Professional Documents
Culture Documents
#REF!
____________________________________________________________________________________
365758150.xls ____ Page 2 of 50
Engineering Support by:
BY CHK'D APP'D
REV DESCRIPTION DATE DVC
3 of 82
REV DESCRIPTION DATE DVC
PT.SOLUSI ENERGY NUSANTARA
4 of 82
4 of 82
5 of 82
DVC
5 of 82
DVC
6 of 82
6 of 82
Engineering Support by:
7 of 82
Engineering Support by:
TABLE OF CONTENTS
1. GENERAL 4
### Scope of Work 4
### Definition 4
### ### 4
### ### 4
### ### 4
1.6 ### 5
1.7 ### 5
2. DESIGN CRITERIA 7
3. DESIGN LOADING 7
3.1 Dead Load ( D ) 7
### ### 7
### ### 7
3.2 Piping Load (P ) 8
3.3 ### 16
3.4 ### 17
4. LOAD COMBINATION 19
4.1 Unfactored Load Combination 19
5. DATA INPUT 20
5.1 Modeling 20
5.1.1 "3D" View, Plan and Elevation 20
### 25
5.2 Loading 32
6. DATA OUTPUT 37
6.1 Steel Ratio Summary 37
6.2 Deflection Summary 49
7. CONCLUSION 52
8 of 82
PT. SOLUSI ENERGY NUSANTARA
1. DESIGN LOADING
1.1 Dead Load ( D )
Structure Selfweight
The weight of beams or main structure weight are automatically calculated by STAAD Pro. by using
Selfweight Y -1 command.
- Velocity Pressure
Velocity Pressure (as per ASCE 7-10) up to the height of 10 m above grade is shown in
below. These values are derived from:
qz = 0.613 * Kz * Kzt * Kd * V2 * I
Where :
Basic wind speed = 33 m/s
Exposure = C
Wind Directionaly Factor (Kd) : = 0.85
Velocity Pressure Exposure Coefficient (Kz) H = 0-4.6m = 0.85
Topographic Factor (Kzt) = 1
Importance Factor (I) = 1
Gust Factor (G) = 0.85
2. DATA OUTPUT
2.1 Steel Ratio Summary
3 CONCLUSION
* Structural designs of building have been carried out to resist loads safely.
* Steel Member
Allowable Check
Symbol Member Name Dimension L/C Max Ratio Ratio Result
B1 Beam 1 Honeycomb H-Beam 290 x 50 0.318 1 OK
### D16
q
A B h
### D16
L b
SECTION A-A
9.1.1 Tie Beam 1 Flexural Reinforcement
365758150.xls 000000Attachment A2 - 34 of 36
_____________________________________________________________________________________________________________
__________
need Needed reinforcement ratio
= req if req > 1.4 / Fy or
= 1.33 * req < 1.4 / Fy if req < 1.4 / Fy = #REF! % Fy in MPa
used Largest value between rmin and rneed = #REF! % ###
As req Total area of rebar required
= used * b * d = #REF! mm2
As Total area of rebar
= 0.25 * * rebar2 = 201.06 mm2
nr Number of rebar
= As req / As = #REF! ea
Use ###
365758150.xls 000000Attachment A2 - 35 of 36
_____________________________________________________________________________________________________________
__________
req Required reinforcement ratio
= (1/m) * [1 - (1 - 2m * Ru / Fy)] = #REF! % Fy in MPa
b Balanced reinforcement ratio
= (1 * 0.85 * fc' / Fy) * (600 / (600 + Fy)) = #REF! % fc' and Fy in MPa
max Maximum reinforcement ratio
= 0.75 * b = #REF! %
min Minimum reinforcement ratio
= 1.4 / Fy = #REF! % Fy in MPa
need Needed reinforcement ratio
= req if req > 1.4 / Fy or
= 1.33 * req < 1.4 / Fy if req < 1.4 / Fy = #REF! % Fy in MPa
used Largest value between min and need = #REF! % ###
As req Total area of rebar required
= used * b * d = #REF! mm2
As Total area of rebar
= 0.25 * * rebar2 = 201.06 mm2 3-D16
nr Number of rebar
= As req / As = ### ea
= 3 ea Used 3-D16
Use 3-D16 for top & bottom flexural reinforcement.
365758150.xls 000000Attachment A2 - 36 of 36
_____________________________________________________________________________________________________________
__________
###
###
###
365758150.xls 000000Attachment A2 - 37 of 36
_____________________________________________________________________________________________________________
__________
###
###
3-D16
3-D16
365758150.xls 000000Attachment A2 - 38 of 36
_____________________________________________________________________________________________________________
__________
###
###
7. FOUNDATION DESIGN
z
800.00
x .
800.00 600.0
500.0
____________________________________________________________________________________
365758150.xls ____ Page 43 of 50
###
###
Total Weight
Wtotal #REF! kN Calculated
=Wfooting + Wpedestal + Wsoil
Pile Arrangement
DP Pile Dia. 0.3 m Assumed
LP Pile Length ### m Assumed
n Number of Piles 1.0 ea Assumed
____________________________________________________________________________________
365758150.xls ____ Page 44 of 50
###
###
____________________________________________________________________________________
365758150.xls ____ Page 45 of 50
###
###
____________________________________________________________________________________
365758150.xls ____ Page 46 of 50
###
###
Hp
Hf
____________________________________________________________________________________
365758150.xls ____ Page 47 of 50
###
###
H= 26.86 kN M
Hp
Hf
____________________________________________________________________________________
365758150.xls ____ Page 48 of 50
###
###
h1 h2
2 dc + f
1000 mm
Ae = (2 * 50 + 16) *1000
= 301062 mm2
N = 1000/200
= 5.00 ea (number of reinforcement)
A = Ae/N
= 60212.4 mm2
b = h2/h1
= 1.25
w = 1.11e-6 * 1.25 * 240 * (50 * 301061.93)^(1/3)
= 0.0481 mm < 0.33 mm .. OK
____________________________________________________________________________________
365758150.xls ____ Page 49 of 50
###
###
8. SETTLEMENT CHECK
The settlement of single pile with 12 m depth was analyzed using half-space theory proposed
by Timoshenko and Goodier (1951) and Poulos and Davis (1980) as shown below.
Imaginary raft at the depth of 2/3 the length of pile was assumed with load spreading of 4V:1H.
The settlement were estimated below.
