Project
Proj Description
Client No
Location
Proj. Designer
Soil Report
Architectural
Mechanical
References
Sanitary
Electrical
Others
A SHEET COUNTS
Work Per
SERIES
S001
S100
S101
S102
S103
ERIES
S103
S100 SERIES
S104
S105
S106
S107
S108
S109
S110
S111
S112
S200
S200 SERIES
S201
S202
S203
S210
S220
S230
S240
S300
S301
S302
RESIDENCES
S304
S305
S306
S300 SERIES
S307
S308
S309
S309
S325
S326
TAFT
S331
S332
S341
S342
ONE
S343
S344
S400
S401
S402
S403
S404
S405
S406
S407
S408
S409
ERIES
S400 SERIES
S410
S411
S412
S413
S414
S415
S416
S417
S418
S419
S420
S421
S422
S500 SERIES
S500
S510
S511
S520
S530
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
Proj Description
Client No
Location
Proj. Designer
Soil Report
Architectural
Mechanical
References
Sanitary
Electrical
Others
A SHEET COUNTS
Work Per
SERIES
S001
S000 SERIES
S002
S003
S004
S005
S006
S007
SA00
SA01
S100
S101
S102
S103
S104
S105
S100 SERIES
S106
S107
S108
S109
S110
S111
S112
S113
S114
S115
S116
S117
S201
S202
S203
S204
S205
S206
S207
S208
S211
S212
S221
S222
S223
S224
S225
S226
S200 SERIES
S227
S228
S231
S251
S252
S261
S262
S263
S264
S271
S272
S281
S282
S283
S284
S285
S286
S287
S287A
S288
S291
S301
S302
S303
S304
S
S305
S306
S300 SERIES
S307
S308
S309
S309
S325
S326
S331
S332
S341
S342
S343
S344
IMPERIUM
S400
S401
S402
S402A
S403
S403A
THE
S404
S404A
S405
S405A
S406
S406A
S406B
S407
S407A
S408
S408A
S409
S409A
S410
S410A
S410B
S411
S411A
S411B
S412
S412A
S412B
S 04 0 S E R I E S
S413
S413A
S413B
S414
S414A
S414B
S415
S415A
S415B
S416
S416A
S416B
S417
S417A
S417B
S418
S418A
S418B
S419
S419A
S420
S420A
S421
S421A
S422
S422A
S423
S423A
S424
S424A
S425
S426
S427
S428
S500
S501
S502
S503
S504
S505
S500 SERIES
S506
S507
S508
S500 SER
S509
S510
S511
S512
S520
S521
S530
S531
S600
S601
S600 SER IES
S602
S603
S604
S605
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
D PRINTING AND DOCUMENTATION
LEGEND
Proj Description
Client No
Location
Proj. Designer
Soil Report
Architectural
Mechanical
References
Sanitary
Electrical
Others
A SHEET COUNTS
Work Per
S000 SERIES
S000
S001
SA00 SERIES
SA01
SA02
SA03
SA04
S100
S101
S102
S103
S104
S105
S106
S107
S108
S109
S110
S111
S100 SERIES
S112
S113
S114
S115
S116
S117
S118
S119
S120
S121
S122
S123
S124
S125
S126
S200
S201
S202
S203
S204
S210
S211
S212
S213
S214
S200 SERIES
S215
S216
S217
S218
S219
S220
S221
S222
S223
S224
S225
SYMPHONI
S226
S222
S223
S224
S225
S226
SYM
S227
S228
S229
S300
S301
S302
S303
S304
S305
S306
S300 SERIES
S307
S308
S309
S310
S311
S312
S313
S314
S315
S316
S317
S318
S319
S400
S401
S402
S403
S404
S405
S406
S400 SERIES
S407
S408
S409
S410
S411
S412
S413
S414
S420
S421
S500
S501
S5 00 SERIES
S502
S530
S531
S532
S540
S541
S542
S543
