CALCULO DEL CONSUMO MAXIMO DIARIO Y MAXIMO HORARIO

INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO L
PROYECTO SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

UBICACIN DPTO: CUSCO


PROVINCIA: LA CONVENCION
DISTRITO: SANTA ANA
SECTOR: SAN JACINTO - LA VICTORIA

Descripcin
N Parmetro FORMULA Valor
1 N de familias 58.00
2 Densidad Poblacional 5.00
3 Poblacin Actual Pa 290.00
4 Periodo de Diseo t 20.00
5 Tasa de Crecimiento r 0.11
6 Poblacin Futura : P f = Pa * (1 + r * t) 296.00
7 Dotacin (ver tablas) Dot. 130.00
8 Consumo Promedio Anual: Qp = Pf * Dot/ 86400 0.45
9 Prdidas Fijas Sistema Proyectado p 20
10 Demanda de Produccin de Agua Media Anual Qp' = Qp/(1-p) 0.56
11 Coef. De Consumo Maximo Diario k1 1.30
12 Consumo Mximo Diario Qmd = Qp' x k1 0.72
13 Coef. De Consumo Maximo Horario k2 2.50
14 Consumo Mximo Horario Qmh = Qp' x k2 1.39
MAXIMO HORARIO

OS SECTORES DE SAN JACINTO LA VICTORIA, DISTRITO DE


ONVENCION CUSCO

ripcin Fuente
Unidad. Informac
Encuestas
hab./fam. Encuestas
hab.
aos Manual MEF
% Censo de Poblacin
hab.
lt/hab/da Promedio: RNE, DIGESA y OMS
lt/seg
%
lt/seg
RNE
lt/seg
RNE
lt/seg
CALCULO DE VOLUMENES DE RESERVORIOS

INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA V
PROYECTO DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Parmetro Descripcin
N Predimensionamiento: reservorio N01 Simbolo. Valor Unidad.
1 N de familias 6.00
2 Densidad Poblacional 5.00 hab./fam.
3 Poblacin Actual Pa 30.00 hab.
4 Periodo de Diseo t 20.00 aos
5 Tasa de Crecimiento r 0.11 %
6 Poblacin Futura: P f = Pa * (1 + r * t) 31.0 hab.
7 Dotacin (ver tablas) Dot. 130.00 lt/hab/da
8 Consumo Promedio Anual: Qp = Pf * Dot/ 86400 = 0.05 lt/seg
9 Prdidas Fijas Sistema Proyectado p 20 %
10 Demanda de Produccin de Agua Media Anual: Qp' = Qp/(1-p) 0.06 lt/seg
11 Coef. De Consumo Maximo Diario k1 1.30
12 Consumo Mximo Diario Qmd = Qp' x k1 0.08 lt/seg
13 Coef. De Consumo Maximo Horario k2 2.50
14 Consumo Mximo Horario : Qmh = Qp' x k2 0.15 lt/seg
15 Volmen de Regulacin del Reservorio Vr = 0.25 x Qpx 86400/1000 1.26 m3
16 Volmen de Reservorio adoptado Vrf 1.50 m3

Parmetro Descripcin
N Predimensionamiento: reservorio N02 Simbolo. Valor Unidad.
1 N de familias 9.00
2 Densidad Poblacional 5.00 hab./fam.
3 Poblacin Actual Pa 45.00 hab.
4 Periodo de Diseo t 20.00 aos
5 Tasa de Crecimiento r 0.11 %
6 Poblacin Futura: P f = Pa * (1 + r * t) 46.0 hab.
7 Dotacin (ver tablas) Dot. 130.00 lt/hab/da
8 Consumo Promedio Anual: Qp = Pf * Dot/ 86400 = 0.07 lt/seg
9 Prdidas Fijas Sistema Proyectado p 20 %
10 Demanda de Produccin de Agua Media Anual: Qp' = Qp/(1-p) 0.09 lt/seg
11 Coef. De Consumo Maximo Diario k1 1.30
12 Consumo Mximo Diario Qmd = Qp' x k1 0.11 lt/seg
13 Coef. De Consumo Maximo Horario k2 2.50
14 Consumo Mximo Horario : Qmh = Qp' x k2 0.22 lt/seg
15 Volmen de Regulacin del Reservorio Vr = 0.25 x Qpx 86400/1000 1.87 m3
16 Volmen de Reservorio adoptado Vrf 2.00 m3

Parmetro Descripcin
N Predimensionamiento: reservorio N03 Simbolo. Valor Unidad.
1 N de familias 10.00
2 Densidad Poblacional 5.00 hab./fam.
3 Poblacin Actual Pa 50.00 hab.

3
CALCULO DE VOLUMENES DE RESERVORIOS

INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA V
PROYECTO DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO
4 Periodo de Diseo t 20.00 aos
5 Tasa de Crecimiento r 0.11 %
6 Poblacin Futura: P f = Pa * (1 + r * t) 51.0 hab.
7 Dotacin (ver tablas) Dot. 130.00 lt/hab/da
8 Consumo Promedio Anual: Qp = Pf * Dot/ 86400 = 0.08 lt/seg
9 Prdidas Fijas Sistema Proyectado p 20 %
10 Demanda de Produccin de Agua Media Anual: Qp' = Qp/(1-p) 0.10 lt/seg
11 Coef. De Consumo Maximo Diario k1 1.30
12 Consumo Mximo Diario Qmd = Qp' x k1 0.12 lt/seg
13 Coef. De Consumo Maximo Horario k2 2.50
14 Consumo Mximo Horario : Qmh = Qp' x k2 0.24 lt/seg
15 Volmen de Regulacin del Reservorio Vr = 0.25 x Qpx 86400/1000 2.01 m3
16 Volmen de Reservorio adoptado Vrf 2.00 m3

4
CALCULO DE VOLUMENES DE RESERVORIOS

INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA V
PROYECTO DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Parmetro Descripcin
N Predimensionamiento: reservorio N04 Simbolo. Valor Unidad.
1 N de familias 13.00
2 Densidad Poblacional 5.00 hab./fam.
3 Poblacin Actual Pa 65.00 hab.
4 Periodo de Diseo t 20.00 aos
5 Tasa de Crecimiento r 0.11 %
6 Poblacin Futura: P f = Pa * (1 + r * t) 66.0 hab.
7 Dotacin (ver tablas) Dot. 130.00 lt/hab/da
8 Consumo Promedio Anual: Qp = Pf * Dot/ 86400 = 0.10 lt/seg
9 Prdidas Fijas Sistema Proyectado p 20 %
10 Demanda de Produccin de Agua Media Anual: Qp' = Qp/(1-p) 0.12 lt/seg
11 Coef. De Consumo Maximo Diario k1 1.30
12 Consumo Mximo Diario Qmd = Qp' x k1 0.16 lt/seg
13 Coef. De Consumo Maximo Horario k2 2.50
14 Consumo Mximo Horario : Qmh = Qp' x k2 0.31 lt/seg
15 Volmen de Regulacin del Reservorio Vr = 0.25 x Qpx 86400/1000 2.68 m3
16 Volmen de Reservorio adoptado Vrf 3.00 m3

Parmetro Descripcin
N Predimensionamiento: reservorio N05 Simbolo. Valor Unidad.
1 N de familias 4.00
2 Densidad Poblacional 5.00 hab./fam.
3 Poblacin Actual Pa 20.00 hab.
4 Periodo de Diseo t 20.00 aos
5 Tasa de Crecimiento r 0.11 %
6 Poblacin Futura: P f = Pa * (1 + r * t) 20.0 hab.
7 Dotacin (ver tablas) Dot. 150.00 lt/hab/da
8 Consumo Promedio Anual: Qp = Pf * Dot/ 86400 = 0.03 lt/seg
9 Prdidas Fijas Sistema Proyectado p 20 %
10 Demanda de Produccin de Agua Media Anual: Qp' = Qp/(1-p) 0.04 lt/seg
11 Coef. De Consumo Maximo Diario k1 1.30
12 Consumo Mximo Diario Qmd = Qp' x k1 0.06 lt/seg
13 Coef. De Consumo Maximo Horario k2 2.50
14 Consumo Mximo Horario : Qmh = Qp' x k2 0.11 lt/seg
15 Volmen de Regulacin del Reservorio Vr = 0.25 x Qpx 86400/1000 0.94 m3
16 Volmen de Reservorio adoptado Vrf 1.00 m3

Parmetro Descripcin
N Predimensionamiento: reservorio N06 Simbolo. Valor Unidad.
1 N de familias 14.00
2 Densidad Poblacional 5.00 hab./fam.
3 Poblacin Actual Pa 70.00 hab.

5
CALCULO DE VOLUMENES DE RESERVORIOS

INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA V
PROYECTO DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO
4 Periodo de Diseo t 20.00 aos
5 Tasa de Crecimiento r 0.11 %
6 Poblacin Futura: P f = Pa * (1 + r * t) 72.0 hab.
7 Dotacin (ver tablas) Dot. 130.00 lt/hab/da
8 Consumo Promedio Anual: Qp = Pf * Dot/ 86400 = 0.11 lt/seg
9 Prdidas Fijas Sistema Proyectado p 20 %
10 Demanda de Produccin de Agua Media Anual: Qp' = Qp/(1-p) 0.14 lt/seg
11 Coef. De Consumo Maximo Diario k1 1.30
12 Consumo Mximo Diario Qmd = Qp' x k1 0.18 lt/seg
13 Coef. De Consumo Maximo Horario k2 2.50
14 Consumo Mximo Horario : Qmh = Qp' x k2 0.34 lt/seg
15 Volmen de Regulacin del Reservorio Vr = 0.25 x Qpx 86400/1000 2.93 m3
16 Volmen de Reservorio adoptado Vrf 3.00 m3

6
CALCULO DE VOLUMENES DE RESERVORIOS

INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA V
PROYECTO DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Parmetro Descripcin
N Predimensionamiento: reservorio N07 Simbolo. Valor Unidad.
1 N de familias 2.00
2 Densidad Poblacional 5.00 hab./fam.
3 Poblacin Actual Pa 10.00 hab.
4 Periodo de Diseo t 20.00 aos
5 Tasa de Crecimiento r 0.11 %
6 Poblacin Futura: P f = Pa * (1 + r * t) 10.0 hab.
7 Dotacin (ver tablas) Dot. 130.00 lt/hab/da
8 Consumo Promedio Anual: Qp = Pf * Dot/ 86400 = 0.02 lt/seg
9 Prdidas Fijas Sistema Proyectado p 20 %
10 Demanda de Produccin de Agua Media Anual: Qp' = Qp/(1-p) 0.02 lt/seg
11 Coef. De Consumo Maximo Diario k1 1.30
12 Consumo Mximo Diario Qmd = Qp' x k1 0.02 lt/seg
13 Coef. De Consumo Maximo Horario k2 2.50
14 Consumo Mximo Horario : Qmh = Qp' x k2 0.05 lt/seg
15 Volmen de Regulacin del Reservorio Vr = 0.25 x Qpx 86400/1000 0.41 m3
16 Volmen de Reservorio adoptado Vrf 0.50 m3
*. Se concluye que solo tendra captacion

NOTA: Realizando las iteraciones respectivas (segn nmero de familias), se tienen los siguientes resultados de capacidad para
reservorios planteados