Braft
____________________________________________________________________________________
365758150.xls ____ Page 49 of 50
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
9. CONNECTION DESIGN
9.1 Connection Specification
9.1.1. Structural Steel (ASTM A-36)
Fu Structural steel ultimate tensile #REF! MPa
strength
Fy Structural steel yield strength #REF! MPa
Fb Structural steel bending strength #REF! MPa
Ft Structural steel tension strength #REF! MPa
Fv Structural steel shear strength #REF! MPa
9.1.5. Concrete
fc' Compressive strength for 28.00 MPa
structural concrete
fc' Compressive strength for #REF! MPa
leveling concrete
________________________________________________________________________________________________
365758150.xls Page 46 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
In the same way, following table consist of plate thickness vs bolt size :
List of plate thickness & bolt size
No M12 M16 M20 M22 M24
Diameter (mm) 12.0 16.0 20.0 22.0 24.0
Bolt area (mm2) 113.1 201.1 314.2 380.1 452.4
Min. bolt to bolt dist., s (mm) 36.0 48.0 60.0 66.0 72.0
Min. bolt to edge dist., lh (mm) 18.0 24.0 30.0 33.0 36.0
Allowable shear force, V all (kN) ### ### ### ### ###
Plate thickness (mm) tp 1 ### ### ### ### ###
tp 2 ### ### ### ### ###
tp 3 ### ### ### ### ###
tp govern ### ### ### ### ###
Detail 2
Detail 3
Detail 7
Detail 6
Detail 5
21 m
Z
Y
X
Detail 10
Load 1
Detail 4
Detail 9
Y
X
Z
Detail 8
________________________________________________________________________________________________
365758150.xls Page 47 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Fig. 9.31 Connection map.
Y
X Z
Load 31 : Displacement
________________________________________________________________________________________________
365758150.xls Page 48 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
9.4 DETAIL-1
PART : RAFTER
RIDGE POINT:
MH-450x200x9x14
A
END PLATE 22mm
V V
T T
M M
A
Y
X Elevation
Z
END POINT:
W
S A H-
S S
H 50
VM H- H-
- T 0x
45 45
5 20
0x 0x
0 0x
20 20
0 10
0x 0x
x x1
9x P9x
2 A 6
E 14 l 14
0 a
l
0 n
e
x
v
1
a
0
t
x
i
1
o
6
n
________________________________________________________________________________________________
365758150.xls Page 49 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
________________________________________________________________________________________________
365758150.xls Page 50 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
35 130 35 a
50 Rmax
7 125
125
100
125
Neutral Axis
50 c1 compression area
Section A-A
b
Rafter Foothold
1. Column : SH-500x200x10x16
2. Rafter : SH-450x200x9x14
Symbol Description Value Unit Remarks
h beam height 450 mm Reference 9
hp total beam height 675 mm Detail 1
b beam width 200 mm Reference 9
tw web thickness 9 mm Reference 9
tf flange thickness 14 mm Reference 9
r corner radius 18 mm Reference 9
Bolt Properties :
Symbol Description Value Unit Remarks
db bolt diameter 19 mm M-22
Ab bolt area 283.53 mm2 0.25 * p * db2
n total number of bolts 12 nos
________________________________________________________________________________________________
365758150.xls Page 51 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
m = number of bolt column
= 2
Permanent Load
Mu = 64.716 kN.m
Pu = -28.523 kN (tension)
Vu = 22.044 kN
Fvb = Vu / (n x Ab)
= 22.044 x 1000 / (12 x 283.53)
= 6.48 MPa ###
Ftb = Mu x c / I + Pu / (Ab*nb)
= (64.716 x 1000000 x 583/384842285) + (28.52 x 1000 / 283.53 / 12)
= 106.34 Mpa < 299.69 MPa . OK
Temporary Load
Mu = 128.004 kN.m
Pu = -32.845 kN (tension)
Vu = 32.845 kN
Fvb = Vu / (n x Ab)
= 32.845 x 1000 / (12 x 283.53)
= 9.65 MPa ###
________________________________________________________________________________________________
365758150.xls Page 52 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Ftb = Mu x c / I + Pu / (Ab*nb)
= (128.004 x 1000000 x 583/384842285) + (32.85 x 1000 / 283.53 / 12)
= 203.41 Mpa < 1.33 x 299.32 MPa . OK
Shear Capacity
Vs = S Lw x te x fvw
= ###
= #REF! kN
Moment Capacity
Mz :
Lw = bf + (bf - tw)
= 200 + (200 - 9)
= 391.00 mm
Ff = Lw x te x fvw
= ###
= #REF! kN
M = Ff x (hp - tf)
= #REF! kN.m
Vu = 22.044 kN
Ratio = ###
= #REF! ###
Temporary Load
Mu = 128.004 kN.m
T = -32.845 kN
Ratio = ###
= #REF! ###
Vu = 32.85 kN
Ratio = ###
= #REF! ###
________________________________________________________________________________________________
365758150.xls Page 53 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
a1 = 35 mm
b1 = 0.5 b - a1 - 0.5 tw
= 0.5 x 200 - 35 - 0.5 x 9
= 60.5 mm
a' = a1 + d/2
= 35 + 19/2
= 44.50 mm
b' = b1 - d/2
= 60.5 - 19/2
= 51 mm
B = bolt tension capacity
= ft x Ab
= ###
= #REF! kN
tc = plate thickness to resist bolt tension capacity
= ((8 B b') / (p fy))^0.5
= ###
= #REF! mm
r = b' / a'
= 51/44.5
= 1.15
d = 1 - d' / p
= 1 - 20.5875/112.5
= 0.8
a = (1/(d x (1 + r)))((tc/tp)2 -1)
= ###
= #REF!
Tall = tension force allowable per bolt
if > 1 = B x (tp/tc)^2 x (1 + )
if 0 1 = B x (tp/tc)^2 x (1 + )
if < 0 = B
= #REF! kN ### (permanent condition)
= #REF! kN ### (temporary condition)
________________________________________________________________________________________________
365758150.xls Page 54 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
________________________________________________________________________________________________
365758150.xls Page 55 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Shear Capacity
An = tp * ( Lp - n/2 * (db + 1/16*25.4))
= 22 x (675 - 12/2 x ( 19 + 1/16 x 25.4))
= 12,132.5 mm2
Vs1 = 0.3 * fu * An
= ###
= #REF! kN
Ag = tp * hp
= 22 x 675
= 14,850 mm2
Vs2 = 0.4 * fy * Ag
= ###
= #REF! kN
Vs = min of Vs1 and Vs2
= #REF! kN
Axial Capacity
Since all tension force less than tension force to bolt due to moment then the axial capacity need not to be
considered.
________________________________________________________________________________________________
365758150.xls Page 56 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
________________________________________________________________________________________________
365758150.xls Page 57 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
###
bst = bf - tw - 2r
= 155.00 mm
tst = Ast needed / bst
= #REF! mm (Needed)
= 10 mm (Used)
Although no stiffener is needed, pair of stiffener will be provided to reinforce joint between column and beam.
