Retail Supply Tariff approved by KERC in Tariff Order 2017-18 Dated: 1

Sl.N Tariff Category


o Category Particulars
Description
LOW TENSION SUPPLY

Fully subsidized by GOK

Monthly Min. per Installation per


Month.

CDT(Commission Determined Tariff) EC


per KWH (Upto 18 units/ month)

1 LT-1 BJ/KJ
Sanctioned Load Fixed Charge (FC)

FC For Ist KW

FC For addl. KW

Consumption Energy Charges (EC)

0 to 30 KWH

31 to 100 KWH

101 to 200 KWH

Above 200 KWH

Domestic - Applicable
to Areas under Bruhat
Bangalore Mahangara
Palike
(BBMP),Municipal
Corporations and all
2 LT-2(a)(i) Urban Local Bodies
Sanctioned Load Fixed Charge (FC)

FC For Ist KW

FC For addl. KW

Consumption Energy Charges (EC)

0 to 30 KWH

31 to 100 KWH

101 to 200 KWH


Above 200 KWH

Domestic Applicable
to Areas under Village
3 LT-2(a)(ii) Panchayats
Pvt. Educational Sanctioned Load Fixed Charge (FC)
Institutions & Pvt.
Hospitals and Nursing
Homes: Applicable to FC per KW
Areas under Bruhat
Bangalore Mahanagara FC Minimum per Month
Palike (BBMP),
Municipal Corporations
and all areas coming Consumption Energy Charges (EC)
iunder Urban Local
Bodies 0 to 200 KWH

above 200 KWH


4 LT-2(b)(i)
Sanctioned Load Fixed Charge (FC)

FC per KW

FC Minimum per Month

Consumption Energy Charges (EC)


Pvt. Educational
Institutions and Pvt. 0 to 200 KWH
Hospital & Nursing
Homes - Applicable to
Areas coming under above 200 KWH
5 LT-2(b)(ii) Village Panchayats
Sanctioned Load Fixed Charge (FC)

Consumption Energy Charges (EC)

0 to 50 KWH

Above 50 KWH

Demand Based Tariff (Optional)

Fixed charges per month per KW


Commercial:
Applicable to areas Energy Charges
coming under Bruhat
Bangalore Mahangara For first 50 units
Palike (BBMP),
Municipal Corporations
and all Urban Local For the balance units
6 LT-3(i) Bodies
Sanctioned Load Fixed Charge (FC)/KW

Consumption Energy Charges (EC)


0 to 50 KWH

Above 50 KWH

Demand Based Tariff (Optional)

Fixed charges per month per KW

Energy Charges

For first 50 units


Commercial Applicable
to Areas coming under For the balance units
7 LT-3(ii) Village Panchayats
Commission Determined Tariff (CDT)
IP Sets 10 HP &
8 LT-4(a)
Below 286 Ps per KWH

9 LT-4(b) Applicable to IP Sets FC per HP


Above 10 HP
EC per KWH

Applicable to Hor. FC per HP


Nur., Coffee, Tea &
10 LT-4(c)(i) Rubber: 10 HP & Below EC per KWH

Applicable to Hor. FC per HP


Nur.,
Coffee, Tea & Rubber: EC per KWH
Above 10 HP
11 LT-4(c)(ii)
Sanctioned Load Fixed Charge
(FC)/HP
5 HP & below

Above 5 HP but below 40 HP

40 HP & above but below 67 HP

67 HP & above
Heating and Motive
Power: Applicable to
Demand Based Tariff (Optional)
Areas under Bruhat
Bangalore Mahanagara
Palike and Municipal Above 5 HP but below 40 HP
12 LT-5 (a) Corporations.
40 HP & above but below 67 HP

67 HP & above

Consumption Energy Charges (EC)

0 to 500 KWH

Above 500 KWH


Sl.N Tariff Category
o Category Particulars
Description
Sanctioned Load Fixed Charge
(FC)/HP

5 HP & below

Above 5 HP but below 40 HP

40 HP & above but below 67 HP

67 HP & above

Demand Based Tariff (Optional

Above 5 HP but below 40 HP

40 HP & above but below 67 HP

67 HP & above

Consumption Energy Charges (EC)

