Loss Fraction 1.7 % at STC
Unavailability of the system 1.8 days, 3 periods Time fraction 0.5 %

User's needs : Unlimited load (grid)

PVsyst Licensed to Renew Solar Power Private Limited (India)


PVSYST V6.49 Renew Solar Power Private Limited (India) 16/08/17 11h34 Page 3/4

Grid-Connected System: Main results


Project : 20MW Turuvekere
Simulation variant : fixed 20% PARN
Simulation for the first year of operation

Main system parameters System type Grid-Connected


PV Field Orientation Sheds disposition, tilt 12 azimuth 0
PV modules Model JAP6-72-315/3BB Pnom 315 Wp
PV Array Nb. of modules 76200 Pnom total 24003 kWp
Inverter Model Solar Ware 1000 - PVL-L1000E 1000 kW ac
Inverter pack Nb. of units 20.0 Pnom total 20000 kW ac
User's needs Unlimited load (grid)

Main simulation results


System Production Produced Energy Specific prod.
38354069976 W/year 1598 kWh/kWp/year
Performance Ratio PR 78.74 %

Normalized productions (per installed kWp): Nominal power 24003 kWp Performance Ratio PR
8 1.0
PR : Performance Ratio (Yf / Yr) : 0.787
Lc : Collection Loss (PV-array losses) 0.97 kWh/kWp/day
Ls : System Loss (inverter, ...) 0.21 kWh/kWp/day
7 Yf : Produced useful energy (inverter output) 4.38 kWh/kWp/day

0.8
6
Normalized Energy [kWh/kWp/day]

Performance Ratio PR

5
0.6

0.4
3

2
0.2

0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

fixed 20% PARN


Balances and main results

GlobHor T Amb GlobInc GlobEff EArray E_Grid EffArrR EffSysR


kWh/m C kWh/m kWh/m kWh kWh % %
January 181.0 22.20 207.2 196.1 4137217 3966819 13.52 12.96
February 179.0 24.40 195.7 185.6 3843204 3538892 13.30 12.24
March 210.0 26.80 218.1 206.7 4236909 4063623 13.15 12.61
April 213.0 27.80 210.6 199.5 4072096 3904832 13.09 12.55
May 196.0 26.80 186.8 175.4 3664977 3520349 13.29 12.76
June 133.0 24.60 126.2 117.4 2524729 2427406 13.54 13.02
July 127.0 23.70 121.4 112.9 2438686 2314574 13.60 12.91
August 129.0 23.40 125.5 116.9 2526869 2428949 13.63 13.10
September 133.0 23.90 134.0 125.2 2682048 2575869 13.55 13.02
October 156.0 23.50 165.1 155.9 3276289 3140182 13.43 12.87
November 145.0 22.40 159.7 150.7 3202551 3071084 13.58 13.02
December 157.0 21.39 179.0 169.2 3607806 3401491 13.65 12.87
Year 1959.0 24.23 2029.3 1911.4 40213381 38354070 13.42 12.80

Legends: GlobHor Horizontal global irradiation EArray Effective energy at the output of the array
T Amb Ambient Temperature E_Grid Energy injected into grid
GlobInc Global incident in coll. plane EffArrR Effic. Eout array / rough area
GlobEff Effective Global, corr. for IAM and shadings EffSysR Effic. Eout system / rough area

PVsyst Licensed to Renew Solar Power Private Limited (India)


PVSYST V6.49 Renew Solar Power Private Limited (India) 16/08/17 11h34 Page 4/4

Grid-Connected System: Loss diagram


Project : 20MW Turuvekere
Simulation variant : fixed 20% PARN
Simulation for the first year of operation

Main system parameters System type Grid-Connected


PV Field Orientation Sheds disposition, tilt 12 azimuth 0
PV modules Model JAP6-72-315/3BB Pnom 315 Wp
PV Array Nb. of modules 76200 Pnom total 24003 kWp
Inverter Model Solar Ware 1000 - PVL-L1000E 1000 kW ac
Inverter pack Nb. of units 20.0 Pnom total 20000 kW ac
User's needs Unlimited load (grid)

Loss diagram over the whole year

1959 kWh/m Horizontal global irradiation


+3.6% Global incident in coll. plane

-1.1% Near Shadings: irradiance loss


-2.9% IAM factor on global
-2.0% Soiling loss factor

1911 kWh/m * 147706 m coll. Effective irradiance on collectors

efficiency at STC = 16.26% PV conversion

45894 MWh Array nominal energy (at STC effic.)


-0.2% Module Degradation loss (for year #1)
-0.5% PV loss due to irradiance level

-8.3% PV loss due to temperature

+0.1% Module quality loss

-1.0% LID - Light induced degradation


-1.0% Module array mismatch loss
-1.8% Ohmic wiring loss
40260 MWh Array virtual energy at MPP

-1.8% Inverter Loss during operation (efficiency)


-0.1% Inverter Loss over nominal inv. power
0.0% Inverter Loss due to power threshold
0.0% Inverter Loss over nominal inv. voltage
0.0% Inverter Loss due to voltage threshold
39505 MWh Available Energy at Inverter Output

-0.6% System unavailability


-0.8% AC ohmic loss
-1.5% External transfo loss

38354 MWh Energy injected into grid