Pair of 10 mm thick stiffener will be provided and extend full depth of web. In this condition, local flange bending,
local web yielding and web crippling need not to be checked. (Ref. 7 sect. K1.1)
Ast = tst used x bst
= 1550.00 mm2
Sidesway Web Buckling (Ref. 7 sect. K1.5)
dc = d - 2k
= 386 mm
l = 675 mm
(dc/tw)/(l/bf)
= 12.71 -
For loaded flange is not restrained against rotation and (dc/tw)/(l/bf) is exceed 1.7, sidesway web buckling need not
to be checked.
Pbf max
= 252.85 kN ###
###
________________________________________________________________________________________________
365758150.xls Page 58 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
9.5 DETAIL-2
PART : EAVES BEAM
SH-500x200x10x16
SH-500x200x10x16
A
SH-150x75x5x7 SH-150x75x5x7
V M
T
Plan
A
Elevation
7 30 65 30 a
40 Rmax
tension area
70
Neutral Axis
compression area
40
Section A-A
b
Canopy Foothold
Column : SH-500x200x10x16
Symbol Description Value Unit Remarks
h beam height 150 mm Reference 9
hp total beam height 150 mm Detail 1
b beam width 75 mm Reference 9
tw web thickness 5 mm Reference 9
tf flange thickness 7 mm Reference 9
r corner radius 8 mm Reference 9
Bolt Properties :
Symbol Description Value Unit Remarks
db bolt diameter 19 mm M-22
Ab bolt area 283.53 mm2 0.25 * p * db2
________________________________________________________________________________________________
365758150.xls Page 59 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
n total number of bolts 4 nos
h = c1 + c
solving both equation give:
c = h/1.32
= 150/1.32
= 114 mm
c1 = h-c
= 150 - 114
= 36 mm
I = equivalent moment inertia of bolt configuration
= 1/3 (a x c3 + b x c13)
= 1/3 (7.56 x 114^3 + 150 x 36^3)
= 6.08E+06 mm4
Permanent Load
LC : 31
Node : 77
Mu = 1.146 kN.m
Pu = -0.3 kN (tension)
Vu = 1.499 kN
Fvb = Vu / (n x Ab)
= 1.499 x 1000 / (4 x 283.53)
= 1.32 MPa ###
Ftb = Mu x c / I + Pu / (Ab*nb)
= (1.146 x 1000000 x 583/384842285) + (0.3 x 1000 / 283.53 / 12)
________________________________________________________________________________________________
365758150.xls Page 60 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
= 1.82 Mpa < 299.99 MPa . OK
Temporary Load
LC : 36
Node : 82
Mu = 2.041 kN.m
Pu = -0.534 kN (tension)
Vu = 2.669 kN
Fvb = Vu / (n x Ab)
= 2.669 x 1000 / (4 x 283.53)
= 2.35 MPa ###
Ftb = Mu x c / I + Pu / (Ab*nb)
= (2.041 x 1000000 x 114/6081089) + (0.53 x 1000 / 283.53 / 4)
= 3.25 Mpa < 1.33 x 299.96 MPa . OK
Shear Capacity
Vs = S Lw x te x fvw
= ###
= #REF! kN
Moment Capacity
Mz :
Lw = bf + (bf - tw)
= 75 + (75 - 5)
= 145.00 mm
Ff = Lw x te x fvw
= ###
= #REF! kN
M = Ff x (hp - tf)
= #REF! kN.m
Mu = 1.146 kN.m
T = -0.3 kN
________________________________________________________________________________________________
365758150.xls Page 61 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Ratio = ###
= #REF! ###
Vu = 1.499 kN
Ratio = ###
= #REF! ###
Temporary Load
Mu = 2.041 kN.m
T = -0.534 kN
Ratio = ###
= #REF! ###
Vu = 2.67 kN
Ratio = ###
= #REF! ###
= 3.25 x 283.53/1000
= 0.9 kN (temporary condition)
tp = 12 mm > 6.5 mm for M20, Ok..! (see section 7.2)
p = length of end plate tributary to each bolt
= 75 mm
d' = d + 1/16 in
= 19 + 1/16 x 25.4
= 20.59 mm
a1 = 30 mm
b1 = 0.5 b - a1 - 0.5 tw
= 0.5 x 125 - 30 - 0.5 x 5
= 30 mm
a' = a1 + d/2
= 30 + 19/2
= 39.50 mm
b' = b1 - d/2
= 30 - 19/2
= 20.5 mm
B = bolt tension capacity
= ft x Ab
= ###
= #REF! kN
tc = plate thickness to resist bolt tension capacity
= ((8 B b') / (p fy))^0.5
= ###
________________________________________________________________________________________________
365758150.xls Page 62 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
= #REF! mm
r = b' / a'
= 20.5/39.5
= 0.52
d = 1 - d' / p
= 1 - 20.5875/75
= 0.7
Shear Capacity
An = tp * ( Lp - n/2 * (db + 1/16*25.4))
= 12 x (150 - 4/2 x ( 19 + 1/16 x 25.4))
= 1,305.9 mm2
Vs1 = 0.3 * fu * An
= ###
= #REF! kN
Ag = tp * hp
= 12 x 150
= 1,800 mm2
Vs2 = 0.4 * fy * Ag
= ###
= #REF! kN
Vs = min of Vs1 and Vs2
= #REF! kN
Axial Capacity
Since all tension force less than tension force to bolt due to moment then the axial capacity need not to be
considered.
________________________________________________________________________________________________
365758150.xls Page 63 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
= 15.0 mm
k1 = 1/2 tw + r
= 10.5 mm
Mu max permanent
= 1.15 kN.m
Mu max temporary
= 2.04 kN.m
Ff permanent
= Mu max permanent / hp
= 7.64 kN
Ff temporary
= Mu max temporary / hp
= 13.61 kN
Pbf permanent
= 5/3 Ff permanent
= 12.73 kN
Pbf temporary
= 4/3 Ff temporary
= 18.14 kN
###
bst = bf - tw - 2r
= 75.00 mm
tst = Ast needed / bst
= #REF! mm (Needed)
= 10 mm (Used)
Although no stiffener is needed, pair of stiffener will be provided to reinforce joint between column and beam.
Pair of 10 mm thick stiffener will be provided and extend full depth of web. In this condition, local flange bending,
local web yielding and web crippling need not to be checked. (Ref. 7 sect. K1.1)
Ast = tst used x bst
= 750.00 mm2
________________________________________________________________________________________________
365758150.xls Page 64 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
= #REF! kips
= #REF! kN
Pbf max
= 18.14 kN ###
###
Temporary Load
Vu = Mmax / (0.95 hp)
= 14.32 kN
Vs = 1.33 * 0.4 Fy d tw
= #REF! kN
###
9.6 DETAIL-3
PART : RUN WAY BEAM
Y
Z X
UNP-150 (Typ.) Load 1
V1
WH-500x200x10x16 7 Typ.