Reservorio Nro Familias Capacidad


RESERVORIO N01 - (proyectado) 6.00 1.50m3
RESERVORIO N02 - (proyectado) 9.00 2.00m3
RESERVORIO N03 - (proyectado) 10.00 2.00m3
RESERVORIO N04 - (proyectado) 13.00 3.00m3
RESERVORIO N05 - (proyectado) 4.00 1.00m3
RESERVORIO N06 - (proyectado) 14.00 3.00m3
RESERVORIO N07 - (proyectado) 2.00 0.50m3
58 13.00m3

7
LCULO DE VOLUMENES DE RESERVORIOS

E SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA,


TO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Fuente
Informacion
Encuestas
Encuestas

Manual MEF
Censo de Poblacin

Prom.: RNE, DIGESA y OMS

RNE

RNE

RNE

Fuente
Informacion
Encuestas
Encuestas

Manual MEF
Censo de Poblacin

Prom.: RNE, DIGESA y OMS

RNE

RNE

RNE

Fuente
Informacion
Encuestas
Encuestas

8
LCULO DE VOLUMENES DE RESERVORIOS

E SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA,


TO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO
Manual MEF
Censo de Poblacin

Prom.: RNE, DIGESA y OMS

RNE

RNE

RNE

9
LCULO DE VOLUMENES DE RESERVORIOS

E SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA,


TO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Fuente
Informacion
Encuestas
Encuestas

Manual MEF
Censo de Poblacin

Prom.: RNE, DIGESA y OMS

RNE

RNE

RNE

Fuente
Informacion
Encuestas
Encuestas

Manual MEF
Censo de Poblacin

Prom.: RNE, DIGESA y OMS

RNE

RNE

RNE

Fuente
Informacion
Encuestas
Encuestas

10
LCULO DE VOLUMENES DE RESERVORIOS

E SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA,


TO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO
Manual MEF
Censo de Poblacin

Prom.: RNE, DIGESA y OMS

RNE

RNE

RNE

11
LCULO DE VOLUMENES DE RESERVORIOS

E SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA,


TO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Fuente
Informacion
Encuestas
Encuestas

Manual MEF
Censo de Poblacin

Prom.: RNE, DIGESA y OMS

RNE

RNE

RNE

12
CALCULO HIDRAULICO DE LAS REDES DE LA LINEA DE CONDUCCION DE AGUA POTABLE DEL SUB SIST

NOMBRE DE PROYECTO: INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, P
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

A POBLACION ACTUAL 58 FAM


INTEGRANTES POR FAMILIA 5 HAB
POBLACION ACTUAL 290 HAB
B TASA DE CRECIMIENTO (%) 0.11 %
C PERIODO DE DISEO 20 AOS
D POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 296 HAB
E DOTACION LT/HAB/DIA 100 Lt/hab/dia
PORCENTAJE DE DESPERDICIO 20 %
F CONSUMO PROMEDIO ANUAL Qp= (Pob. x Dot./86,400)/(1 - %PF) 0.429 LT/SEG
G CONSUMO MAXIMO DIARIO Qmd = 1.30 x Qp 0.557 LT/SEG
H TIPO DE FUENTE MANANTE
TIPO DE MANANTE LADERA
NUMERO DE MANANTES 1 mant
CAUDAL DE LA FUENTE CAPTACION N01 Lt/Seg 5.520 LT/SEG
CAUDAL DE LA FUENTE MANANTE CAPTACION N02 Lt/Seg 0.000 LT/SEG
CAUDAL TOTAL DE LA FUENTES A USAR Lt/Seg 5.520 LT/SEG
I VOL DE RESERVORIO(M3) V = 0.25 x Qp x 86400/1000 9.26 M3
J CONSUMO MAXIMO HORARIO Qmh = 2.50 x Qp 1.07 LT/SEG

HAZZEN WILLIAMS Q=0.0004264*C*D^2.64*hf^0.54 C=150 PARA PVC

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE CONDUCCION
CAPT -N01 SEDIMENTADOR 1660.00 1650.00 50.00 10.00 0.050 51.00 0.836 200.00 0.90 2 '' 0.00203 6.850
SEDIMENTADORFILTRO LENTO 1650.00 1625.00 20.00 25.00 0.020 33.00 0.836 1250.00 0.62 2 '' 0.00203 14.213
FILTRO LENTO CRP-T6 N01 1625.00 1560.00 180.00 65.00 0.180 192.00 0.836 361.11 0.79 2 '' 0.00203 9.200
CRP-T6 N01 CDC - N01 1560.00 1520.00 230.00 40.00 0.230 234.00 0.836 173.91 0.92 2 '' 0.00203 6.361

13
Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
CDC - N01 RESEV-N01 1520.00 1500.00 80.00 20.00 0.080 83.00 0.100 250.00 0.38 1 '' 0.00051 1.237

CDC - N01 CRP-T6 N02 1520.00 1460.00 215.00 60.00 0.215 224.00 0.300 279.07 0.57 1 1/2'' 0.00114 3.804
CRP-T6 N02 CDC - N02 1460.00 1410.00 85.00 50.00 0.085 99.00 0.300 588.24 0.49 1 1/2'' 0.00114 5.358
CDC - N02 RESEV-N02 1410.00 1395.00 20.00 15.00 0.020 25.00 0.100 750.00 0.31 1 '' 0.00051 2.024

CDC - N02 CRP-T6 N03 1410.00 1345.00 115.00 65.00 0.115 133.00 0.300 565.22 0.49 1 1/2'' 0.00114 5.264
CRP-T6 N03 CDC - N03 1345.00 1280.00 270.00 65.00 0.270 278.00 0.300 240.74 0.59 1 1/2'' 0.00114 3.535
CDC - N03 RESEV-N03 1280.00 1230.00 250.00 50.00 0.250 255.00 0.100 200.00 0.40 1 '' 0.00051 1.107

CDC - N03 RESEV-N04 1280.00 1250.00 805.00 30.00 0.805 806.00 0.100 37.27 0.57 1 '' 0.00051 0.451

CDC - N01 PASE A 1520.00 1510.00 170.00 10.00 0.170 171.00 0.300 58.82 0.78 1 1/2'' 0.00114 1.673
PASE A PASE B 1510.00 1509.00 30.00 1.00 0.030 31.00 0.300 33.33 0.88 1 1/2'' 0.00114 1.213
PASE B CRP-T6 N04 1509.00 1455.00 105.00 54.00 0.105 119.00 0.300 514.29 0.50 1 1/2'' 0.00114 5.057
CRP-T6 N04 CDC - N04 1455.00 1390.00 215.00 65.00 0.215 225.00 0.300 302.33 0.56 1 1/2'' 0.00114 3.963
CDC - N04 RESEV-N05 1390.00 1350.00 125.00 40.00 0.125 132.00 0.100 320.00 0.37 1 '' 0.00051 1.400

CDC - N04 CRP-T6 N05 1390.00 1325.00 170.00 65.00 0.170 182.00 0.200 382.35 0.46 1 '' 0.00051 1.530
CRP-T6 N05 CRP-T6 N06 1325.00 1255.00 120.00 70.00 0.120 139.00 0.200 583.33 0.42 1 '' 0.00051 1.842
CRP-T6 N06 CRP-T6 N07 1255.00 1185.00 215.00 70.00 0.215 227.00 0.200 325.58 0.47 1 '' 0.00051 1.413
CRP-T6 N07 RESEV-N06 1185.00 1135.00 265.00 50.00 0.265 270.00 0.200 188.68 0.53 1 '' 0.00051 1.073

CAPT -N04 CRP-T6 N08 1750.00 1680.00 105.00 70.00 0.105 127.00 0.100 666.67 0.31 3/4'' 0.00029 0.907
CRP-T6 N08 CRP-T6 N09 1680.00 1615.00 105.00 65.00 0.105 124.00 0.100 619.05 0.32 3/4'' 0.00029 0.883
CRP-T6 N09 CRP-T6 N10 1615.00 1550.00 110.00 65.00 0.110 128.00 0.100 590.91 0.32 3/4'' 0.00029 0.868
CRP-T6 N10 RESEV-N01 1550.00 1510.00 105.00 40.00 0.105 113.00 0.100 380.95 0.35 3/4'' 0.00029 0.714

14
ES DE LA LINEA DE CONDUCCION DE AGUA POTABLE DEL SUB SISTEMA N01

ORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

3.38 0.41 0.22 1660.00 1659.78 9.78


7.01 0.41 0.09 1650.00 1649.91 24.91
4.54 0.41 0.80 1625.00 1624.20 64.20
3.14 0.41 1.02 1560.00 1558.98 38.98

15
Vel. tub Prd. carg. Cota piezo Cota piezo Presin
lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)
2.44 0.20 0.21 1520.00 1519.79 19.79

3.34 0.26 0.58 1520.00 1519.42 59.42


4.70 0.26 0.23 1460.00 1459.77 49.77
4.00 0.20 0.05 1410.00 1409.95 14.95

4.62 0.26 0.31 1410.00 1409.69 64.69


3.10 0.26 0.73 1345.00 1344.27 64.27
2.18 0.20 0.65 1280.00 1279.35 49.35

0.89 0.20 2.09 1280.00 1277.91 27.91

1.47 0.26 0.46 1520.00 1519.54 9.54


1.06 0.26 0.08 1510.00 1509.92 10.46
4.44 0.26 0.29 1509.00 1508.71 64.17
3.48 0.26 0.58 1455.00 1454.42 64.42
2.76 0.20 0.32 1390.00 1389.68 39.68

3.02 0.39 1.60 1390.00 1388.40 63.40


3.63 0.39 1.13 1325.00 1323.87 68.87
2.79 0.39 2.02 1255.00 1252.98 67.98
2.12 0.39 2.49 1185.00 1182.51 47.51

3.18 0.35 1.12 1750.00 1748.88 68.88


3.10 0.35 1.12 1680.00 1678.88 63.88
3.05 0.35 1.17 1615.00 1613.83 63.83
2.51 0.35 1.12 1550.00 1548.88 38.88

16
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE DEL SUB SISTEMA N01

NOMBRE DE PROYECTO: INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, P
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

A POBLACION ACTUAL 6 FAM


INTEGRANTES POR FAMILIA 5 HAB
POBLACION ACTUAL 30 HAB
B TASA DE CRECIMIENTO (%) 0.11 %
C PERIODO DE DISEO 20 AOS
D POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 31 HAB
E DOTACION LT/HAB/DIA 130 Lt/hab/dia
PORCENTAJE DE DESPERDICIO 20 %
F CONSUMO PROMEDIO ANUAL Qp= (Pob. x Dot./86,400)/(1 - %PF) 0.058 LT/SEG
G CONSUMO MAXIMO DIARIO Qmd = 1.30 x Qp 0.075 LT/SEG
H TIPO DE FUENTE MANANTE
TIPO DE MANANTE LADERA
NUMERO DE MANANTES 1 mant
CAUDAL DE LA FUENTE CAPTACION N01 Lt/Seg 5.520 LT/SEG
CAUDAL DE LA FUENTE MANANTE CAPTACION N02 Lt/Seg 0.000 LT/SEG
CAUDAL TOTAL DE LA FUENTES A USAR Lt/Seg 5.520 LT/SEG
I VOL DE RESERVORIO(M3) V = 0.25 x Qp x 86400/1000 1.25 M3
A UTILIZAR 1.50 M3
J CONSUMO MAXIMO HORARIO Qmh = 2.50 x Qp 0.14 LT/SEG

HAZZEN WILLIAMS Q=0.0004264*C*D^2.64*hf^0.54 C=150 PARA PVC

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE CONDUCCION
CDC - N01 RESEV-N01 1520.00 1500.00 80.00 20.00 0.080 83.00 0.100 250.00 0.38 1 '' 0.00051 1.237