0 to 500 KWH

501 to 1000 KWH


Heating and Motive
Power Applicable all
Areas other than those Above 1000 KWH
13 LT-5(b) covered under LT5(a)
14 LT-6 (a) Water Supply FC per HP

EC per KWH

FC per KW

EC per KWH

EC per KWH to LED/ Induction


Lightning
15 LT-6 (b) Public Lighting
Temporary Power Less than 67 HP Weekly Min.per.KW
Supply for all purposes
16 LT-7(a)
EC per KWH

17 LT-7(b) Hoarding & Fixed charges per month per KW


Adveristment :Power
Supply on permanent EC per KWH
connection basis

HIGH TENSION SUPPLY

18 HT-1 HT Water Supply DC per KVA

EC per KWH
Demand Charges (DC) per KVA
HT Industrial:
Applicable to Areas Consumption Energy Charges (EC)
under Bruhat
Bangalore Mahanagara 0 to 1 Lakh KWH
Palike and Municipal
Corporations.
Above 1 Lakh KWH
19 HT-2(a)(i)
Applicable to Demand Charges (DC) per KVA
Bangalore
Metropolitan Railway
20 HT-2(a)(i) Corporation Ltd. Consumption Energy Charges (EC)
(BMRCL).

Demand Charges (DC) per KVA

Consumption Energy Charges (EC)

HT Industrial:
0 to 1 Lakh KWH
Applicable to Areas
other than those
covered under HT-2(a) Above 1 Lakh KWH
21 HT-2(a)(ii) (i)
Demand Charges (DC) per KVA

Railway Traction and


HT-2(a)(i) and
22 Effluent Treatment Consumption Energy Charges (EC) per
HT-2(a)(ii)
Plants KWH

Demand Charges (DC) per KVA

HT Commercial Arears Consumption Energy Charges (EC)


under Bruhat
Bangalore Mahanagara
Palike and Municipal 0 to 2 Lakhs KWH
Corporations.
Above 2 Lakhs KWH
23 HT-2(b)(i)
Demand Charges (DC) per KVA

HT Commercial
Applicable to Areas Consumption
other than those
covered under HT-2(b) 0 to 2 Lakhs KWH
(i)
Above 2 Lakhs KWH
24 HT-2(b)(ii)
Applicable to Demand Charges (DC)per KVA
Government Hospitals
& Hospitals run by 0 to 1 Lakh KWH
Charitable Institutions
& ESI Hospitals and
Educational
Institutions belonging
to Govt. , Local Bodies
25 HT-2(C)(i) & Aided Institutions
and Hostels of all
Educational
Applicable to
Government Hospitals
& Hospitals run by
Charitable Institutions
& ESI Hospitals and
Educational
Institutions belonging Above 1 Lakh KWH
to Govt. , Local Bodies
25 HT-2(C)(i) & Aided Institutions
and Hostels
Applicable of all
to Hospitals Demand Charges (DC)per KVA
Educational
and Educational
Institutions,
Institutions other than 0 to 1 Lakh KWH
those covered under
26 HT-2(C)(ii) HT2(C) (i)
Above 1 Lakh KWH

27 HT-3 (a)(i) HT Lift Irrigation EC per KWH and Annual Minimum


Schemes under
Government
Depts./Corporations.

HT Private Lift F.C. per HP /PM


Irrigation
Schemes/Societies : E.C. per KWH
28 HT-3 (a)(ii)
Connected to Urban /
Express feeders

HT Private Lift F.C. per HP/PM


Irrigation Schemes
/Societies other than
those covered under
29 HT-3 (a)(iii) E.C. per KWH
HT-3 (a)(ii) (Not
Connected to Urban /
Express feeders)

HT supply to EC per KWH and Annual Minimum


30 HT-3 (b) Agriculture/
HTHorticulture Farms
Res. Apartments DC per KVA
Applicable to all areas
31 HT-4
EC per KWH

Fixed Charges/ Demand Charges

32 HT-5 Temporary Supply


Energy Charges

Temporary Supply Weekly Min. per KW


(Bangalore
33 HT-5 (a) International
Exhibition Centre). EC per KWH

Existing ToD

Time of day Increase(+)/reduction(-) in energy


charges over the normal tariff
applicable

22.00Hrs to 06.00Hrs (-)125 paise per Unit


06.00Hrs to18.00Hrs 0

18.00Hrs to 22.00Hrs (+)100 paise per unit


in Tariff Order 2017-18 Dated: 11.04.2017 for BESCOM

Existing Tariff as Approved as per


per Tariff Order- Particulars Tariff Order 2017
2016
OW TENSION SUPPLY

Fully subsidized by GOK


Free Free

Rs 30/- Monthly Min. per Installation per Rs 30/-


Month.