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
Client No
Location
Proj. Designer
Soil Report
Architectural
Mechanical
References
Sanitary
Electrical
Others
A SHEET COUNTS
Work Per
S-001
S-A100
S-A101
BUILDING A
BUILDING A
S-A102
S-A200
S-A201
S-A202
S-A203
S-A204
S-B100
BUILDING B
S-B101
S-B102
S-B103
S-B200
S-B201
BUILDING C
S-C100
S-C101
S-C200
S-C201
BUILDING D
S-D100
S-D101
S-D102
S-D200
S-D201
S-E100
S-E101
S-E102
BUILDING E
S-E103
S-E104
S-E105
S-E106
S-E200
S-E201
S-E202
S-F100
S-F101
BUILDING F
S-F102
S-F103
S-F104
S-F105
S-F200
S-F201
S-F202
S-G100
S-G101
S-G102
BUILDING G
S-G103
S-G200
S-G201
S-G202
S-G200
S-G201
S-G202
S-H100
BUILDING H
S-H101
S-H102
S-H103
S-H200
S-H201
S-I100
BUILDING I
S-I101
S-I102
S-I103
S-I104
BUILDI
S-II05
S-II06
S-I200
S-J100
BUILDING J S-J101
S-J102
S-J103
S-J104
S-J200
TH E PLAYG R O U N D
S-J201
S-K100
BUILDING K
S-K101
S-K102
S-K103
S-K200
S-K201
S-L100
S-L101
BUILDING L
S-L102
S-L103
S-L104
S-L105
S-L200
S-L201
S-M100
S-M101
S-M102
S-M103
BUILDING M
S-M104
S-M105
S-M106
BUILDING
S-M107
S-M108
S-M109
S-M200
S-M201
S-M202
S-NP100
S-NP101
BUILDING N & P
S-NP102
S-NP103
S-NP104
S-NP105
S-NP200
S-NP201
S-NP202
S-NP203
BUILDING O
S-O100
S-O101
S-O200
BUILDING Q
S-Q100
S-Q101
S-Q201
S-R100
S-R101
BUILDING R
S-R102
S-R103
S-R104
S-R105
BUILDIN
S-R106
S-R201
S-R202
BUILDING S
S-S100
S-S101
S-S200
S-300
S-301
DETAIL
S-302
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
Sanitary
Electrical
Others
A SHEET COUNTS
Work Percentage
ST000 SERIES
ST000
S0000 STANDARD STRUCTURAL NOTES
ST001
LEX
S0000
PROPOSED 7-STOREY OFFICE BUILDING COMPLEX
ST100 SERIES
ST100
ST100A
ST101
ST101A
ST100 SERIES FRAMING PLANS
ST102
ST102A
ST103
S103A
ST104
ST104A
ST105
ST105A
ST106
ST106A
ST107
ST107A
ST20
ST200 SERIES
ST200
SERIES 200 VERTICAL COMPONENTS
S200A
ST201
ST201A
ST202
SERIES
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND
Client No
Location
PrjDes
Soil Report
Architectural
References
Mechanical
Sanitary
Electrical
Others
A SHEET COUNTS
Work Percenta
S0000 SERIES
STANDARD STRUCTURAL NOTES
S001
S011
S031
S041
S051
S061
ICAL COMPONENTS SERIES 100 - FRAMING PLAN SA00 SERIES EXCAVATION S0000 STANDARD STRU
0000
S202
S201
S200
S104
S103
S102
S101
S100
S000
S200 SERIES
S100 SERIES
SA00 SERIES
LA SALLETE SCHOOL BUILDING
AB AND / OR ROOF COMPONENTES SERIES - 300 BEAM COMPONENTS SERIES - 200 VERTICAL COMPONE
S403
S402
S401
S400
S300
S300 SERIES
S500 SERIES
SERIES - 400 SLAB AND / OR RO
S500 SERIES
SERIES - 500 A&E: MEPS COMPONENTS: STEEL
S500
S501
S510
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
Client No
Location
PrjDes
Soil Report
Architectural
References
Mechanical
Sanitary
Electrical
Others
A SHEET COUNTS
Work Percentage
S000 SERIES
S001