WH-200x200x8x12
________________________________________________________________________________________________
365758150.xls Page 65 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Typ.
Elevation
WH-500x200x10x16
UNP-150 (Typ.)
WH-500x200x10x16 V1
WH-500x200x10x16
Plan
V2 Fig. 7.6.1 Detail 3.
________________________________________________________________________________________________
365758150.xls Page 66 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
case 1
V1 max = 7.48 kN < 1.33 Vb cap, Ok
V2 = 13.45 kN < 1.33 Vb cap, Ok
case 2
V1 = 2.62 kN < 1.33 Vb cap, Ok
V2 max = 74.33 kN < 1.33 Vb cap, Ok
300
________________________________________________________________________________________________
365758150.xls Page 67 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Ag = hp * tp = 3,000.00 mm2
An = Ag-[nc*tp*(db+1/16*25.4)] = 2,176.50 mm2
V1p cap Shear capacity = #REF! kN
= 0.3 * Fu * An
V1p cap Shear capacity = #REF! kN
= 0.4 * Fy * Ag
Location : run way beam
hp = h - 2 * tf = 468.00 mm
tp Gusset plate thickness = 10.00 mm
Ag = hp * tp = 4,680.00 mm2
An = Ag-[nr*tp*(db+1/16*25.4)] = 3,856.50 mm2
V2p cap Shear capacity = #REF! kN
= 0.3 * Fup * An
V2p cap Shear capacity = #REF! kN
= 0.4 * Fyp * Ag
9.7 DETAIL-4
PART : RING BEAM
________________________________________________________________________________________________
365758150.xls Page 68 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Y
X
Z Load 1
________________________________________________________________________________________________
365758150.xls Page 69 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
SH250x125x6x9
A
SH250x125x6x9
7
SH500x200x10x16
SH500x200x10x16
Section A-A
Column Properties :
SH500x200x10x16
Symbol Description Value Unit Remarks
h column height 500 mm Reference 9
b column width 200 mm Reference 9
tw web thickness 10 mm Reference 9
tf flange thickness 16 mm Reference 9
________________________________________________________________________________________________
365758150.xls Page 71 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Shear Capacity
Vs = fvb x Ab x n (web)
= ###
= #REF! kN
Moment Capacity
P each flange
= fvb x Ab x n
= ###
= 155.82 kN
M = P each flange x h
= 155.82 x 250/1000
= 38.96 kN.m
Permanent Load
Pu = 1.12 kN
Mu = 2.32 kN.m
Ratio = ###
= #REF! ###
Vu = 2.19 kN
Ratio = #REF!
= #REF! ###
Temporary Load
Pu = 3.31 kN
Mu = 7.33 kN.m
Ratio = ###
= #REF! ###
Vu = 2.21 kN
Ratio = #REF!
= #REF! ###
________________________________________________________________________________________________
365758150.xls Page 72 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Vs1 = 0.3 * fu * An
= ###
= #REF! kN
Vs2 = 0.4 * fy * Ag
= ###
= #REF! kN
Vs = min of Vs1 and Vs2
= #REF! kN
Pw = Ag x 0.6 x fy
= ###
= #REF! kN
Flange
s = 3db
= 3 x 20
= 60.00 mm (Needed)
= 60.00 mm (Used)
Le = 1 1/2 db
= 1.5 x 20
= 30.00 mm (Needed)
= 30.00 mm (Used)
tp = 10.00 mm
Ag = tp x bf
= 10 x 125
= 1250 mm2
An = Ag - 2 db tp
= 1250 - 2 x 10 x 20
= 850 mm2
P1 = 0.6 fy Ag
= 0.6 x 1250 x /1000
= 180 kN
P2 = 0.5 fu An
= 0.5 x 850 x /1000
= 170 kN
P for each flange
= min of P1 and P2
= 170 kN
M = P for each flange x h
= 170 x 250/1000
= 42.5 kN.m
Pf = 2 P for each flange
= 2 x 170
= 340 kN
________________________________________________________________________________________________
365758150.xls Page 73 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
________________________________________________________________________________________________
365758150.xls Page 74 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Permanent Load
Pu = 1.12 kN
Mu = 2.32 kN.m
Ratio = ###
= #REF! ###
Vu = 2.19 kN
Ratio = #REF!
= #REF! ###
Temporary Load
Pu = 3.31 kN
Mu = 7.33 kN.m
Ratio = ###
= #REF! ###
Vu = 2.21 kN
Ratio = ###
= #REF! ###
Permanent Load
Pu = 1.12 kN
Vu = 2.19 kN
Ft = Pu/A
= 1.119/890.82 x 1000
= 1.26 MPa
Fv = Vu/A
= 2.185/890.82 x 1000
= 2.45 MPa
(Ft2 + Fv2)
= (1.26^2 + 2.45^2)^0.5
= 2.76 MPa < fvw (MPa).. OK
Temporary Load
Pu = 3.31 kN
Vu = 2.21 kN
Ft = Pu/A
= 3.307/890.82 x 1000
= 3.71 MPa
Fv = Vu/A
= 2.2124/890.82 x 1000
= 2.48 MPa
________________________________________________________________________________________________
365758150.xls Page 75 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
(Ft2 + Fv2)
= (3.71^2 + 2.48^2)^0.5
= 4.47 MPa ###
Flange
Fillet weld will be applied along gusset plate at one side.
w = 7.0 mm
Permanent Load
Pu = 1.12 kN
Mu = 2.32 kN.m
Ft = Pu/2 + Mu / h
= (559.5 + 2317000/250)
= 9.83 kN
A needed
= Ft / fvw
= #REF! mm2
Lw needed
= A needed / 0.707 w
= #REF! mm
Temporary Load
Pu = 3.31 kN
Mu = 7.33 kN.m
Ft = Pu/2 + Mu / h
= (1653.5 + 7331000/250)
= 30.98 kN
A needed
= Ft / 1.33 fvw
= #REF! mm2
Lw needed
= A needed / 0.707 w
= #REF! mm
###
________________________________________________________________________________________________
365758150.xls Page 76 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
9.8 DETAIL-5
PART : BASE PLATE FOR COLUMN SH-500x200x10x16 (Ref. 7 Part 3 "Column")
s2
650 (minimum)
a
0.95h
L
s1
a
0.80b
c c
B
Fig. 7.8.1 SH500x200x10x16 Column Base Plate.