17
Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE DISTRIBUCION SUBSISTEMA 01 0.120

RESEV-N01 A 1500.00 1495.00 20.00 5.00 0.020 21.00 0.720 250.00 0.81 1 1/2'' 0.00114 3.570
A B 1495.00 1490.00 20.00 5.00 0.020 21.00 0.480 250.00 0.69 1 '' 0.00051 1.229
B C 1490.00 1485.00 10.00 5.00 0.010 12.00 0.360 500.00 0.54 1 '' 0.00051 1.663
C D 1485.00 1478.00 45.00 7.00 0.045 46.00 0.240 155.56 0.59 1 '' 0.00051 0.965
D CASA03 1478.00 1475.00 5.00 3.00 0.005 6.00 0.120 600.00 0.34 1/2'' 0.00013 0.296
D CASA04 1478.00 1468.00 30.00 10.00 0.030 32.00 0.120 333.33 0.39 1/2'' 0.00013 0.230

B CASA01 1490.00 1488.00 5.00 2.00 0.005 6.00 0.120 400.00 0.37 1/2'' 0.00013 0.238
C CASA02 1485.00 1483.00 5.00 2.00 0.005 6.00 0.120 400.00 0.37 1/2'' 0.00013 0.238

A A1 1495.00 1485.00 110.00 10.00 0.110 111.00 0.120 90.91 0.51 3/4'' 0.00029 0.341
A1 A2 1485.00 1475.00 55.00 10.00 0.055 56.00 0.120 181.82 0.44 1/2'' 0.00013 0.170
A2 CASA06 1475.00 1474.00 50.00 1.00 0.050 50.00 0.120 20.00 0.69 1/2'' 0.00013 0.052
A1 CASA05 1485.00 1452.00 80.00 33.00 0.080 87.00 0.120 412.50 0.37 1/2'' 0.00013 0.255

18
ORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

2.44 0.20 0.21 1520.00 1519.79 19.79

19
Vel. tub Prd. carg. Cota piezo Cota piezo Presin
lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

3.13 0.63 0.28 1500.00 1499.72 4.72


2.43 0.95 0.95 1495.00 1494.05 8.78
3.28 0.71 0.28 1490.00 1489.72 13.50
1.90 0.47 0.59 1485.00 1484.41 19.90
2.34 0.95 0.55 1478.00 1477.45 22.36
1.82 0.95 3.28 1478.00 1474.72 26.62

1.88 0.95 0.55 1490.00 1489.45 10.23


1.88 0.95 0.55 1485.00 1484.45 14.95

1.20 0.42 1.64 1495.00 1493.36 13.08


1.34 0.95 6.01 1485.00 1478.99 17.07
0.41 0.95 5.47 1475.00 1469.53 12.60
2.02 0.95 8.75 1485.00 1476.25 37.33

20
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE DEL SUB SISTEMA N02

NOMBRE DE PROYECTO: INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, P
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

A POBLACION ACTUAL 9 FAM


INTEGRANTES POR FAMILIA 5 HAB
POBLACION ACTUAL 45 HAB
B TASA DE CRECIMIENTO (%) 0.11 %
C PERIODO DE DISEO 20 AOS
D POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 46 HAB
E DOTACION LT/HAB/DIA 130 Lt/hab/dia
PORCENTAJE DE DESPERDICIO 20 %
F CONSUMO PROMEDIO ANUAL Qp= (Pob. x Dot./86,400)/(1 - %PF) 0.086 LT/SEG
G CONSUMO MAXIMO DIARIO Qmd = 1.30 x Qp 0.112 LT/SEG
H TIPO DE FUENTE MANANTE
TIPO DE MANANTE LADERA
NUMERO DE MANANTES 1 mant
CAUDAL DE LA FUENTE CAPTACION N01 Lt/Seg 5.520 LT/SEG
CAUDAL DE LA FUENTE MANANTE CAPTACION N02 Lt/Seg 0.000 LT/SEG
CAUDAL TOTAL DE LA FUENTES A USAR Lt/Seg 5.520 LT/SEG
I VOL DE RESERVORIO(M3) V = 0.25 x Qp x 86400/1000 1.87 M3
A UTILIZAR 2.00 M3
J CONSUMO MAXIMO HORARIO Qmh = 2.50 x Qp 0.22 LT/SEG

HAZZEN WILLIAMS Q=0.0004264*C*D^2.64*hf^0.54 C=150 PARA PVC

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE CONDUCCION
CDC - N02 RESEV-N02 1410.00 1395.00 20.00 15.00 0.020 25.00 0.100 750.00 0.31 1 '' 0.00051 2.024

21
Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE DISTRIBUCION SUBSISTEMA 02 0.120

RESEV-N02 A 1395.00 1392.00 20.00 3.00 0.020 21.00 1.080 150.00 1.05 1 1/2'' 0.00114 2.709
A B 1392.00 1380.00 235.00 12.00 0.235 236.00 0.960 51.06 1.25 1 1/2'' 0.00114 1.551
B C 1380.00 1375.00 400.00 5.00 0.400 401.00 0.600 12.50 1.39 1 1/2'' 0.00114 0.726
C D 1375.00 1372.00 280.00 3.00 0.280 281.00 0.480 10.71 1.32 1 1/2'' 0.00114 0.668
D CASA14 1372.00 1371.00 5.00 1.00 0.005 6.00 0.120 200.00 0.43 3/4'' 0.00029 0.476
D CASA15 1372.00 1355.00 155.00 17.00 0.155 156.00 0.120 109.68 0.49 3/4'' 0.00029 0.378

A CASA07 1392.00 1355.00 70.00 37.00 0.070 80.00 0.120 528.57 0.35 1/2'' 0.00013 0.284

B B1 1380.00 1345.00 60.00 35.00 0.060 70.00 0.360 583.33 0.52 3/4'' 0.00029 0.861
B1 CRP-T7 N01 1345.00 1325.00 70.00 20.00 0.070 73.00 0.360 285.71 0.61 3/4'' 0.00029 0.622
CRP-T7 N01 B2 1325.00 1295.00 105.00 30.00 0.105 110.00 0.240 285.71 0.52 3/4'' 0.00029 0.621
B2 CASA10 1295.00 1290.00 5.00 5.00 0.005 8.00 0.120 1000.00 0.31 1/2'' 0.00013 0.334
B2 CASA09 1295.00 1292.00 55.00 3.00 0.055 56.00 0.120 54.55 0.56 1/2'' 0.00013 0.089
B1 CASA08 1345.00 1344.00 5.00 1.00 0.005 6.00 0.120 200.00 0.43 1/2'' 0.00013 0.164

C CRP-T7 N02 1375.00 1345.00 200.00 30.00 0.200 203.00 0.120 150.00 0.46 3/4'' 0.00029 0.446
CRP-T7 N02 CASA11 1345.00 1322.00 90.00 23.00 0.090 93.00 0.120 255.56 0.41 3/4'' 0.00029 0.589

D CRP-T7 N03 1372.00 1345.00 65.00 27.00 0.065 71.00 0.240 415.38 0.48 3/4'' 0.00029 0.743
CRP-T7 N03 E 1345.00 1318.00 105.00 27.00 0.105 109.00 0.240 257.14 0.53 3/4'' 0.00029 0.589
E CRP-T7 N04 1318.00 1285.00 115.00 33.00 0.115 120.00 0.120 286.96 0.40 3/4'' 0.00029 0.623
CRP-T7 N04 CASA12 1285.00 1265.00 65.00 20.00 0.065 68.00 0.120 307.69 0.39 1/2'' 0.00013 0.223
E CASA13 1318.00 1316.00 5.00 2.00 0.005 6.00 0.120 400.00 0.37 1/2'' 0.00013 0.238

22
ORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

4.00 0.20 0.05 1410.00 1409.95 14.95

23
Vel. tub Prd. carg. Cota piezo Cota piezo Presin
lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

2.38 0.95 0.58 1395.00 1394.42 2.42


1.36 0.84 5.51 1392.00 1386.49 8.91
0.64 0.53 3.93 1380.00 1376.07 9.99
0.59 0.42 1.82 1375.00 1373.18 11.17
1.67 0.42 0.07 1372.00 1371.93 12.09
1.33 0.42 2.32 1372.00 1369.68 25.85

2.24 0.95 7.65 1392.00 1384.35 31.76

3.02 1.26 6.86 1380.00 1373.14 37.05


2.18 1.26 8.00 1345.00 1337.00 49.05
2.18 0.84 5.67 1325.00 1319.33 24.33
2.64 0.95 0.55 1295.00 1294.45 28.79
0.70 0.95 6.01 1295.00 1288.99 21.32
1.29 0.95 0.55 1345.00 1344.45 37.50

1.56 0.42 2.99 1375.00 1372.01 37.00


2.07 0.42 1.35 1345.00 1343.65 21.65

2.61 0.84 3.51 1372.00 1368.49 34.66


2.07 0.84 5.67 1345.00 1339.33 21.33
2.19 0.42 1.72 1318.00 1316.28 52.61
1.76 0.95 7.11 1285.00 1277.89 12.89
1.88 0.95 0.55 1318.00 1317.45 22.79

24
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE DEL SUB SISTEMA N03

NOMBRE DE PROYECTO: INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, P
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

A POBLACION ACTUAL 10 FAM


INTEGRANTES POR FAMILIA 5 HAB
POBLACION ACTUAL 50 HAB
B TASA DE CRECIMIENTO (%) 0.11 %
C PERIODO DE DISEO 20 AOS
D POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 51 HAB
E DOTACION LT/HAB/DIA 130 Lt/hab/dia
PORCENTAJE DE DESPERDICIO 20 %
F CONSUMO PROMEDIO ANUAL Qp= (Pob. x Dot./86,400)/(1 - %PF) 0.096 LT/SEG
G CONSUMO MAXIMO DIARIO Qmd = 1.30 x Qp 0.125 LT/SEG
H TIPO DE FUENTE MANANTE
TIPO DE MANANTE LADERA
NUMERO DE MANANTES 1 mant
CAUDAL DE LA FUENTE CAPTACION N01 Lt/Seg 5.520 LT/SEG
CAUDAL DE LA FUENTE MANANTE CAPTACION N02 Lt/Seg 0.000 LT/SEG
CAUDAL TOTAL DE LA FUENTES A USAR Lt/Seg 5.520 LT/SEG
I VOL DE RESERVORIO(M3) V = 0.25 x Qp x 86400/1000 2.08 M3
A UTILIZAR 2.50 M3
J CONSUMO MAXIMO HORARIO Qmh = 2.50 x Qp 0.24 LT/SEG

HAZZEN WILLIAMS Q=0.0004264*C*D^2.64*hf^0.54 C=150 PARA PVC

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE CONDUCCION
CDC - N03 RESEV-N03 1280.00 1230.00 250.00 50.00 0.250 255.00 0.150 200.00 0.47 1 '' 0.00051 1.107

25
Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE DISTRIBUCION SUBSISTEMA 02 0.120