S001A
S002
S003
TES AND TYPICAL DETAILS
S004
S005
S006
S007
S008
S000 SERIES - STANDARD NOTES AND TYPICA
S009
S022
S023
S024
S025
S026
S027
S028
S029
S030
S100 SERIES
S100
S101
S102
S103
S104
S105
S106
S107
S108
S109
S110
S111
S112
S113
S114
S115
S116
S117
S118
S119
S120
S121
S122
S123
S124
S125
S126
S127
S128
S129
S130
S131
S132
S133
SERIES 100 - FRAMING PLANS
S134
S135
S136
S137
S138
S139
S140
S141
SERIES
S142
S143
S144
S145
S146
S147
S148
S149
S150
S151
S152
S153
S154
S155
S156
S157
S158
S159
S160
S161
S162
S163
S164
S165
S166
S167
S168
S169
S170
S171
S172
S173
S174
S175
S176
S200 SERIES
S200
S201
S202
S203
SERIES - 200 COLUMN / FOUNDATION / R.C. WALLS
S204
S205
S206
S207
S208
S209
S210
S211
S300 SERIES
S301.A
S301.B
S301.C
S301.D
S302.A
S302.B
S302.C
S302.D
S303.A
S303.B
S303.C
S303.D
S304.A
S304.B
S304.C
S304.D
S305.A
S305.B
S305.C
S305.D
S306.A
S306.B
S306.C
WER CORE AND MAT FOUNDATION
S306.D
S307
S310
S311
S312
S313
SERIES - 300 TOWER CORE AND
S314
S315
S316
S317
S318
S319
S320
S321
S322
S323
S324
S325
S326
S327
S328
S329
S330
S331
S332
S333
S340
S350
S351
S360
S360.A
S360.B
S360.C
S361
S362
S363
S400 SERIES
S400
S401
S402
S403
S403A
S403B
S404
S404A
S405
S405A
S406
S406A
S407
S407A
S408
S408A
S409
S409A
S410
S410A
S411
S411A
S411B
S412
S412A
S412B
S413
S413A
S413B
S414
S414A
S414B
S415
S415A
S415B
S416
S416A
S416B
S417
S417A
S417B
S418
S418A
S418B
S419
S419A
S419B
S420
S420A
S420B
S421
S421A
S421B
S422
S422A
S422B
S423
S423A
S423B
S424
S424A
S424B
S425
S425A
S425B
S426
S426A
S426B
ROYALTON
S427
S427A
S427B
S428
S428A
S428B
S429
S429A
S429B
S430
S430A
S430B
S431
S431A
S431B
S432
S432A
S432B
S433
S433A
S433B
S434
SERIES - 400 SLAB REINFORCEMENT AND POST TENSIONING
S434A
S434B
S435
S435A
S435B
S436
S436A
S436B
S437
S437A
S437B
S4380
S438A
S438B
S439
S439A
S439B
S440
S440A
S440B
S441
S441A
S441B
S442
S442A
S442B
S443
S443A
S443B
S444
S444A
S444B
S445
S445A
S445B
S446
S446A
S446B
S447
S447A
S447B
S448
S448A
S448B
S449
S449A
S449B
S450
S450A
S450B
S451
S451A
S451B
S452
S452A
S452B
S453
S453A
S453B
S454
S454A
S454B
S455
S455A
S455B
S456
S456A
S456B
S457
S457A
S457B
S458
S458A
S458B
S459
S459A
S459B
S460
S460A
S460B
S461
S461A
S461B
S462
S462A
S462B
S463
S463A
S463B
S464
S464A
S464B
S465
S465A
S465B
S466
S466A
S466B
S467
S467A
S467B
S468
S468A
S468B
S469
S469A
S400 SERIES
S469B
S470
S470A
S470B
ING
SERIES - 400 SLAB REINFORCEMENT AND POST TENSIONINING
S503
S502
S501
S500
S473
S472
S471
S471B
S471A
S500 SERIES
S504
S505
S506
S507
S508
S509
S510
S511
SERIES - 500 MISCELLANEOUS STRUCTURE (CONCRETE)
S512
S513
S520
S521
S522
S523
S524
S525
S526
S530
S531
S532
S533
S534
S535
S536
S537
S538
S539
S540
S541
S542
S543
S550
S551
S552
S553
S600 SERIES
S600
S601
S602
S603