Column Properties :
SH500x200x10x16
Symbol Description Value Unit Remarks
h Column height 500 mm Reference 9
b Column width 200 mm Reference 9
tw Web thickness 10 mm Reference 9
tf Flange thickness 16 mm Reference 9
Each Column is minimum supported by rectangular pedestal with 650mm x 400mm width.
Apc = 650 x 400 / 100
= 2600 cm2
________________________________________________________________________________________________
365758150.xls Page 77 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Ab = 0.25 * p * db2
= 0.25 x 3.14 x (25.4^2)
= 506.71 mm2
Fv = Vu / (n * Ab)
= 26.04 x 1000/(4 x 506.71)
= 12.85 MPa ###
ftb = 173 - 1.8Fv < 133.4
= 173 - 1.8 x 12.85 < 133.4
= 133.40 MPa
Tall = Ab x ftb all
= 67.59 kN
Tu each bolt
= Tu / n
= 11.706/4
= 2.93 kN < 67.59 kN .. OK
________________________________________________________________________________________________
365758150.xls Page 78 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
________________________________________________________________________________________________
365758150.xls Page 80 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
d = 1 - d' / p
= 1 - 26.9875/200
= 0.9
a = (1/(d x (1 + r)))((tc/tp)2 -1)
= ###
= #REF!
Vu/bolt
= 6.51 kN ###
Anchor bolt boundaries shall conform to JOB Pertamina-Hess drawing no GL-00-STR-047 "Std. Drawing
Anchor Bolt"
________________________________________________________________________________________________
365758150.xls Page 81 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
9.9 DETAIL-6
PART : BASE PLATE FOR COLUMN WH-175x175x7.5x11 (Ref. 7 Part 3 "Column")
s2
350 (minimum)
a
0.95h
lp
a
0.80b
c c
bp
Fig. 7.9.1 WH175x175x7.5x11 Column Base Plate.
Column Properties :
WH175x175x7.5x11
Symbol Description Value Unit Remarks
h Column height 175 mm Reference 9
b Column width 175 mm Reference 9
tw Web thickness 7.5 mm Reference 9
tf Flange thickness 11 mm Reference 9
________________________________________________________________________________________________
365758150.xls Page 82 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Ab = 0.25 * p * db2
= 0.25 x 3.14 x (19.05^2)
= 285.02 mm2
Fv = Vu / (n * Ab)
= 7.73 x 1000/(2 x 285.02)
= 13.56 MPa ###
ftb = 173 - 1.8Fv < 133.4
= 173 - 1.8 x 13.56 < 133.4
= 133.40 MPa
Tall = Ab x ftb all
= 38.02 kN
Tu each bolt
= Tu / n
= 0.0802/2
= 0.04 kN < 38.02 kN .. OK
c = Cmax
= 83069.00
L = 8.12 mm
tp2 = L 3Fc / fb
= ###
= #REF! mm
Vu/bolt
= 3.86 kN ###
Anchor bolt boundaries shall conform to JOB Pertamina-Hess drawing no GL-00-STR-047 "Standard Drawing
Anchor Bolt"
9.10 DETAIL-7
PART : TIE ROD FOR WALL & ROOF
Y
X
Z Load 1
T
A Beam or Column
Lp
hp
________________________________________________________________________________________________
365758150.xls Page 85 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Beam or Column
9.11 DETAIL-8
PART : WALL BRACING
Y
X Z
Load 1
CT-150
________________________________________________________________________________________________
365758150.xls Page 87 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
db Bolt M20 = 19.00 mm
Ab Bolt area = 283.53 mm2
= 0.25 * p * db2
m Number of bolts in row dir. = 3.00 ea
n Number of bolts in column dir. = 2.00 ea
________________________________________________________________________________________________
365758150.xls Page 88 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
9.12 DETAIL-9
PART : SECONDARY BEAM
Y
X Z
Load 1
SH250x125x6x9
A
SH250x125x6x9
7
SH500x200x10x16
SH500x200x10x16
Section A-A
________________________________________________________________________________________________
365758150.xls Page 89 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
Symbol Description Value Unit Remarks
h beam height 250 mm Reference 9
b beam width 125 mm Reference 9
tw web thickness 6 mm Reference 9
tf flange thickness 9 mm Reference 9
Column Properties :
SH500x200x10x16
Symbol Description Value Unit Remarks
h column height 500 mm Reference 9
b column width 200 mm Reference 9
tw web thickness 10 mm Reference 9
tf flange thickness 16 mm Reference 9
Shear Capacity
Vs = fvb x Ab x n (web)
= ###
= #REF! kN
Permanent Load
Pu = 38.64 kN
Ratio = ###
= #REF! ###
Vu = 0.98 kN
Ratio = #REF!
= #REF! ###
Temporary Load
Pu = 54.08 kN
Ratio = ###
= #REF! ###
Vu = 0.98 kN
Ratio = #REF!
= #REF! ###
Permanent Load
Pu = 38.64 kN
Ratio = ###
= #REF! ###
Vu = 0.98 kN
Ratio = #REF!
= #REF! ###
Temporary Load
Pu = 54.09 kN
Ratio = ###
= #REF! ###
Vu = 0.98 kN
Ratio = #REF!
= #REF! ###
________________________________________________________________________________________________
365758150.xls Page 91 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
9.12.3 Weld Capacity
Web
Fillet weld will be applied along gusset plate at one side.