RESEV-N03 A 1230.00 1222.00 40.00 8.00 0.040 41.00 1.320 200.00 1.06 1 1/2'' 0.00114 3.206
A B 1222.00 1200.00 60.00 22.00 0.060 64.00 1.200 366.67 0.91 1 1/2'' 0.00114 4.353
B CRP-T7 N05 1200.00 1193.00 50.00 7.00 0.050 51.00 1.080 140.00 1.06 1 1/2'' 0.00114 2.651
CRP-T7 N05 C 1193.00 1184.00 30.00 9.00 0.030 32.00 1.080 300.00 0.91 1 1/2'' 0.00114 3.906
C D 1184.00 1182.00 30.00 2.00 0.030 31.00 0.720 66.67 1.06 1 1/2'' 0.00114 1.764
D E 1182.00 1177.00 45.00 5.00 0.045 46.00 0.600 111.11 0.89 1 1/2'' 0.00114 2.338
E F 1177.00 1173.00 15.00 4.00 0.015 16.00 0.480 266.67 0.69 1 '' 0.00051 1.262
F G 1173.00 1172.00 35.00 1.00 0.035 36.00 0.360 28.57 0.97 1 '' 0.00051 0.385
G H 1172.00 1170.00 15.00 2.00 0.015 16.00 0.240 133.33 0.61 1 '' 0.00051 0.868
H CASA23 1170.00 1158.00 65.00 12.00 0.065 67.00 0.120 184.62 0.44 1/2'' 0.00013 0.170

C C1 1184.00 1162.00 135.00 22.00 0.135 137.00 0.240 162.96 0.58 3/4'' 0.00029 0.466
C1 CRP-T7 N06 1162.00 1160.00 25.00 2.00 0.025 26.00 0.240 80.00 0.67 3/4'' 0.00029 0.313
CRP-T7 N06 C2 1160.00 1145.00 110.00 15.00 0.110 112.00 0.120 136.36 0.47 3/4'' 0.00029 0.423
C2 CASA25 1145.00 1144.00 5.00 1.00 0.005 6.00 0.120 200.00 0.43 1/2'' 0.00013 0.164
C2 CASA24 1145.00 1141.00 30.00 4.00 0.030 31.00 0.120 133.33 0.47 1/2'' 0.00013 0.143
C1 CASA26 1162.00 1161.00 5.00 1.00 0.005 6.00 0.120 200.00 0.43 1/2'' 0.00013 0.164

A CASA16 1222.00 1217.00 70.00 5.00 0.070 71.00 0.120 71.43 0.53 3/4'' 0.00029 0.299
B CASA17 1200.00 1197.00 150.00 3.00 0.150 151.00 0.120 20.00 0.69 3/4'' 0.00029 0.151
D CASA18 1182.00 1181.00 20.00 1.00 0.020 21.00 0.120 50.00 0.57 3/4'' 0.00029 0.242
E CASA19 1177.00 1176.00 20.00 1.00 0.020 21.00 0.120 50.00 0.57 3/4'' 0.00029 0.242
F CASA20 1173.00 1172.00 15.00 1.00 0.015 16.00 0.120 66.67 0.54 1/2'' 0.00013 0.096
G CASA21 1172.00 1167.00 25.00 5.00 0.025 26.00 0.120 200.00 0.43 1/2'' 0.00013 0.177
H CASA22 1170.00 1166.00 25.00 4.00 0.025 26.00 0.120 160.00 0.45 1/2'' 0.00013 0.157

26
ORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

2.18 0.30 1.38 1280.00 1278.62 48.62

27
Vel. tub Prd. carg. Cota piezo Cota piezo Presin
lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

2.81 1.16 1.69 1230.00 1228.31 6.31


3.82 1.05 2.13 1222.00 1219.87 26.18
2.33 0.95 1.46 1200.00 1198.54 31.73
3.43 0.95 0.87 1193.00 1192.13 8.13
1.55 0.63 0.41 1184.00 1183.59 9.71
2.05 0.53 0.44 1182.00 1181.56 14.27
2.49 0.95 0.71 1177.00 1176.29 17.56
0.76 0.71 0.98 1173.00 1172.02 17.58
1.71 0.47 0.20 1172.00 1171.80 19.39
1.34 0.95 7.11 1170.00 1162.89 24.28

1.64 0.84 7.29 1184.00 1176.71 22.84


1.10 0.84 1.35 1162.00 1160.65 23.49
1.48 0.42 1.64 1160.00 1158.36 13.36
1.29 0.95 0.55 1145.00 1144.45 13.81
1.13 0.95 3.28 1145.00 1141.72 14.07
1.29 0.95 0.55 1162.00 1161.45 23.29

1.05 0.42 1.05 1222.00 1220.95 10.26


0.53 0.42 2.24 1200.00 1197.76 26.94
0.85 0.42 0.30 1182.00 1181.70 10.41
0.85 0.42 0.30 1177.00 1176.70 14.97
0.76 0.95 1.64 1173.00 1171.36 16.92
1.40 0.95 2.73 1172.00 1169.27 19.85
1.24 0.95 2.73 1170.00 1167.27 20.65

28
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE DEL SUB SISTEMA N04

NOMBRE DE PROYECTO: INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, P
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

A POBLACION ACTUAL 13 FAM


INTEGRANTES POR FAMILIA 5 HAB
POBLACION ACTUAL 65 HAB
B TASA DE CRECIMIENTO (%) 0.11 %
C PERIODO DE DISEO 20 AOS
D POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 66 HAB
E DOTACION LT/HAB/DIA 130 Lt/hab/dia
PORCENTAJE DE DESPERDICIO 20 %
F CONSUMO PROMEDIO ANUAL Qp= (Pob. x Dot./86,400)/(1 - %PF) 0.125 LT/SEG
G CONSUMO MAXIMO DIARIO Qmd = 1.30 x Qp 0.162 LT/SEG
H TIPO DE FUENTE MANANTE
TIPO DE MANANTE LADERA
NUMERO DE MANANTES 1 mant
CAUDAL DE LA FUENTE CAPTACION N01 Lt/Seg 5.520 LT/SEG
CAUDAL DE LA FUENTE MANANTE CAPTACION N030 Lt/Seg 0.000 LT/SEG
CAUDAL TOTAL DE LA FUENTES A USAR Lt/Seg 5.520 LT/SEG
I VOL DE RESERVORIO(M3) V = 0.25 x Qp x 86400/1000 2.70 M3
A UTILIZAR 3.00 M3
J CONSUMO MAXIMO HORARIO Qmh = 2.50 x Qp 0.31 LT/SEG

HAZZEN WILLIAMS Q=0.0004264*C*D^2.64*hf^0.54 C=150 PARA PVC

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE CONDUCCION SUB SISTEMA 06
CDC - N03 RESEV-N04 1280.00 1250.00 805.00 30.00 0.805 806.00 0.150 37.27 0.66 1 '' 0.00051 0.451

29
Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE DISTRIBUCION SUBSISTEMA 06 0.12

RESEV-N04 A 1250.00 1248.00 5.00 2.00 0.005 6.00 1.800 400.00 1.04 2 '' 0.00203 9.123
A B 1248.00 1242.00 60.00 6.00 0.060 61.00 1.680 100.00 1.34 2 '' 0.00203 4.720
B C 1242.00 1225.00 40.00 17.00 0.040 44.00 1.560 425.00 0.97 2 '' 0.00203 9.881
C CRP-T7 N07 1225.00 1180.00 85.00 45.00 0.085 97.00 1.320 529.41 0.87 1 1/2'' 0.00114 5.118
CRP-T7 N07 D 1180.00 1160.00 40.00 20.00 0.040 45.00 1.200 500.00 0.85 1 1/2'' 0.00114 5.001
D E 1160.00 1147.00 55.00 13.00 0.055 57.00 1.080 236.36 0.95 1 1/2'' 0.00114 3.488
E CRP-T7 N08 1147.00 1120.00 65.00 27.00 0.065 71.00 0.960 415.38 0.81 1 1/2'' 0.00114 4.597
CRP-T7 N08 F 1120.00 1110.00 25.00 10.00 0.025 27.00 0.960 400.00 0.82 1 1/2'' 0.00114 4.532
F CRP-T7 N09 1110.00 1070.00 85.00 40.00 0.085 94.00 0.600 470.59 0.66 1 '' 0.00051 1.682
CRP-T7 N09 G 1070.00 1048.00 45.00 22.00 0.045 51.00 0.480 488.89 0.61 1 '' 0.00051 1.694
G J 1048.00 1040.00 45.00 8.00 0.045 46.00 0.480 177.78 0.74 1 '' 0.00051 1.037

J H 1040.00 1039.00 220.00 1.00 0.220 220.00 0.240 4.55 1.21 3/4'' 0.00029 0.068
H CASA39 1039.00 1037.00 55.00 2.00 0.055 56.00 0.120 36.36 0.61 3/4'' 0.00029 0.207
H CASA38 1039.00 1035.00 55.00 4.00 0.055 56.00 0.120 72.73 0.53 3/4'' 0.00029 0.301

J CRP-T7 N10 1040.00 1015.00 85.00 25.00 0.085 89.00 0.240 294.12 0.52 3/4'' 0.00029 0.631
CRP-T7 N10 I 1015.00 1000.00 70.00 15.00 0.070 72.00 0.240 214.29 0.55 3/4'' 0.00029 0.537
I CASA33 1000.00 998.00 25.00 2.00 0.025 26.00 0.120 80.00 0.52 1/2'' 0.00013 0.108
I CASA34 1000.00 995.00 25.00 5.00 0.025 26.00 0.120 200.00 0.43 1/2'' 0.00013 0.177

F CRP-T7 N11 1110.00 1055.00 480.00 55.00 0.480 484.00 0.360 114.58 0.73 1 '' 0.00051 0.824
CRP-T7 N11 F1 1055.00 1045.00 65.00 10.00 0.065 66.00 0.360 153.85 0.69 1 '' 0.00051 0.963
F1 F2 1055.00 1038.00 345.00 17.00 0.345 346.00 0.240 49.28 0.74 1 '' 0.00051 0.524
F2 CASA36 1038.00 1030.00 45.00 8.00 0.045 46.00 0.120 177.78 0.44 1/2'' 0.00013 0.168
F2 CRP-T7 N12 1038.00 1012.00 60.00 26.00 0.060 66.00 0.240 433.33 0.48 3/4'' 0.00029 0.757
CRP-T7 N07 CASA37 1012.00 995.00 60.00 17.00 0.060 63.00 0.120 283.33 0.40 1/2'' 0.00013 0.212
F1 CASA35 1055.00 1052.00 5.00 3.00 0.005 6.00 0.120 600.00 0.34 1/2'' 0.00013 0.296

A CASA27 1248.00 1220.00 120.00 28.00 0.120 124.00 0.120 233.33 0.42 1/2'' 0.00013 0.193
B CASA28 1242.00 1240.00 10.00 2.00 0.010 11.00 0.120 200.00 0.43 1/2'' 0.00013 0.172
C CASA29 1225.00 1223.00 20.00 2.00 0.020 21.00 0.120 100.00 0.50 1/2'' 0.00013 0.121

30
Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
D CASA30 1160.00 1155.00 15.00 5.00 0.015 16.00 0.120 333.33 0.39 1/2'' 0.00013 0.230
E CASA31 1147.00 1142.00 20.00 5.00 0.020 21.00 0.120 250.00 0.41 1/2'' 0.00013 0.199
F CASA32 1110.00 1105.00 15.00 5.00 0.015 16.00 0.120 333.33 0.39 1/2'' 0.00013 0.230

31
TORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

0.89 0.30 4.43 1280.00 1275.57 25.57

32
Vel. tub Prd. carg. Cota piezo Cota piezo Presin
lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

4.50 0.89 0.09 1250.00 1249.91 1.91


2.33 0.83 0.97 1248.00 1247.03 6.94
4.87 0.77 0.56 1242.00 1241.44 23.38
4.49 1.16 3.59 1225.00 1221.41 64.79
4.39 1.05 1.42 1180.00 1178.58 18.58
3.06 0.95 1.60 1160.00 1158.40 29.98
4.03 0.84 1.52 1147.00 1145.48 55.46
3.98 0.84 0.59 1120.00 1119.41 9.41
3.32 1.18 6.10 1110.00 1103.90 43.31
3.34 0.95 2.14 1070.00 1067.86 19.86
2.05 0.95 2.14 1048.00 1045.86 25.73