596 Paise CDT(Commission Determined Tariff) 648 Paise


EC per KWH (Upto 40 units/ month)

Sanctioned Load Fixed Charge (FC)

Rs.30/- FC For Ist KW Rs.40

Rs.40/- FC For addl. KW Rs.50

Consumption Energy Charges (EC)

300 Ps 0 to 30 KWH 325 Ps

440 Ps 31 to 100 KWH 470 Ps

590 Ps 101 to 200 KWH 625 Ps

690 Ps 201 to 300 KWH 730 Ps

301 to 400 KWH 735 Ps

401 to 500 KWH 740 Ps

Above 500 KWH 740 Ps

Sanctioned Load Fixed Charge (FC)

Rs.20/- FC For Ist KW Rs.25

Rs.30/- FC For addl. KW Rs.40

Consumption Energy Charges (EC)

290 Ps 0 to 30 KWH 315 Ps

410 Ps 31 to 100 KWH 440 Ps

560 Ps 101 to 200 KWH 595 Ps


640 Ps 201 to 300 KWH 680 Ps

301 to 400 KWH 685 Ps

401 to 500 KWH 685 Ps

Above 500 KWH 685 Ps

Sanctioned Load Fixed Charge (FC)

Rs.45/- FC per KW Rs.55

Rs.75/- FC Minimum per Month Rs.85

Consumption Energy Charges (EC)

625 Ps 0 to 200 KWH 650 Ps

745 Ps above 200 KWH 775 PS

Sanctioned Load Fixed Charge (FC)

Rs.35/- FC per KW Rs.45

Rs.60/- FC Minimum per Month Rs.70

Consumption Energy Charges (EC)

570 Ps 0 to 200 KWH 595 Ps

690 Ps above 200 KWH 720 Ps

Rs.50/- Sanctioned Load Fixed Charge (FC) Rs.60

Consumption Energy Charges (EC)

715 Ps 0 to 50 KWH 750 Ps

815 Ps Above 50 KWH 850 Ps

sed Tariff (Optional) Demand Based Tariff (Optional)

Rs.65 per KW Fixed charges per month per KW Rs.75 per KW

Energy Charges

715 paise For first 50 units 750 paise

815 paise For the balance units 850 paise

Rs.40/- Sanctioned Load Fixed Charge Rs.50


(FC)/KW
Consumption Energy Charges (EC)
665 Ps 0 to 50 KWH 700 Ps

765 Ps Above 50 KWH 800 Ps

sed Tariff (Optional)

Rs.55 per KW Fixed charges per month per KW Rs.65 per KW

Energy Charges

665 paise For first 50 units 700 paise

765 paise For the balance units 800 paise

FC per HP Commission Determined Tariff (CDT) Nil

286 Ps per KWH 286 Ps per KWH 334

Rs 40/- FC per HP Rs.50

280 Ps EC per KWH 300 Ps

Rs.30/- FC per HP Rs.40

280 Ps EC per KWH 300 Ps

Rs.40/- FC per HP Rs.50

280 Ps EC per KWH 300 Ps

Sanctioned Load Fixed Charge


(FC)/HP
Rs.35/- 5 HP & below Rs.40

Rs.35/- Above 5 HP but below 40 HP Rs.45

Rs.45/- 40 HP & above but below 67 HP Rs.60

Rs.110/- 67 HP & above Rs.120

sed Tariff (Optional)

Rs.55/- Above 5 HP but below 40 HP Rs.65/-

Rs.75/- 40 HP & above but below 67 HP Rs.90/-

Rs.160/- 67 HP & above Rs.170/-

Consumption Energy Charges (EC)

510 Ps 0 to 500 KWH 525 Ps

630 Ps Above 500 KWH 650 Ps


Existing Tariff as Approved as per
per Tariff Order- Particulars Tariff Order 2017
2016 Sanctioned Load Fixed Charge
(FC)/HP