Lw = hg
= 180.0 mm
w = 7.0 mm
A = 0.707 w x Lw
= 0.707 x 7 x 180
= 890.8 mm2
Permanent Load
Pu = 38.64 kN
Vu = 0.98 kN
Ft = Pu/A
= 38.638/890.82 x 1000
= 43.37 MPa
Fv = Vu/A
= 0.983/890.82 x 1000
= 1.10 MPa
(Ft2 + Fv2)
= (43.37^2 + 1.1^2)^0.5
= 43.39 MPa ###
Temporary Load
Pu = 54.09 kN
Vu = 0.98 kN
Ft = Pu/A
= 54.09/890.82 x 1000
= 60.72 MPa
Fv = Vu/A
= 0.983/890.82 x 1000
= 1.10 MPa
(Ft2 + Fv2)
= (60.72^2 + 1.1^2)^0.5
= 60.73 MPa ###
9.13 DETAIL-10
PART : HORIZONTAL BRACING
Y X
Loa
Z
________________________________________________________________________________________________
365758150.xls Page 92 of 84
JAMBI MERANG GAS PRODUCTION FACILITIES DEVELOPMENT
CALCULATION
________________________________________________________________________________________________
tw web thickness 6 mm Reference 9
tf flange thickness 6 mm Reference 9
r corner radius 8.5 mm Reference 9
________________________________________________________________________________________________
365758150.xls Page 93 of 84
Spun Concrete Pile
Dia300mm Dia400mm Dia350mm
D= 300mm= 0.300m D= 400mm= 0.400m D= 350mm= 0.350m
d D
T d= 180mm= 0.180m d= 250mm= 0.250m d= 200mm= 0.200m
T= 60mm= 0.060m T= 75mm= 0.075m T= 75mm= 0.075m
weight= 115kg/m= 1.128KN/m weight= 195kg/m= 1.913KN/m weight= 151kg/m= 1.484KN/m
(1) (2) (3) (4) (5) (6) (7) (8)
Ultimate Pile Capacity Allowable Pile Capacity
No Borehole Negative
toe elevation Compressive Tension pile self Pile comp. working Capacity
pile length Diameter Plant Elevation
from MSL
Compressive Tension
SF=2.0 SF=3.0 weight w x L
skin
(kN) Remarks
friction
(-) (-) m, from MSL (mm) (m) (m) (kN) (kN) (kN) (kN) (kN) (kN) (3)-(5)-(6) (3)-(6)
Sungai Kenawang
1 BH-04 18 300 +9.50 -8.5 360 320 180.00 106.67 20.31 159.69 180.00 -
18 400 +9.50 -8.5 520 425 260.00 141.67 34.43 225.57 260.00 -
24 300 +9.50 -14.5 635 495 317.50 165.00 27.08 290.42 317.50 -
24 400 +9.50 -14.5 900 670 450.00 223.33 45.91 404.09 450.00 -
30 300 +9.50 -20.5 740 695 370.00 231.67 33.84 336.16 370.00 -
30 400 +9.50 -20.5 1020 925 510.00 308.33 57.39 452.61 510.00 -
36 300 +9.50 -26.5 1630 1030 815.00 343.33 40.61 774.39 815.00 -
36 400 +9.50 -26.5 2415 1382 1207.50 460.67 68.87 1138.63 1207.50 -
42 300 +9.50 -32.5 0 0 0.00 0.00 47.38 -47.38 0.00 unusable
42 400 +9.50 -32.5 0 0 0.00 0.00 80.34 -80.34 0.00 unusable
2 BH-05 18 300 +9.50 -8.5 310 290 155.00 96.67 20.31 134.69 155.00 -
18 400 +9.50 -8.5 445 375 222.50 125.00 34.43 188.07 222.50 -
24 300 +9.50 -14.5 500 475 250.00 158.33 27.08 222.92 250.00 -
24 400 +9.50 -14.5 705 645 352.50 215.00 45.91 306.59 352.50 -
30 300 +9.50 -20.5 845 710 422.50 236.67 33.84 388.66 422.50 -
30 400 +9.50 -20.5 1180 950 590.00 316.67 57.39 532.61 590.00 -
36 300 +9.50 -26.5 1200 1000 600.00 333.33 40.61 559.39 600.00 -
36 400 +9.50 -26.5 1650 1325 825.00 441.67 68.87 756.13 825.00 -
42 300 +9.50 -32.5 1910 1440 955.00 480.00 47.38 907.62 955.00 -
42 400 +9.50 -32.5 2780 1900 1390.00 633.33 80.34 1309.66 1390.00 -
3 BH-07 12 300 +9.50 -2.5 250 200 125.00 66.67 13.54 111.46 125.00 -
12 350 +9.50 -2.5 300 237.5 150.00 79.17 17.81 132.19 150.00 -
12 400 +9.50 -2.5 350 275 175.00 91.67 22.96 152.04 175.00 -
18 300 +9.50 -8.5 400 350 200.00 116.67 20.31 179.69 200.00 -
18 350 +9.50 -8.5 475 412.5 237.50 137.50 26.72 210.78 237.50 -
18 400 +9.50 -8.5 550 475 275.00 158.33 34.43 240.57 275.00 -
24 300 +9.50 -14.5 600 540 300.00 180.00 27.08 272.92 300.00 -
24 350 +9.50 -14.5 742.5 625 371.25 208.33 35.62 335.63 371.25 -
24 400 +9.50 -14.5 885 710 442.50 236.67 45.91 396.59 442.50 -
30 300 +9.50 -20.5 925 740 462.50 246.67 33.84 428.66 462.50 -
30 350 +9.50 -20.5 1112.5 885 556.25 295.00 44.53 511.72 556.25 -
30 400 +9.50 -20.5 1300 1030 650.00 343.33 57.39 592.61 650.00 -
36 300 +9.50 -26.5 1110 1000 555.00 333.33 40.61 514.39 555.00 -
36 350 +9.50 -26.5 1305 1175 652.50 391.67 53.43 599.07 652.50 -
36 400 +9.50 -26.5 1500 1350 750.00 450.00 68.87 681.13 750.00 -
42 300 +9.50 -32.5 1475 1375 737.50 458.33 47.38 690.12 737.50 -
42 350 +9.50 -32.5 1742.5 1607.5 871.25 535.83 62.34 808.91 871.25 -
42 400 +9.50 -32.5 2010 1840 1005.00 613.33 80.34 924.66 1005.00 -
4 BH-08 12 300 +9.50 -2.5 350 300 175.00 100.00 13.54 161.46 175.00 -
12 350 +9.50 -2.5 415 345 207.50 115.00 17.81 189.69 207.50 -
12 400 +9.50 -2.5 480 390 240.00 130.00 22.96 217.04 240.00 -
18 300 +9.50 -8.5 480 425 240.00 141.67 20.31 219.69 240.00 -
18 400 +9.50 -8.5 660 600 330.00 200.00 34.43 295.57 330.00 -