0.24 0.84 11.87 1040.00 1028.13 14.85


0.73 0.42 0.82 1039.00 1038.18 16.03
1.06 0.42 0.82 1039.00 1038.18 19.21

2.21 0.84 4.59 1040.00 1035.41 46.14


1.88 0.84 3.78 1015.00 1011.22 11.22
0.85 0.95 2.73 1000.00 997.27 10.49
1.40 0.95 2.73 1000.00 997.27 13.49

1.63 0.71 13.38 1110.00 1096.62 51.04


1.90 0.71 1.81 1055.00 1053.19 8.19
1.03 0.47 4.54 1055.00 1050.46 20.65
1.32 0.95 4.92 1038.00 1033.08 23.73
2.66 0.84 3.24 1038.00 1034.76 43.41
1.68 0.95 6.56 1012.00 1005.44 10.44
2.34 0.95 0.55 1055.00 1054.45 10.64

1.52 0.95 13.12 1248.00 1234.88 16.79


1.35 0.95 1.09 1242.00 1240.91 7.85
0.96 0.95 2.19 1225.00 1222.81 23.19

33
Vel. tub Prd. carg. Cota piezo Cota piezo Presin
lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)
1.82 0.95 1.64 1160.00 1158.36 21.94
1.57 0.95 2.19 1147.00 1144.81 32.79
1.82 0.95 1.64 1110.00 1108.36 12.77

34
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE

NOMBRE DE PROYECTO: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real PEND Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/m) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE CONDUCCION
CAPT -N01 CR-01 1300.00 1290.00 150.00 10.00 0.150 151.00 0.400 66.67 0.87 1 1/2'' 0.00114 1.670
CAPT- N02 O 1330.00 1319.00 50.00 11.00 0.050 52.00 0.400 220.00 0.68 1 '' 0.00051 1.076
O CR-01 1330.00 1290.00 220.00 40.00 0.220 224.00 0.400 181.82 0.71 1 '' 0.00051 0.982

CR-01 RESEV-N01 1290.00 1267.00 450.00 23.00 0.450 451.00 0.700 51.11 1.14 1 1/2'' 0.00114 1.450

O BD-01 1330.00 1317.00 10.00 13.00 0.010 17.00 0.150 1300.00 0.33 3/4'' 0.00029 1.011

CAPT- N02 CAPT -N03 1330.00 1298.00 390.00 32.00 0.390 392.00 0.600 82.05 0.97 1 1/2'' 0.00114 1.869
CAPT -N03 CDC-N01 1298.00 1292.00 95.00 6.00 0.095 96.00 0.700 63.16 1.09 1 1/2'' 0.00114 1.618
CDC-N01 RES-N02 (Existe 1292.00 1288.00 50.00 4.00 0.050 51.00 0.350 80.00 0.80 1 '' 0.00051 0.630

CDC-N01 CRP-T6-N01 1292.00 1230.00 270.00 62.00 0.270 278.00 0.350 229.63 0.64 1 '' 0.00051 1.107
CRP-T6-N01 CDC-N02 1230.00 1178.00 320.00 52.00 0.320 325.00 0.350 162.50 0.69 1 '' 0.00051 0.925
CDC-N02 RESEV-N03 1178.00 1142.00 100.00 36.00 0.100 107.00 0.350 360.00 0.59 1 '' 0.00051 1.383

CDC-N02 CRP-T6-N02 1178.00 1115.00 195.00 63.00 0.195 205.00 0.350 323.08 0.60 1 '' 0.00051 1.317
CRP-T6-N02 RES-N04 1115.00 1072.00 320.00 43.00 0.320 323.00 0.350 134.38 0.72 1 '' 0.00051 0.838

CAPT -N03 RES-N05 1298.00 1262.00 565.00 36.00 0.565 567.00 0.350 63.72 0.84 1 '' 0.00051 0.562

CAPT-N04 BD-N02 1090.00 1075.00 25.00 15.00 0.025 30.00 0.100 600.00 0.33 3/4'' 0.00029 0.804
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE

NOMBRE DE PROYECTO: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real PEND Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/m) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE DISTRIBUCION

CAPT -N01 CASA01 1300.00 1288.00 460.00 12.00 0.460 461.00 0.120 26.09 0.67 3/4'' 0.00029 0.163
LINEA DE DISTRIBUCION
RESEV-N01 A 1267.00 1263.00 30.00 4.00 0.030 31.00 2.700 133.33 1.55 2 '' 0.00203 5.101
A B 1263.00 1237.00 170.00 26.00 0.170 172.00 2.550 152.94 1.48 2 '' 0.00203 5.556
B C 1237.00 1219.00 140.00 18.00 0.140 142.00 2.400 128.57 1.50 2 '' 0.00203 5.052
C C4 1219.00 1216.00 90.00 3.00 0.090 91.00 1.800 33.33 1.77 2 '' 0.00203 2.441
C4 D 1216.00 1214.00 40.00 2.00 0.040 41.00 1.500 50.00 1.52 2 '' 0.00203 3.016
D Reduc 2" a 1.1/2" 1214.00 1210.00 70.00 4.00 0.070 71.00 1.500 57.14 1.48 1 1/2'' 0.00114 1.530
Reduc 2" a 1.1/2"E 1210.00 1203.00 150.00 7.00 0.150 151.00 1.500 46.67 1.54 1 1/2'' 0.00114 1.377
E F 1210.00 1202.00 70.00 8.00 0.070 71.00 1.350 114.29 1.24 1 1/2'' 0.00114 2.225
F Reduc 1.1/2" a 1" 1202.00 1198.50 180.00 3.50 0.180 181.00 1.200 19.44 1.69 1 1/2'' 0.00114 0.859
Reduc 1.1/2" a 1"G 1198.50 1198.00 70.00 0.50 0.070 70.00 1.200 7.14 2.08 1 '' 0.00051 0.173
G H 1198.00 1197.50 10.00 0.50 0.010 11.00 0.900 50.00 1.25 1 '' 0.00051 0.469
H I 1197.50 1197.00 20.00 0.50 0.020 20.00 0.750 25.00 1.35 1 '' 0.00051 0.340
I J 1197.00 1196.50 20.00 0.50 0.020 20.00 0.600 25.00 1.24 1 '' 0.00051 0.340
J K 1196.50 1196.00 30.00 0.50 0.030 30.00 0.450 16.67 1.21 1 '' 0.00051 0.273
K CRP-T7-N04 1196.00 1195.50 40.00 0.50 0.040 40.00 0.450 12.50 1.28 3/4'' 0.00029 0.110
CRP-T7-N04 L 1195.50 1170.00 75.00 25.50 0.075 80.00 0.300 340.00 0.56 1 '' 0.00051 1.343
L CASA 50 1170.00 1157.00 35.00 13.00 0.035 38.00 0.150 371.43 0.42 3/4'' 0.00029 0.655
A CASA02 1263.00 1258.00 15.00 5.00 0.015 16.00 0.150 333.33 0.43 3/4'' 0.00029 0.623
B CRP-T7 N01 1237.00 1220.00 55.00 17.00 0.055 58.00 0.150 309.09 0.44 3/4'' 0.00029 0.602
CRP-T7 N01 CASA03 1220.00 1204.00 45.00 16.00 0.045 48.00 0.150 355.56 0.43 3/4'' 0.00029 0.646
C C1 1219.00 1213.00 50.00 6.00 0.050 51.00 0.150 120.00 0.53 1 '' 0.00051 0.784
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE

NOMBRE DE PROYECTO: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real PEND Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/m) (Pulg) (Pulg) (m2) (Lt/seg)
C1 CRP-T7-N02 1213.00 1210.00 10.00 3.00 0.010 11.00 0.150 300.00 0.44 1 '' 0.00051 1.234
CRP-T7-N02 C2 1210.00 1195.00 50.00 15.00 0.050 53.00 0.150 300.00 0.44 1 '' 0.00051 1.259
C2 CRP-T7-N03 1195.00 1175.00 90.00 20.00 0.090 93.00 0.150 222.22 0.47 1 '' 0.00051 1.086
CRP-T7-N03 C3 1175.00 1152.00 105.00 23.00 0.105 108.00 0.150 219.05 0.47 1 '' 0.00051 1.080
C3 CASA06 1152.00 1149.00 25.00 3.00 0.025 26.00 0.150 120.00 0.53 3/4'' 0.00029 0.364
C3 CASA07 1152.00 1150.00 25.00 2.00 0.025 26.00 0.150 80.00 0.58 3/4'' 0.00029 0.292
C1 CASA04 1213.00 1211.00 15.00 2.00 0.015 16.00 0.150 133.33 0.52 1/2'' 0.00013 0.131
C2 CASA05 1195.00 1193.00 20.00 2.00 0.020 21.00 0.150 100.00 0.55 1/2'' 0.00013 0.113
D CASA08 1214.00 1212.00 35.00 2.00 0.035 36.00 0.150 57.14 0.62 3/4'' 0.00029 0.245
E CASA09 1210.00 1230.00 50.00 20.00 0.050 54.00 0.150 400.00 0.42 3/4'' 0.00029 0.683
F CASA10 1202.00 1210.00 25.00 8.00 0.025 27.00 0.150 320.00 0.44 1/2'' 0.00013 0.209
G CRP-T7-N03 1198.00 1190.00 60.00 8.00 0.060 61.00 0.300 133.33 0.68 3/4'' 0.00029 0.390
CRP-T7-N03 G1 1197.50 1179.00 50.00 18.50 0.050 54.00 0.300 370.00 0.55 3/4'' 0.00029 0.655
G1 CASA11 1190.00 1178.00 20.00 12.00 0.020 24.00 0.150 600.00 0.38 1/2'' 0.00013 0.277
G1 CASA12 1190.00 1175.00 15.00 15.00 0.015 22.00 0.150 1000.00 0.35 1/2'' 0.00013 0.327
H CASA49 1197.50 1195.50 12.00 2.00 0.012 13.00 0.150 166.67 0.50 1/2'' 0.00013 0.146
I TELEFONICA 1197.00 1195.00 12.00 2.00 0.012 13.00 0.150 166.67 0.50 3/4'' 0.00029 0.425
J CASA13 1196.50 1200.00 12.00 3.50 0.012 13.00 0.150 291.67 0.45 3/4'' 0.00029 0.575
K CASA14 1196.00 1200.00 12.00 4.00 0.012 13.00 0.150 333.33 0.43 3/4'' 0.00029 0.618
L CASA15 1170.00 1168.00 12.00 2.00 0.012 13.00 0.150 166.67 0.50 3/4'' 0.00029 0.425
LINEA DE DISTRIBUCION
BD-01 A 1317.00 1310.00 30.00 7.00 0.030 31.00 0.300 233.33 0.61 3/4'' 0.00029 0.523
A CASA17 1310.00 1288.00 165.00 22.00 0.165 167.00 0.150 133.33 0.52 3/4'' 0.00029 0.391
A CASA16 1310.00 1308.00 60.00 2.00 0.060 61.00 0.150 33.33 0.69 3/4'' 0.00029 0.185
LINEA DE DISTRIBUCION
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE

NOMBRE DE PROYECTO: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real PEND Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/m) (Pulg) (Pulg) (m2) (Lt/seg)
RES-N02 (ExisteA 1288.00 1286.00 5.00 2.00 0.005 6.00 1.200 400.00 0.92 1 '' 0.00051 1.376
A B 1286.00 1242.00 205.00 44.00 0.205 210.00 0.900 214.63 0.93 1 '' 0.00051 1.071
B C 1242.00 1231.00 20.00 11.00 0.020 23.00 0.600 550.00 0.66 1 '' 0.00051 1.672
C D 1231.00 1225.00 40.00 6.00 0.040 41.00 0.450 150.00 0.77 1 '' 0.00051 0.882
D E 1225.00 1200.00 255.00 25.00 0.255 257.00 0.300 98.04 0.72 3/4'' 0.00029 0.332
E F 1200.00 1199.00 20.00 1.00 0.020 21.00 0.300 50.00 0.83 3/4'' 0.00029 0.226
F CASA24-SALON 1199.00 1193.00 55.00 6.00 0.055 56.00 0.150 109.09 0.54 1/2'' 0.00013 0.120
A CASA18 1286.00 1277.00 12.00 9.00 0.012 15.00 0.150 750.00 0.37 3/4'' 0.00029 0.887
A CASA19 1286.00 1258.00 25.00 28.00 0.025 38.00 0.150 1120.00 0.34 1/2'' 0.00013 0.341
B CASA20 1242.00 1240.00 10.00 2.00 0.010 11.00 0.150 200.00 0.48 1/2'' 0.00013 0.160
B CASA21 1242.00 1238.00 25.00 4.00 0.025 26.00 0.150 160.00 0.50 1/2'' 0.00013 0.146
C CASA22 1231.00 1227.00 35.00 4.00 0.035 36.00 0.150 114.29 0.54 1/2'' 0.00013 0.123
D CASA23 1225.00 1221.00 12.00 4.00 0.012 13.00 0.150 333.33 0.43 1/2'' 0.00013 0.213
E CASA47 1200.00 1190.00 65.00 10.00 0.065 66.00 0.150 153.85 0.51 1/2'' 0.00013 0.145
F CASA48 1199.00 1197.00 12.00 2.00 0.012 13.00 0.150 166.67 0.50 1/2'' 0.00013 0.146
LINEA DE DISTRIBUCION
RESEV-N03 A 1142.00 1128.00 40.00 14.00 0.040 43.00 1.200 350.00 0.94 1 1/2'' 0.00114 3.945
A B 1128.00 1126.00 85.00 2.00 0.085 86.00 1.050 23.53 1.55 1 1/2'' 0.00114 0.949
B C 1126.00 1124.00 48.00 2.00 0.048 49.00 0.900 41.67 1.30 1 1/2'' 0.00114 1.286
C D 1124.00 1112.00 300.00 12.00 0.300 301.00 0.900 40.00 1.31 1 1/2'' 0.00114 1.269
D E 1112.00 1097.00 180.00 15.00 0.180 181.00 0.750 83.33 1.06 1 1/2'' 0.00114 1.885
E F 1097.00 1096.00 50.00 1.00 0.050 50.00 0.600 20.00 1.30 1 1/2'' 0.00114 0.875
F CRPT-7 1096.00 1071.00 255.00 25.00 0.255 257.00 0.450 98.04 0.84 1 '' 0.00051 0.707
CRPT-7 G 1071.00 1066.00 80.00 5.00 0.080 81.00 0.450 62.50 0.92 1 '' 0.00051 0.553
G H 1066.00 1057.00 90.00 9.00 0.090 91.00 0.300 100.00 0.72 3/4'' 0.00029 0.335
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE

NOMBRE DE PROYECTO: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real PEND Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/m) (Pulg) (Pulg) (m2) (Lt/seg)
H CASA31 1071.00 1047.00 50.00 24.00 0.050 56.00 0.300 480.00 0.52 3/4'' 0.00029 0.739
A CASA25 1128.00 1122.00 40.00 6.00 0.040 41.00 0.150 150.00 0.51 3/4'' 0.00029 0.414
C CASA26 1124.00 1114.00 42.00 10.00 0.042 44.00 0.150 238.10 0.46 3/4'' 0.00029 0.525
D CASA27 1112.00 1105.00 25.00 7.00 0.025 26.00 0.150 280.00 0.45 3/4'' 0.00029 0.575
E CASA28 1097.00 1090.00 25.00 7.00 0.025 26.00 0.150 280.00 0.45 3/4'' 0.00029 0.575
F CASA29 1096.00 1085.00 30.00 11.00 0.030 32.00 0.150 366.67 0.43 3/4'' 0.00029 0.656
H CASA30 1071.00 1057.50 12.00 13.50 0.012 19.00 0.150 1125.00 0.34 3/4'' 0.00029 0.971
G CRP-T7-N03 1066.00 1045.00 35.00 21.00 0.035 41.00 0.300 600.00 0.50 3/4'' 0.00029 0.814
CRP-T7-N03 CASA51 1045.00 1022.00 45.00 23.00 0.045 51.00 0.300 511.11 0.52 3/4'' 0.00029 0.760
LINEA DE DISTRIBUCION
RES-N04 A 1072.00 1065.00 25.00 7.00 0.025 26.00 1.400 280.00 1.04 1 1/2'' 0.00114 3.561
A B 1065.00 1063.00 60.00 2.00 0.060 61.00 0.600 33.33 1.17 1 1/2'' 0.00114 1.142
B C 1063.00 1058.00 35.00 5.00 0.035 36.00 0.450 142.86 0.78 1 '' 0.00051 0.857
C D 1058.00 1039.00 110.00 19.00 0.110 112.00 0.300 172.73 0.64 1 '' 0.00051 0.955
D CASA37 1039.00 1024.00 120.00 15.00 0.120 121.00 0.150 125.00 0.53 1/2'' 0.00013 0.130
D CASA36 1039.00 1038.00 10.00 1.00 0.010 11.00 0.150 100.00 0.55 1/2'' 0.00013 0.110
B CASA34 1063.00 1059.00 18.00 4.00 0.018 19.00 0.150 222.22 0.47 3/4'' 0.00029 0.504
C CASA35 1058.00 1057.00 12.00 1.00 0.012 13.00 0.150 83.33 0.57 3/4'' 0.00029 0.292
A R 1065.00 1051.00 100.00 14.00 0.100 101.00 0.450 140.00 0.78 1 '' 0.00051 0.856
R E 1051.00 1050.00 70.00 1.00 0.070 70.00 0.300 14.29 1.07 3/4'' 0.00029 0.118
E F 1050.00 1048.00 45.00 2.00 0.045 46.00 0.300 44.44 0.85 3/4'' 0.00029 0.215
F CASA32 1048.00 1043.00 30.00 5.00 0.030 31.00 0.150 166.67 0.50 3/4'' 0.00029 0.436
F CASA33 1048.00 1041.00 60.00 7.00 0.060 61.00 0.150 116.67 0.54 3/4'' 0.00029 0.363
F CASA54 1051.00 1050.00 20.00 1.00 0.020 21.00 0.150 50.00 0.64 3/4'' 0.00029 0.226
LINEA DE DISTRIBUCION
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE

NOMBRE DE PROYECTO: MEJORAMIENTO, AMPLIACION DE LOS SERVICIOS DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real PEND Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/m) (Pulg) (Pulg) (m2) (Lt/seg)
RES-N05 A 1262.00 1259.00 12.00 3.00 0.012 13.00 1.050 250.00 0.96 1 1/2'' 0.00114 3.276
A B 1259.00 1234.00 155.00 25.00 0.155 157.00 0.900 161.29 0.99 1 1/2'' 0.00114 2.681
B C 1234.00 1232.00 50.00 2.00 0.050 51.00 0.750 40.00 1.23 1 '' 0.00051 0.433
C CRP-T7-N01 1232.00 1197.00 115.00 35.00 0.115 121.00 0.450 304.35 0.67 1 '' 0.00051 1.274
CRP-T7-N01 CRP-T7-N02 1197.00 1140.00 120.00 57.00 0.120 133.00 0.450 475.00 0.61 1 '' 0.00051 1.576
CRP-T7-N02 D 1140.00 1111.00 170.00 29.00 0.170 173.00 0.450 170.59 0.75 1 '' 0.00051 0.949
D CASA43 1111.00 1110.50 12.00 0.50 0.012 13.00 0.150 41.67 0.66 3/4'' 0.00029 0.201
D CASA42 1111.00 1110.00 12.00 1.00 0.012 13.00 0.150 83.33 0.57 3/4'' 0.00029 0.292
D CASA41 1111.00 1107.00 16.00 4.00 0.016 17.00 0.150 250.00 0.46 3/4'' 0.00029 0.535
A CASA38 1259.00 1240.00 130.00 19.00 0.130 132.00 0.150 146.15 0.51 3/4'' 0.00029 0.410
B CASA39 1234.00 1222.00 25.00 12.00 0.025 28.00 0.150 480.00 0.40 1/2'' 0.00013 0.255
C CASA40 1232.00 1231.50 30.00 0.50 0.030 30.00 0.150 16.67 0.80 3/4'' 0.00029 0.128
C CASA46 1232.00 1235.00 30.00 3.00 0.030 31.00 0.150 100.00 0.55 3/4'' 0.00029 0.331
LINEA DE DISTRIBUCION
BD-N02 A 1075.00 1050.00 90.00 25.00 0.090 94.00 0.300 277.78 0.58 3/4'' 0.00029 0.571
A CASA44 1050.00 1048.00 22.00 2.00 0.022 23.00 0.150 90.91 0.56 1/2'' 0.00013 0.108
A CASA45 1050.00 1047.50 12.00 2.50 0.012 13.00 0.150 208.33 0.48 1/2'' 0.00013 0.165
RAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION - CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

1.46 0.35 0.69 1300.00 1299.31 9.31


2.12 0.79 1.69 1330.00 1328.31 9.31
1.94 0.79 7.45 1330.00 1322.55 32.55

1.27 0.61 5.87 1290.00 1284.13 17.13

3.55 0.53 0.23 1330.00 1329.77 22.08

1.64 0.53 3.83 1330.00 1326.17 28.17


1.42 0.61 1.24 1298.00 1296.76 4.76
1.24 0.69 1.32 1292.00 1290.68 2.68

2.19 0.69 7.14 1292.00 1284.86 54.86


1.83 0.69 8.46 1230.00 1221.54 43.54
2.73 0.69 2.65 1178.00 1175.35 33.35

2.60 0.69 5.16 1178.00 1172.84 57.84


1.65 0.69 8.46 1115.00 1106.54 34.54

1.11 0.69 14.95 1298.00 1283.05 21.05

2.82 0.35 0.27 1090.00 1089.73 14.73


RAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION - CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

