Professional Documents
Culture Documents
1 LT-1 BJ/KJ
Sanctioned Load Fixed Charge (FC)
FC For Ist KW
FC For addl. KW
0 to 30 KWH
31 to 100 KWH
Domestic - Applicable
to Areas under Bruhat
Bangalore Mahangara
Palike
(BBMP),Municipal
Corporations and all
2 LT-2(a)(i) Urban Local Bodies
Sanctioned Load Fixed Charge (FC)
FC For Ist KW
FC For addl. KW
0 to 30 KWH
31 to 100 KWH
Domestic Applicable
to Areas under Village
3 LT-2(a)(ii) Panchayats
Pvt. Educational Sanctioned Load Fixed Charge (FC)
Institutions & Pvt.
Hospitals and Nursing
Homes: Applicable to FC per KW
Areas under Bruhat
Bangalore Mahanagara FC Minimum per Month
Palike (BBMP),
Municipal Corporations
and all areas coming Consumption Energy Charges (EC)
iunder Urban Local
Bodies 0 to 200 KWH
FC per KW
0 to 50 KWH
Above 50 KWH
Above 50 KWH
Energy Charges
67 HP & above
Heating and Motive
Power: Applicable to
Demand Based Tariff (Optional)
Areas under Bruhat
Bangalore Mahanagara
Palike and Municipal Above 5 HP but below 40 HP
12 LT-5 (a) Corporations.
40 HP & above but below 67 HP
67 HP & above
0 to 500 KWH
5 HP & below
67 HP & above
67 HP & above
0 to 500 KWH
EC per KWH
FC per KW
EC per KWH
EC per KWH
Demand Charges (DC) per KVA
HT Industrial:
Applicable to Areas Consumption Energy Charges (EC)
under Bruhat
Bangalore Mahanagara 0 to 1 Lakh KWH
Palike and Municipal
Corporations.
Above 1 Lakh KWH
19 HT-2(a)(i)
Applicable to Demand Charges (DC) per KVA
Bangalore
Metropolitan Railway
20 HT-2(a)(i) Corporation Ltd. Consumption Energy Charges (EC)
(BMRCL).
HT Industrial:
0 to 1 Lakh KWH
Applicable to Areas
other than those
covered under HT-2(a) Above 1 Lakh KWH
21 HT-2(a)(ii) (i)
Demand Charges (DC) per KVA
HT Commercial
Applicable to Areas Consumption
other than those
covered under HT-2(b) 0 to 2 Lakhs KWH
(i)
Above 2 Lakhs KWH
24 HT-2(b)(ii)
Applicable to Demand Charges (DC)per KVA
Government Hospitals
& Hospitals run by 0 to 1 Lakh KWH
Charitable Institutions
& ESI Hospitals and
Educational
Institutions belonging
to Govt. , Local Bodies
25 HT-2(C)(i) & Aided Institutions
and Hostels of all
Educational
Applicable to
Government Hospitals
& Hospitals run by
Charitable Institutions
& ESI Hospitals and
Educational
Institutions belonging Above 1 Lakh KWH
to Govt. , Local Bodies
25 HT-2(C)(i) & Aided Institutions
and Hostels
Applicable of all
to Hospitals Demand Charges (DC)per KVA
Educational
and Educational
Institutions,
Institutions other than 0 to 1 Lakh KWH
those covered under
26 HT-2(C)(ii) HT2(C) (i)
Above 1 Lakh KWH
Existing ToD
Energy Charges
Energy Charges
GH TENSION SUPPLY
Consumption
200 Ps subject to Min. EC per KWH and Annual Minimum 225 Ps subject to Min.
of Rs. 1120/- per HP per of Rs. 1240/- per HP per
annum annum
400 Ps subject to Min. EC per KWH and Annual Minimum 425 Ps subject to Min.
of Rs. 1120/- per HP per of Rs. 1240/- per HP per
annum Rs 110/- DC per KVA annum Rs.120
Rs. 220/HP/Month for Fixed Charges/ Demand Charges Rs. 240/HP/Month for
the entire sanctioned the entire sanctioned
load / Contract demand load / Contract demand
950 Ps Energy Charges 1000 Ps