S604
S605
S606
S600 SERIES MISCELLANEOUS STRUCTURE (STEEL)
S607
S600
RS000 SERIES
RS001
RS002
RS003
RS004
RS005
RS006
RS000 SERIES
RS007
RS008
RS009
RS010
RS011
RS012
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
Location
PrjDes
Soil Report
Architectural
References
Mechanical
Sanitary
Electrical
Others
A SHEET COUNTS
Work Percentage
S0000 SERIES
S001
S011
S021
TRUCTURAL NOTES
S031
S041
100 - FRAMING PLAN SA00 SERIES EXCAVATION S0000 STANDARD STRUCTURAL NOTES
A10
A01
S102
S101
S100
S001
S000
S061
S051
S101A
S100A
SA00 SERIES
S100 SERIES
SERIES 100 - FRAMING PLAN
S102A
S103
S104
S105
S200 SERIES
S200
S200A
SERIES - 200 VERTICAL COMPONENTS
S201
S201A
S300 SERIES
S300
AIL
FR OFFICE BUILDING & MULTI LEVEL PARKING
S400
S400 SERIES
ERIES - 500 A&E: MEPS COMPONENTS: CONCRETE SERIES - 400 SLAB AND / OR ROOF COMPO
S500 SERIES
SERIES - 700 MISCELLANEOUS STRUCTURES SERIES - 500 A&E: MEP
S700 SERIES
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
Client No
Location
PrjDes
Soil Report
Architectural
References
Mechanical
Sanitary
Electrical
Others
A SHEET COUNTS
Work Percentage
SERIES 100
S000
S100
SERIES 100
S101
SERIES 100
S102
S103
S104
S105
S106
SERIES 200
S200
S201
SERIES 200
S210
S220
S221
S222
SERIES 300
S300
S301
S302
S303
S304
S305
S306
S307
S308
S309
S310
S311
S312
IO MEMORIAL HOSPITAL
S313
S314
S315
S316
S317
SERIES 300
S318
S319
UPGRADING/ EXPANSION OF ROSARIO MEMORIAL
SERIES 300
S320
S321
S322
S323
S324
S325
S326
S327
S328
S329
S330
S331
S332
S333
S334
S335
S336
S337
S338
SERIES 400
S400
S401
S402
SERIES 400
S403
S404
S405
S420
S421
S430
SERIES 500
S500
SERIES 500
S501
S502
S503
S504
S505
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
Client No
Location
PrjDes
Soil Report
Architectural
References
Mechanical
Sanitary
Electrical
Others
A SHEET COUNTS
Work Percenta
000 SERIES
S001
S002
A00 SERIES
A001
A002
A003
A004
100 SERIES
S100
Z1 S100-F1
Z2 S100-F2
Z3 S100-F3
Z4 S100-F4
S100-C
S100-C1
S100-C2
S100-C3
S100-C4
S101
S101A
S101B
S101C
S101D
S101-S
S101-S1
S101-S2
S101-S3
S101-S4
S102
S102A
S102B
S102C
S102D
S103
S103A
S103B
S103C
S103D
S103E
S104
S104A
S104B
S104C
S104D
S105
S105A
S105B
S105C
S105D
S106
S106A
S106B
S106C
S106D
S107
S107A
S107B
S107C
S107D
S108
S108A
S108B
S108C
S108D
S109
S109A
S109B
S109D
S110
S110A
S110B
S110D
120 SERIES
S120
S121
S122
S123
S124A
S124B
S124C
S124D
S124E
S124F
S125A
S125B
S125C
S125D
S125E
S126A
S126B
S126C
S126D
S127A
S127B
S127C
S127D
130 SERIES
S130
S131
S132
200 SERIES
S200
S200A
S200B
S201
S202
S203
S204
S204A
S204B
S205
S206
S206A
S206B
S207
S208
S209
S209A
S209B
S210
S211
S212
S213
S214
S215
S216
S217
S218
S219
300 SERIES
S300
S300A
S300B
S300C
S300D
S300E
S301
S302
S303
S304
S305
S306
S307
S308
S309