0.57 0.42 6.88 1300.00 1293.12 5.12

2.52 1.33 1.16 1267.00 1265.84 2.84


2.74 1.26 5.93 1263.00 1257.07 22.91
2.49 1.18 4.36 1237.00 1232.64 36.55
1.20 0.89 1.65 1219.00 1217.35 37.90
1.49 0.74 0.52 1216.00 1215.48 39.38
1.34 1.32 3.75 1214.00 1210.25 39.63
1.21 1.32 8.03 1210.00 1201.97 38.60
1.95 1.18 3.08 1210.00 1206.92 43.52
0.75 1.05 6.38 1202.00 1195.62 40.64
0.34 2.37 18.13 1198.50 1180.37 23.01
0.93 1.78 1.52 1198.00 1196.48 21.99
0.67 1.48 2.17 1197.50 1195.33 20.32
0.67 1.18 1.44 1197.00 1195.56 19.38
0.54 0.89 1.26 1196.50 1195.24 18.62
0.38 1.58 6.91 1196.00 1189.09 12.20
2.65 0.59 1.49 1195.50 1194.01 24.01
2.30 0.53 0.79 1170.00 1169.21 36.22
2.19 0.53 0.34 1263.00 1262.66 7.50
2.11 0.53 1.24 1237.00 1235.76 38.67
2.26 0.53 1.02 1220.00 1218.98 14.98
1.55 0.30 0.28 1219.00 1218.72 42.27
RAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION - CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)
2.44 0.30 0.06 1213.00 1212.94 45.22
2.49 0.30 0.28 1210.00 1209.72 14.72
2.14 0.30 0.50 1195.00 1194.50 34.23
2.13 0.30 0.58 1175.00 1174.42 22.42
1.28 0.53 0.57 1152.00 1151.43 24.86
1.03 0.53 0.57 1152.00 1151.43 23.86
1.03 1.18 2.48 1213.00 1210.52 41.79
0.89 1.18 3.31 1195.00 1191.69 13.42
0.86 0.53 0.79 1214.00 1213.21 40.59
2.40 0.53 1.13 1210.00 1208.87 17.47
1.65 1.18 4.13 1202.00 1197.87 31.38
1.37 1.05 4.89 1198.00 1193.11 26.11
2.30 1.05 4.08 1197.50 1193.42 14.42
2.18 1.18 3.31 1190.00 1186.69 23.11
2.58 1.18 2.48 1190.00 1187.52 26.94
1.16 1.18 1.98 1197.50 1195.52 22.00
1.49 0.53 0.27 1197.00 1196.73 22.05
2.02 0.53 0.27 1196.50 1196.23 15.61
2.17 0.53 0.27 1196.00 1195.73 14.35
1.49 0.53 0.27 1170.00 1169.73 25.74

1.84 1.05 2.45 1317.00 1314.55 4.55


1.37 0.53 3.73 1310.00 1306.27 22.82
0.65 0.53 1.36 1310.00 1308.64 23.47
RAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION - CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)
2.71 2.37 1.30 1288.00 1286.70 0.70
2.11 1.78 31.17 1286.00 1254.83 13.53
3.30 1.18 1.44 1242.00 1240.56 23.10
1.74 0.89 1.69 1231.00 1229.31 27.41
1.16 1.05 20.80 1225.00 1204.20 31.61
0.79 1.05 1.63 1200.00 1198.37 30.98
0.95 1.18 9.09 1199.00 1189.91 27.88
3.11 0.53 0.27 1286.00 1285.73 9.43
2.69 1.18 4.13 1286.00 1281.87 24.57
1.26 1.18 1.65 1242.00 1240.35 13.88
1.16 1.18 4.13 1242.00 1237.87 13.40
0.97 1.18 5.79 1231.00 1225.21 21.31
1.68 1.18 1.98 1225.00 1223.02 29.43
1.15 1.18 10.74 1200.00 1189.26 30.86
1.16 1.18 1.98 1199.00 1197.02 30.99

3.46 1.05 1.42 1142.00 1140.58 12.58


0.83 0.92 2.35 1128.00 1125.65 12.23
1.13 0.79 1.00 1126.00 1125.00 13.23
1.11 0.79 6.24 1124.00 1117.76 19.00
1.65 0.66 2.67 1112.00 1109.33 12.33
0.77 0.53 0.49 1097.00 1096.51 12.84
1.40 0.89 10.74 1096.00 1085.26 14.26
1.09 0.89 3.37 1071.00 1067.63 1.63
1.18 1.05 7.34 1066.00 1058.66 3.29
RAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION - CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)
2.59 1.05 4.08 1071.00 1066.92 23.21
1.45 0.53 0.90 1128.00 1127.10 17.68
1.84 0.53 0.95 1124.00 1123.05 22.28
2.02 0.53 0.57 1112.00 1111.43 25.43
2.02 0.53 0.57 1097.00 1096.43 18.76
2.30 0.53 0.68 1096.00 1095.32 23.16
3.41 0.53 0.27 1071.00 1070.73 16.52
2.86 1.05 2.86 1066.00 1063.14 19.77
2.67 1.05 3.67 1045.00 1041.33 19.33

3.12 1.23 1.18 1072.00 1070.82 5.82


1.00 0.53 0.59 1065.00 1064.41 7.23
1.69 0.89 1.47 1063.00 1061.53 10.76
1.89 0.59 2.19 1058.00 1055.81 27.57
1.03 1.18 19.84 1039.00 1019.16 22.73
0.87 1.18 1.65 1039.00 1037.35 26.92
1.77 0.53 0.41 1063.00 1062.59 10.83
1.03 0.53 0.27 1058.00 1057.73 11.49
1.69 0.89 4.21 1065.00 1060.79 15.61
0.41 1.05 5.71 1051.00 1045.29 10.90
0.75 1.05 3.67 1050.00 1046.33 13.94
1.53 0.53 0.68 1048.00 1047.32 18.26
1.27 0.53 1.36 1048.00 1046.64 19.58
0.79 0.53 0.45 1051.00 1050.55 16.16
RAL EN LOS SECTORES DE ARANJUEZ PLAYA Y ANTENA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION - CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)
2.87 0.92 0.33 1262.00 1261.67 2.67
2.35 0.79 3.22 1259.00 1255.78 24.45
0.85 1.48 5.42 1234.00 1228.58 21.02
2.51 0.89 4.84 1232.00 1227.16 51.18
3.11 0.89 5.06 1197.00 1191.94 51.94
1.87 0.89 7.16 1140.00 1132.84 21.84
0.71 0.53 0.27 1111.00 1110.73 22.07
1.03 0.53 0.27 1111.00 1110.73 22.80
1.88 0.53 0.36 1111.00 1110.64 26.43
1.44 0.53 2.94 1259.00 1256.06 18.73
2.01 1.18 4.13 1234.00 1229.87 32.31
0.45 0.53 0.68 1232.00 1231.32 20.84
1.16 0.53 0.68 1232.00 1231.32 17.34

2.00 1.05 7.34 1075.00 1067.66 17.66


0.85 1.18 3.64 1050.00 1046.36 16.02
1.30 1.18 1.98 1050.00 1048.02 18.17
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE DEL SUB SISTEMA N05

NOMBRE DE PROYECTO: INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, P
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

A POBLACION ACTUAL 4 FAM


INTEGRANTES POR FAMILIA 5 HAB
POBLACION ACTUAL 20 HAB
B TASA DE CRECIMIENTO (%) 0.11 %
C PERIODO DE DISEO 20 AOS
D POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 20 HAB
E DOTACION LT/HAB/DIA 130 Lt/hab/dia
PORCENTAJE DE DESPERDICIO 20 %
F CONSUMO PROMEDIO ANUAL Qp= (Pob. x Dot./86,400)/(1 - %PF) 0.038 LT/SEG
G CONSUMO MAXIMO DIARIO Qmd = 1.30 x Qp 0.050 LT/SEG
H TIPO DE FUENTE MANANTE
TIPO DE MANANTE LADERA
NUMERO DE MANANTES 1 mant
CAUDAL DE LA FUENTE CAPTACION N01 Lt/Seg 5.520 LT/SEG
CAUDAL DE LA FUENTE MANANTE CAPTACION N02 Lt/Seg 0.000 LT/SEG
CAUDAL TOTAL DE LA FUENTES A USAR Lt/Seg 5.520 LT/SEG
I VOL DE RESERVORIO(M3) V = 0.25 x Qp x 86400/1000 0.83 M3
A UTILIZAR 1.00 M3
J CONSUMO MAXIMO HORARIO Qmh = 2.50 x Qp 0.10 LT/SEG

HAZZEN WILLIAMS Q=0.0004264*C*D^2.64*hf^0.54 C=150 PARA PVC

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE CONDUCCION SUB SISTEMA 05
CDC - N04 RESEV-N05 1390.00 1350.00 125.00 40.00 0.125 132.00 0.100 320.00 0.37 1 '' 0.00051 1.400

47
Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE DISTRIBUCION SUBSISTEMA 05 0.120

RESEV-N05 A 1350.00 1342.00 25.00 8.00 0.025 27.00 0.480 320.00 0.66 1 1/2'' 0.00114 4.017
A CRP-T7 N13 1342.00 1300.00 60.00 42.00 0.060 74.00 0.360 700.00 0.51 1 '' 0.00051 1.965
CRP-T7 N13 CRP-T7 N14 1300.00 1255.00 65.00 45.00 0.065 80.00 0.360 692.31 0.51 1 '' 0.00051 1.955
CRP-T7 N14 B 1255.00 1242.00 60.00 13.00 0.060 62.00 0.360 216.67 0.64 1 '' 0.00051 1.147
B C 1242.00 1240.00 80.00 2.00 0.080 81.00 0.240 25.00 0.85 3/4'' 0.00029 0.170
C CASA44 1240.00 1218.00 200.00 22.00 0.200 202.00 0.120 110.00 0.49 3/4'' 0.00029 0.378

A CASA41 1342.00 1338.00 25.00 4.00 0.025 26.00 0.120 160.00 0.45 1/2'' 0.00013 0.157
B CASA42 1242.00 1228.00 40.00 14.00 0.040 43.00 0.120 350.00 0.38 1/2'' 0.00013 0.235
C CASA43 1240.00 1238.00 5.00 2.00 0.005 6.00 0.120 400.00 0.37 1/2'' 0.00013 0.238

48
TORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

2.76 0.20 0.32 1390.00 1389.68 39.68

49
Vel. tub Prd. carg. Cota piezo Cota piezo Presin
lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

3.52 0.42 0.16 1350.00 1349.84 7.84


3.88 0.71 1.67 1342.00 1340.33 48.17
3.86 0.71 1.81 1300.00 1298.19 43.19
2.26 0.71 1.67 1255.00 1253.33 11.33
0.60 0.84 4.32 1242.00 1237.68 9.01
1.33 0.42 2.99 1240.00 1237.01 28.02

1.24 0.95 2.73 1342.00 1339.27 9.10


1.86 0.95 4.37 1242.00 1237.63 20.95
1.88 0.95 0.55 1240.00 1239.45 10.46

50
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE DEL SUB SISTEMA N06

NOMBRE DE PROYECTO: INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, P
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

A POBLACION ACTUAL 14 FAM


INTEGRANTES POR FAMILIA 5 HAB
POBLACION ACTUAL 70 HAB
B TASA DE CRECIMIENTO (%) 0.11 %
C PERIODO DE DISEO 20 AOS
D POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 72 HAB
E DOTACION LT/HAB/DIA 130 Lt/hab/dia
PORCENTAJE DE DESPERDICIO 20 %
F CONSUMO PROMEDIO ANUAL Qp= (Pob. x Dot./86,400)/(1 - %PF) 0.135 LT/SEG
G CONSUMO MAXIMO DIARIO Qmd = 1.30 x Qp 0.175 LT/SEG
H TIPO DE FUENTE MANANTE
TIPO DE MANANTE LADERA
NUMERO DE MANANTES 1 mant
CAUDAL DE LA FUENTE CAPTACION N01 Lt/Seg 5.520 LT/SEG
CAUDAL DE LA FUENTE MANANTE CAPTACION N030 Lt/Seg 0.000 LT/SEG
CAUDAL TOTAL DE LA FUENTES A USAR Lt/Seg 5.520 LT/SEG
I VOL DE RESERVORIO(M3) V = 0.25 x Qp x 86400/1000 2.91 M3
A UTILIZAR 3.00 M3
J CONSUMO MAXIMO HORARIO Qmh = 2.50 x Qp 0.34 LT/SEG

