You are on page 1of 1

ANNEXURE-2

Metering Point and Evacuation Schematic

The metering system will be confining to Indian Grid Code, Requirement of RRVPNL. It is proposed
to install electronic energy meters (Main and Check) of class 0.2s accuracy at interconnection point
(220/33 kV Pooling Substation) with RRVPNL Grid Substation. Individual tariff meters (Main and
Check) shall also be installed at Plant end (at incoming 33kV switchgear of the North Block Pooling
Substation) of ABT type. The associated current transformers (CTs) and potential transformers
(PTs) shall also be of class 0.2s and 0.2 accuracy respectively.

The Energy billing and invoicing will be based on meter reading at 220kV incoming of 400/220 kV
RRVPNL Grid substation and energy accounting among individual plots will be based on meter
reading at 33kV switchgear from individual plots.

Remote Transmitting Unit (RTU) shall also be installed at 220/33 kV Pooling Substations for
transferring real time data to SLDC for its monitoring purpose

400/220 kV
RRVPNL Grid
Substation

Metering at 220 kV
220 kV Double

incoming at RRVPNL Grid M


Circuit Line

substation for Metering and


billing

Energy meter at 33 kV
North Block Pooling Substation incoming of pooling
4X100 MVA substation
(Switchgear) for
energy accounting
M
33kV Switchgear

M M M M
...33 kv Triple Circuit Line...

Plot 1 Plot 2 Plot 3 Plot 4 Plot 5

Figure 1 Block Diagram of Evacuation Scheme and metering