24 300 +9.50 -14.5 750 600 375.00 200.00 27.08 347.92 375.00 -
24 350 +9.50 -14.5 895 700 447.50 233.33 27.08 420.42 447.50 -
24 400 +9.50 -14.5 1040 800 520.00 266.67 45.91 474.09 520.00 -
30 300 +9.50 -20.5 1260 875 630.00 291.67 33.84 596.16 630.00 -
30 350 +9.50 -20.5 1560 1017.5 780.00 339.17 44.53 735.47 780.00 -
30 400 +9.50 -20.5 1860 1160 930.00 386.67 57.39 872.61 930.00 -
36 300 +9.50 -26.5 1750 1140 875.00 380.00 40.61 834.39 875.00 -
36 350 +9.50 -26.5 2147.5 1320 1073.75 440.00 53.43 1020.32 1073.75 -
36 400 +9.50 -26.5 2545 1500 1272.50 500.00 68.87 1203.63 1272.50 -
42 300 +9.50 -32.5 2100 1420 1050.00 473.33 47.38 1002.62 1050.00 -
42 400 +9.50 -32.5 3100 1900 1550.00 633.33 80.34 1469.66 1550.00 -
5 BH-09 18 300 +9.50 -8.5 545 400 272.50 133.33 20.31 252.19 272.50 -
18 400 +9.50 -8.5 770 550 385.00 183.33 34.43 350.57 385.00 -
24 300 +9.50 -14.5 650 600 325.00 200.00 27.08 297.92 325.00 -
24 400 +9.50 -14.5 925 800 462.50 266.67 45.91 416.59 462.50 -
30 300 +9.50 -20.5 1300 860 650.00 286.67 33.84 616.16 650.00 -
30 400 +9.50 -20.5 1925 1150 962.50 383.33 57.39 905.11 962.50 -
36 300 +9.50 -26.5 1125 1100 562.50 366.67 40.61 521.89 562.50 -
36 400 +9.50 -26.5 1540 1450 770.00 483.33 68.87 701.13 770.00 -
42 300 +9.50 -32.5 1475 1380 737.50 460.00 47.38 690.12 737.50 -
42 400 +9.50 -32.5 2025 1825 1012.50 608.33 80.34 932.16 1012.50 -
Spun Concrete Pile
Dia300mm Dia400mm Dia350mm
D= 300mm= 0.300m D= 400mm= 0.400m D= 350mm= 0.350m
d D
T d= 180mm= 0.180m d= 250mm= 0.250m d= 200mm= 0.200m
T= 60mm= 0.060m T= 75mm= 0.075m T= 75mm= 0.075m
weight= 115.00 1.13 weight= 195.00 1.91 weight= 151.30 1.48
6 BH-10 18 300 +6.50 -11.5 135 60 67.50 20.00 20.31 153.00 -105.81 -85.50 unusable
18 400 +6.50 -11.5 250 100 125.00 33.33 34.43 204.00 -113.43 -79.00 unusable
24 300 +6.50 -17.5 450 300 225.00 100.00 27.08 153.00 44.92 72.00 -
24 350 +6.50 -17.5 550 340 275.00 113.33 35.62 179.00 60.38 96.00 -
24 400 +6.50 -17.5 650 380 325.00 126.67 45.91 204.00 75.09 121.00 -
30 300 +6.50 -23.5 710 550 355.00 183.33 33.84 153.00 168.16 202.00 -
30 350 +6.50 -23.5 867.5 632.5 433.75 210.83 44.53 179.00 210.22 254.75 -
30 400 +6.50 -23.5 1025 715 512.50 238.33 57.39 204.00 251.11 308.50 -
36 300 +6.50 -29.5 1050 940 525.00 313.33 40.61 153.00 331.39 372.00 -
36 350 +6.50 -29.5 1247.5 1095 623.75 365.00 53.43 179.00 391.32 444.75 -
36 400 +6.50 -29.5 1445 1250 722.50 416.67 68.87 204.00 449.63 518.50 -
42 300 +6.50 -35.5 1475 1370 737.50 456.67 47.38 153.00 537.12 584.50 -
42 350 +6.50 -35.5 1737.5 1597.5 868.75 532.50 62.34 179.00 627.41 689.75 -
42 400 +6.50 -35.5 2000 1825 1000.00 608.33 80.34 204.00 715.66 796.00 -
7 BH-11 18 300 +6.50 -11.5 100 80 50.00 26.67 20.31 153.00 -123.31 -103.00 unusable
18 400 +6.50 -11.5 175 100 87.50 33.33 34.43 204.00 -150.93 -116.50 unusable
24 300 +6.50 -17.5 260 200 130.00 66.67 27.08 153.00 -50.08 -23.00 unusable
24 350 +6.50 -17.5 310 250 155.00 83.33 35.62 179.00 -59.62 -24.00 unusable
24 400 +6.50 -17.5 360 300 180.00 100.00 45.91 204.00 -69.91 -24.00 unusable
30 300 +6.50 -23.5 640 480 320.00 160.00 33.84 153.00 133.16 167.00 -
30 350 +6.50 -23.5 782.5 565 391.25 188.33 44.53 179.00 167.72 212.25 -
30 400 +6.50 -23.5 925 650 462.50 216.67 57.39 204.00 201.11 258.50 -
36 300 +6.50 -29.5 955 875 477.50 291.67 40.61 153.00 283.89 324.50 -
36 350 +6.50 -29.5 1135 1017.5 567.50 339.17 53.43 179.00 335.07 388.50 -
36 400 +6.50 -29.5 1315 1160 657.50 386.67 68.87 204.00 384.63 453.50 -
42 300 +6.50 -35.5 1375 1300 687.50 433.33 47.38 153.00 487.12 534.50 -
42 350 +6.50 -35.5 1620 1500 810.00 500.00 62.34 179.00 568.66 631.00 -
42 400 +6.50 -35.5 1865 1700 932.50 566.67 80.34 204.00 648.16 728.50 -
8 BH-12 18 300 +6.50 -11.5 25 25 12.50 8.33 20.31 153.00 -160.81 -140.50 unusable
18 400 +6.50 -11.5 25 25 12.50 8.33 34.43 204.00 -225.93 -191.50 unusable
24 300 +6.50 -17.5 155 125 77.50 41.67 27.08 153.00 -102.58 -75.50 unusable
24 350 +6.50 -17.5 202.5 150 101.25 50.00 35.62 179.00 -113.37 -77.75 unusable
24 400 +6.50 -17.5 250 175 125.00 58.33 45.91 204.00 -124.91 -79.00 unusable
30 300 +6.50 -23.5 475 400 237.50 133.33 33.84 153.00 50.66 84.50 -
30 350 +6.50 -23.5 575 460 287.50 153.33 44.53 179.00 63.97 108.50 -
30 400 +6.50 -23.5 675 520 337.50 173.33 57.39 204.00 76.11 133.50 -
36 300 +6.50 -29.5 900 795 450.00 265.00 40.61 153.00 256.39 297.00 -
36 350 +6.50 -29.5 1075 922.5 537.50 307.50 53.43 179.00 305.07 358.50 -
36 400 +6.50 -29.5 1250 1050 625.00 350.00 68.87 204.00 352.13 421.00 -