HAZZEN WILLIAMS Q=0.0004264*C*D^2.64*hf^0.54 C=150 PARA PVC

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE CONDUCCION SUB SISTEMA 06
CRP-T6 N07 RESEV-N06 1185.00 1135.00 265.00 50.00 0.265 270.00 0.200 188.68 0.53 1 '' 0.00051 1.073

51
Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE DISTRIBUCION SUBSISTEMA 06 0.12

RESEV-N06 A 1135.00 1133.00 5.00 2.00 0.005 6.00 1.680 400.00 1.01 1 1/2'' 0.00114 4.281
A B 1133.00 1130.00 25.00 3.00 0.025 26.00 0.600 120.00 0.88 1 1/2'' 0.00114 2.414
B C 1130.00 1122.00 30.00 8.00 0.030 32.00 0.480 266.67 0.69 1 1/2'' 0.00114 3.665
C CRP-T7 N15 1122.00 1105.00 115.00 17.00 0.115 117.00 0.360 147.83 0.69 1 '' 0.00051 0.941
CRP-T7 N15 D 1105.00 1092.00 30.00 13.00 0.030 33.00 0.360 433.33 0.56 1 '' 0.00051 1.613
D CRP-T7 N16 1092.00 1040.00 225.00 52.00 0.225 231.00 0.240 231.11 0.54 1 '' 0.00051 1.192
CRP-T7 N16 E 1040.00 1023.00 115.00 17.00 0.115 117.00 0.240 147.83 0.60 3/4'' 0.00029 0.442
E CASA51 1023.00 1015.00 30.00 8.00 0.030 32.00 0.120 266.67 0.41 1/2'' 0.00013 0.204
E CASA52 1023.00 1010.00 85.00 13.00 0.085 86.00 0.120 152.94 0.45 1/2'' 0.00013 0.155

A CASA46 1133.00 1122.00 35.00 11.00 0.035 37.00 0.120 314.29 0.39 3/4'' 0.00029 0.650
C CASA47 1122.00 1120.00 5.00 2.00 0.005 6.00 0.120 400.00 0.37 1/2'' 0.00013 0.238
D CASA48 1092.00 1090.00 10.00 2.00 0.010 11.00 0.120 200.00 0.43 1/2'' 0.00013 0.172

B B1 1130.00 1103.00 95.00 27.00 0.095 99.00 1.080 284.21 0.92 1 1/2'' 0.00114 3.842
B1 B2 1103.00 1098.00 365.00 5.00 0.365 366.00 1.080 13.70 1.70 1 1/2'' 0.00114 0.763
B2 B3 1098.00 1097.50 20.00 0.50 0.020 20.00 0.600 25.00 1.21 1 '' 0.00051 0.364
B3 B4 1097.50 1097.00 10.00 0.50 0.010 11.00 0.480 50.00 0.96 1 '' 0.00051 0.503
B4 B5 1097.00 1096.00 10.00 1.00 0.010 11.00 0.360 100.00 0.75 1 '' 0.00051 0.731
B5 B6 1096.00 1084.00 150.00 12.00 0.150 151.00 0.240 80.00 0.67 3/4'' 0.00029 0.319
B6 CASA58 1084.00 1083.00 5.00 1.00 0.005 6.00 0.120 200.00 0.43 1/2'' 0.00013 0.164
B6 CASA59 1084.00 1081.00 90.00 3.00 0.090 91.00 0.120 33.33 0.62 3/4'' 0.00029 0.198

B2 CASA54 1098.00 1090.00 30.00 8.00 0.030 32.00 0.120 266.67 0.41 1/2'' 0.00013 0.204
B3 CASA55 1097.50 1090.00 30.00 7.50 0.030 31.00 0.120 250.00 0.41 1/2'' 0.00013 0.200
B4 CASA57 1097.00 1085.00 65.00 12.00 0.065 67.00 0.120 184.62 0.44 1/2'' 0.00013 0.170
B5 CASA56 1096.00 1092.00 20.00 4.00 0.020 21.00 0.120 200.00 0.43 1/2'' 0.00013 0.176

B1 CRP-T7 N17 1103.00 1090.00 80.00 13.00 0.080 82.00 0.360 162.50 0.68 1 '' 0.00051 0.987
CRP-T7 N17 B9 1090.00 1082.00 35.00 8.00 0.035 36.00 0.240 228.57 0.54 1 '' 0.00051 1.184
B9 B10 1082.00 1068.00 60.00 14.00 0.060 62.00 0.240 233.33 0.54 3/4'' 0.00029 0.560
B10 CASA49 1068.00 1066.00 5.00 2.00 0.005 6.00 0.120 400.00 0.37 3/4'' 0.00029 0.692

52
Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
B10 CASA50 1068.00 1062.00 45.00 6.00 0.045 46.00 0.120 133.33 0.47 1/2'' 0.00013 0.143
B9 CASA53 1082.00 1080.00 145.00 2.00 0.145 146.00 0.120 13.79 0.74 3/4'' 0.00029 0.123

53
ORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

2.12 0.39 2.49 1185.00 1182.51 47.51

54
Vel. tub Prd. carg. Cota piezo Cota piezo Presin
lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

3.76 1.47 0.33 1135.00 1134.67 1.67


2.12 0.53 0.25 1133.00 1132.75 4.42
3.21 0.42 0.19 1130.00 1129.81 12.23
1.86 0.71 3.20 1122.00 1118.80 26.02
3.18 0.71 0.84 1105.00 1104.16 12.16
2.35 0.47 2.96 1092.00 1089.04 61.20
1.55 0.84 6.21 1040.00 1033.79 10.79
1.61 0.95 3.28 1023.00 1019.72 15.51
1.23 0.95 9.29 1023.00 1013.71 14.50

2.28 0.42 0.52 1133.00 1132.48 12.15


1.88 0.95 0.55 1122.00 1121.45 13.68
1.35 0.95 1.09 1092.00 1090.91 13.07

3.37 0.95 2.77 1130.00 1127.23 28.66


0.67 0.95 10.64 1103.00 1092.36 23.02
0.72 1.18 1.44 1098.00 1096.56 22.08
0.99 0.95 0.47 1097.50 1097.03 22.11
1.44 0.71 0.28 1097.00 1096.72 22.83
1.12 0.84 8.10 1096.00 1087.90 26.74
1.29 0.95 0.55 1084.00 1083.45 27.19
0.70 0.42 1.35 1084.00 1082.65 28.39

1.61 0.95 3.28 1098.00 1094.72 27.74


1.58 0.95 3.28 1097.50 1094.22 26.30
1.34 0.95 7.11 1097.00 1089.89 27.00
1.39 0.95 2.19 1096.00 1093.81 24.64

1.95 0.71 2.23 1103.00 1100.77 39.43


2.34 0.47 0.46 1090.00 1089.54 7.54
1.97 0.84 3.24 1082.00 1078.76 18.30
2.43 0.42 0.07 1068.00 1067.93 20.23

55
Vel. tub Prd. carg. Cota piezo Cota piezo Presin
lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)
1.13 0.95 4.92 1068.00 1063.08 19.38
0.43 0.42 2.17 1082.00 1079.83 7.37

56
CALCULO HIDRAULICO DE LAS REDES DE AGUA POTABLE DEL SUB SISTEMA N07

NOMBRE DE PROYECTO: INSTALACION DE LOS SERVICIO DE SANEAMIENTO BASICO INTEGRAL EN LOS SECTORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, P
DISTRITO : SANTA ANA
PROVINCIA : LA CONVENCION

A POBLACION ACTUAL 2 FAM


INTEGRANTES POR FAMILIA 5 HAB
POBLACION ACTUAL 10 HAB
B TASA DE CRECIMIENTO (%) 0.11 %
C PERIODO DE DISEO 20 AOS
D POBLACION FUTURA Pf = Po ( 1+ r x t/100 ) 10 HAB
E DOTACION LT/HAB/DIA 100 Lt/hab/dia
PORCENTAJE DE DESPERDICIO 20 %
F CONSUMO PROMEDIO ANUAL Qp= (Pob. x Dot./86,400)/(1 - %PF) 0.015 LT/SEG
G CONSUMO MAXIMO DIARIO Qmd = 1.30 x Qp 0.019 LT/SEG
H TIPO DE FUENTE MANANTE
TIPO DE MANANTE LADERA
NUMERO DE MANANTES 1 mant
CAUDAL DE LA FUENTE CAPTACION N01 Lt/Seg 0.520 LT/SEG
CAUDAL DE LA FUENTE MANANTE CAPTACION N020 Lt/Seg 0.000 LT/SEG
CAUDAL TOTAL DE LA FUENTES A USAR Lt/Seg 0.520 LT/SEG
I VOL DE RESERVORIO(M3) V = 0.25 x Qp x 86400/1000 0.32 M3
A UTILIZAR 0.50 M3
J CONSUMO MAXIMO HORARIO Qmh = 2.50 x Qp 0.04 LT/SEG

HAZZEN WILLIAMS Q=0.0004264*C*D^2.64*hf^0.54 C=150 PARA PVC

Cota Cota
terreno terreno Q Max. a
Tramo inicial final Long. Dif nivel Long. lon real Q Real Pend S Calc Asum Area tub conducir
inicial Final (m.s.n.m) (m.s.n.m) (m) (m) (Km) (m) (Lt/seg) (m/Km) (Pulg) (Pulg) (m2) (Lt/seg)
LINEA DE CONDUCCION SUB SISTEMA 07
CAPT -N04 CRP-T6 N01 1750.00 1680.00 105.00 70.00 0.105 127.00 0.100 666.67 0.31 3/4'' 0.00029 0.907
CRP-T6 N01 CRP-T6 N02 1680.00 1615.00 105.00 65.00 0.105 124.00 0.100 619.05 0.32 3/4'' 0.00029 0.883
CRP-T6 N02 CRP-T6 N03 1615.00 1550.00 110.00 65.00 0.110 128.00 0.100 590.91 0.32 3/4'' 0.00029 0.868

57
CRP-T6 N03 RESEV-N01 1550.00 1510.00 105.00 40.00 0.105 113.00 0.100 380.95 0.35 3/4'' 0.00029 0.714

LINEA DE DISTRIBUCION SUBSISTEMA 07 0.12

RESEV-N01 A 1510.00 1508.00 5.00 2.00 0.005 6.00 0.240 400.00 0.49 3/4'' 0.00029 0.692
A CASA01 1508.00 1500.00 45.00 8.00 0.045 46.00 0.120 177.78 0.44 3/4'' 0.00029 0.487
A CASA02 1508.00 1475.00 130.00 33.00 0.130 135.00 0.120 253.85 0.41 3/4'' 0.00029 0.585

58
TORES DE SAN JACINTO LA VICTORIA, DISTRITO DE SANTA ANA, PROVINCIA DE LA CONVENCION CUSCO

Vel. tub Prd. carg. Cota piezo Cota piezo Presin


lleno Vel real Parc. (hf) inicial Final Efectiva
(m/seg) (m/seg) (m.c.a) (m) (m) (m.c.a)

3.18 0.35 1.12 1750.00 1748.88 68.88


3.10 0.35 1.12 1680.00 1678.88 63.88
3.05 0.35 1.17 1615.00 1613.83 63.83

59
2.51 0.35 1.12 1550.00 1548.88 38.88

2.43 0.84 0.27 1510.00 1509.73 1.73


1.71 0.42 0.67 1508.00 1507.33 9.06
2.05 0.42 1.94 1508.00 1506.06 32.79

60