Rs.30/- 5 HP & below Rs.35

Rs.35/- Above 5 HP but below 40 HP Rs.40

Rs.40/- 40 HP & above but below 67 HP Rs.55

Rs.100/- 67 HP & above Rs.110

sed Tariff (Optional

Rs.50/- Above 5 HP but below 40 HP Rs.55/-

Rs.65/- 40 HP & above but below 67 HP Rs.80/-

Rs.150/- 67 HP & above Rs.160/-

Consumption Energy Charges (EC)

485 Ps 0 to 500 KWH 500 Ps

570 Ps 501 to 1000 KWH 590 Ps

600 Ps Above 1000 KWH 620 Ps

Rs.45/- FC per HP Rs.55

390 Ps EC per KWH 425 Ps

Rs.60/- FC per KW Rs.70

550 Ps EC per KWH 585 Ps

450 Ps EC per KWH to LED/ Induction 485 Ps


Lightning

Rs.170/- Less than 67 HP Weekly Min.per.KW Rs.190

950 Ps EC per KWH 1000 Ps

Rs.50/- Fixed charges per month per KW Rs.60

950 Ps EC per KWH 1000 Ps

GH TENSION SUPPLY

Rs.190/- DC per KVA Rs.200

450 Ps EC per KWH 485 Ps


Rs.190/- Demand Charges (DC) per KVA Rs.210

Consumption Energy Charges (EC)

625 Ps 0 to 1 Lakh KWH 665 Ps

675 Ps Above 1 Lakh KWH 695 Ps

Rs.190/- Demand Charges (DC) per KVA Rs.210

570 Ps Consumption Energy Charges (EC) 600 Ps

Rs.180/- Demand Charges (DC) per KVA Rs.200

Consumption Energy Charges (EC)

620 Ps 0 to 1 Lakh KWH 660 Ps

660 Ps Above 1 Lakh KWH 680 Ps

Rs.190/- Demand Charges (DC) per KVA Rs.210/-

590 Ps Consumption Energy Charges (EC) per 620 Ps


KWH

Rs.210/- Demand Charges (DC) per KVA Rs.230

Consumption Energy Charges (EC)

805 Ps 0 to 2 Lakhs KWH 845 Ps

835 Ps Above 2 Lakhs KWH 855 Ps

Rs.200/- Demand Charges (DC) per KVA Rs.220

Consumption

785 Ps 0 to 2 Lakhs KWH 825 Ps

815 Ps Above 2 Lakhs KWH 835 Ps

Rs.180/- Demand Charges (DC)per KVA Rs.200

600 Ps 0 to 1 Lakh KWH 640 Ps


650 Ps Above 1 Lakh KWH 680 Ps

Rs.180/- Demand Charges (DC)per KVA Rs.200

700 Ps 0 to 1 Lakh KWH 740 Ps

750 Ps Above 1 Lakh KWH 780 Ps

200 Ps subject to Min. EC per KWH and Annual Minimum 225 Ps subject to Min.
of Rs. 1120/- per HP per of Rs. 1240/- per HP per
annum annum

Rs.40/- F.C. per HP /PM Rs.50

200 Ps E.C. per KWH 225 Ps

Rs.20/- F.C. per HP/PM Rs.30

200 Ps E.C. per KWH 225 Ps

400 Ps subject to Min. EC per KWH and Annual Minimum 425 Ps subject to Min.
of Rs. 1120/- per HP per of Rs. 1240/- per HP per
annum Rs 110/- DC per KVA annum Rs.120

585 Ps EC per KWH 620 Ps

Rs. 220/HP/Month for Fixed Charges/ Demand Charges Rs. 240/HP/Month for
the entire sanctioned the entire sanctioned
load / Contract demand load / Contract demand
950 Ps Energy Charges 1000 Ps

No Weekly Minimum Weekly Min. per KW No Weekly Minimum


charges charges
1050 paise EC per KWH 1100 Ps

Proposed ToD Approved ToD

Time of day Increase(+)/reduction(-) in energy


charges over the normal tariff
applicable

06.00Hrs to 10.00Hrs (+)100 paise per Unit


10.00Hrs to18.00Hrs 0

18.00Hrs to 22.00Hrs (+)100 paise per unit

22.00Hrs to 06.00Hrs (-)100 paise per unit