42 300 +6.50 -35.5 1250 1200 625.00 400.00 47.38 153.00 424.62 472.00 -
42 350 +6.50 -35.5 1502.5 1392.5 751.25 464.17 62.34 179.00 509.91 572.25 -
42 400 +6.50 -35.5 1755 1585 877.50 528.33 80.34 204.00 593.16 673.50 -
Lalang Landing
9 BH-20 18 300 +6.50 -11.5 310 240 155.00 80.00 20.31 134.69 155.00
18 400 +6.50 -11.5 450 325 225.00 108.33 34.43 190.57 225.00
24 300 +6.50 -17.5 585 445 292.50 148.33 27.08 265.42 292.50
24 400 +6.50 -17.5 850 680 425.00 226.67 45.91 379.09 425.00
30 300 +6.50 -23.5 795 730 397.50 243.33 33.84 363.66 397.50
30 400 +6.50 -23.5 1095 965 547.50 321.67 57.39 490.11 547.50
36 300 +6.50 -29.5 1195 1090 597.50 363.33 40.61 556.89 597.50
36 400 +6.50 -29.5 1640 1455 820.00 485.00 68.87 751.13 820.00
42 300 +6.50 -35.5 1570 1480 785.00 493.33 47.38 737.62 785.00
42 400 +6.50 -35.5 2150 1960 1075.00 653.33 80.34 994.66 1075.00
Square Piles
Dimension200x200mm Dimension250x250mm Dimension300x300mm
H= 200mm= 0.200m H= 250mm= 0.250m H= 300mm= 0.300m
H
B= 200mm= 0.200m B= 250mm= 0.250m B= 300mm= 0.300m
weight= 100kg/m= 0.981KN/m weight= 156kg/m= 1.530KN/m weight= 225kg/m= 2.207KN/m
2 BH-8 12 200 x 200 +9.50 -2.5 270 250 135.00 83.33 11.77 123.23 135.00 -
12 250 x 250 +9.50 -2.5 355 312.5 177.50 104.17 18.36 159.14 177.50 -
12 300 x 300 +9.50 -2.5 440 375 220.00 125.00 26.49 193.51 220.00 -
Pulau gading
3 BH-10 12 200 x 200 +6.50 -5.5 10 0 5.00 0.00 11.77 130.00 -136.77 -125.00 unusable
12 250 x 250 +6.50 -5.5 10 0 5.00 0.00 18.36 162.00 -175.36 -157.00 unusable
12 300 x 300 +6.50 -5.5 10 0 5.00 0.00 26.49 195.00 -216.49 -190.00 unusable
18 200 x 200 +6.50 -11.5 112.5 50 56.25 16.67 17.66 130.00 -91.41 -73.75 unusable
18 250 x 250 +6.50 -11.5 150 75 75.00 25.00 27.55 162.00 -114.55 -87.00 unusable
18 300 x 300 +6.50 -11.5 187.5 100 93.75 33.33 39.73 195.00 -140.98 -101.25 unusable
24 200 x 200 +6.50 -17.5 325 250 162.50 83.33 23.54 130.00 8.96 32.50 unusable
24 250 x 250 +6.50 -17.5 450 300 225.00 100.00 36.73 162.00 26.27 63.00 unusable
24 300 x 300 +6.50 -17.5 570 370 285.00 123.33 52.97 195.00 37.03 90.00 -
4 BH-11 12 200 x 200 +6.50 -5.5 0 0 0.00 0.00 11.77 130.00 -141.77 -130.00 unusable
12 250 x 250 +6.50 -5.5 0 0 0.00 0.00 18.36 162.00 -180.36 -162.00 unusable
12 300 x 300 +6.50 -5.5 0 0 0.00 0.00 26.49 195.00 -221.49 -195.00 unusable
18 200 x 200 +6.50 -11.5 75 60 37.50 20.00 17.66 130.00 -110.16 -92.50 unusable
18 250 x 250 +6.50 -11.5 112.5 75 56.25 25.00 27.55 162.00 -133.30 -105.75 unusable
18 300 x 300 +6.50 -11.5 150 90 75.00 30.00 39.73 195.00 -159.73 -120.00 unusable
24 200 x 200 +6.50 -17.5 225 190 112.50 63.33 23.54 130.00 -41.04 -17.50 unusable
24 250 x 250 +6.50 -17.5 290 235 145.00 78.33 36.73 162.00 -53.73 -17.00 unusable
24 300 x 300 +6.50 -17.5 337.5 280 168.75 93.33 52.97 195.00 -79.22 -26.25 unusable
5 BH-12 12 200 x 200 +6.50 -5.5 0 0 0.00 0.00 11.77 130.00 -141.77 -130.00 unusable
12 250 x 250 +6.50 -5.5 0 0 0.00 0.00 18.36 162.00 -180.36 -162.00 unusable
12 300 x 300 +6.50 -5.5 0 0 0.00 0.00 26.49 195.00 -221.49 -195.00 unusable
18 200 x 200 +6.50 -11.5 25 10 12.50 3.33 17.66 130.00 -135.16 -117.50 unusable
18 250 x 250 +6.50 -11.5 25 10 12.50 3.33 27.55 162.00 -177.05 -149.50 unusable
18 300 x 300 +6.50 -11.5 25 10 12.50 3.33 39.73 195.00 -222.23 -182.50 unusable
24 200 x 200 +6.50 -17.5 135 100 67.50 33.33 23.54 130.00 -86.04 -62.50 unusable
24 250 x 250 +6.50 -17.5 180 130 90.00 43.33 36.73 162.00 -108.73 -72.00 unusable
24 300 x 300 +6.50 -17.5 220 160 110.00 53.33 52.97 195.00 -137.97 -85.00 unusable
Lalang Landing
1 BH-04 18 16 +9.50 -8.5 300 225 150.00 75.00 20.31 129.69 150.00
18 20 +9.50 -8.5 415 282.5 207.50 94.17 20.76 186.74 207.50
18 24 +9.50 -8.5 530 340 265.00 113.33 24.96 240.04 265.00
24 16 +9.50 -14.5 675 460 337.50 153.33 27.08 310.42 337.50
24 20 +9.50 -14.5 927.5 567.5 463.75 189.17 27.68 436.07 463.75
24 24 +9.50 -14.5 1180 675 590.00 225.00 33.28 556.72 590.00
30 16 +9.50 -20.5 990 780 495.00 260.00 33.84 461.16 495.00
30 20 +9.50 -20.5 1335 980 667.50 326.67 34.60 632.90 667.50
30 24 +9.50 -20.5 1680 1180 840.00 393.33 41.60 798.40 840.00
36 16 +9.50 -26.5 1330 1210 665.00 403.33 40.61 624.39 665.00
36 20 +9.50 -26.5 1715 1517.5 857.50 505.83 41.51 815.99 857.50
36 24 +9.50 -26.5 2100 1825 1050.00 608.33 49.92 1000.08 1050.00
42 16 +9.50 -32.5 1880 1725 940.00 575.00 47.38 892.62 940.00
42 20 +9.50 -32.5 2425 2157.5 1212.50 719.17 48.43 1164.07 1212.50
42 24 +9.50 -32.5 2970 2590 1485.00 863.33 58.24 1426.76 1485.00