S310
S311
S312
S313
S314
S315
S316
S317
400 SERIES
S400
S401
S402
S404
S405
S406
S407
S407A
CEBU I.T. PARK MIXED-USE DEVELOPMENT
500 SERIES
S500
S500A
S501
S501A
S502
S503
S504
S505
S505A
S506
S506A
S507
S507A
S508
S509
S510
S510A
S511
S511A
S512
S513
S514
S515
S515A
S516
S516A
S416B
S517
S560
S561
S562
S562.1
S562.2
S563
S564
S565
S566
S567
S568
S569
S570
SD200 SERIES
SD201A
SD201B
SD201C
SD201D
SD201E
SD201F
SD201G
SD201H
SD201I
SD200 SERIES
SD202A
SD200 SERIES
SD203A
SD203B
SD203C
SD203D
SD203E
SD203F
SD203G
SD203H
SD203I
SD200 SERIES
SD204A
SD300 SERIES
SD301A
SD301B
SD301C
SD301D
SD301E
SD301F
SD301G
SD301H
SD301I
SD300 SERIES
SD302A
SD300 SERIES
SD303A
SD303B
SD303C
SD303D
SD303E
SD303F
SD303G
SD303H
SD303I
SD300 SERIES
SD304A
SD400 SERIES
SD401A
SD401B
SD401C
SD401D
SD401E
SD401F
SD401G
SD401H
SD401I
SD400 SERIES
SD402A
SD400 SERIES
SD403A
SD403B
SD403C
SD403D
SD403E
SD403F
SD403G
SD403H
SD403I
SD400 SERIES
SD404A
SD500 SERIES
SD501A
SD501B
SD501C
SD501D
SD501E
SD501F
SD501G
SD501H
SD501I
000 SERIES
B-S001
B-S002
100 SERIES
B-S100
B-S100A
B-S100B
B-S101
B-S101A
B-S101B
200 SERIES
B-S200
B-S201
B-S201A
B-S202
B-S203
B-S204
B-S204A
B-S205
300 SERIES
B-S300
400 SERIES
B-S420
B-S421
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
Client No
Location
PrjDes
Soil Report
Architectural
References
Mechanical
Sanitary
Electrical
Others
A SHEET COUNTS
Work Percenta
S0000 SERIES
S001
S011
SA00 SERIES
0000
S000
S001
SA00 SERIES EXCAVATION
S100 SERIES
S100
100 - FRAMING PLAN
S101
S102
SERIES - 300 BEAM COMPONENTS AND DETAIL SERIES - 200 VERTICAL COMPONENTS SERIES 100 - FRAMING PLA
S304
S303
S302
S301
S300
S205
S204
S203
S202
S201
S200
S105
S104
S103
S300 SERIES
S200 SERIES
E: MEPS COMPONENTS: CONCRETE SERIES - 400 SLAB AND / OR ROOF COMPONENTS SERIES - 300 BEAM
S562
S561
S560
S501
S500
S404
S403
S402
S401
S400
S500 SERIES
S400 SERIES
SERIES - 500 A&E: MEPS COMPONENT
S700 SERIES
S700
S701
S740
SERIES - 700 MISCELLANEOUS STRUCTURES
S741
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
Client No
Location
PrjDes
Soil Report
Architectural
References
Mechanical
Sanitary
Electrical
Others
A SHEET COUNTS
Work Percenta
S0000 SERIES
S001
S011
S0000 STANDARD STRUCTURAL NOTES
S031
S041
S051
S061
A01
A10
S0000 S
SA00 SERIES
0000
S000
SA00 SERIES EXCAVATION
S001
S100 SERIES
S100
SERIES 100 - FRAMING PLAN
S101
S102
S103
S104
S105
S200 SERIES
S200
S201
IES - 200 VERTICAL COMPONENTS
S202
S203
S204
S205
OR ROOF COMPONENTS SERIES - 300 BEAM COMPONENTS AND DETAIL SERIES - 200 VERTICAL C
S404
S403
S402
S401
S400
S304
S303
S302
S301
S300
S400 SERIES
S300 SERIES
SERIES - 700 MISCELLANEOUS STRUCTURES
SERIES - 500 A&E: MEPS COMPONENTS: CONCRETE SERIES - 400 SLAB AND / OR ROOF COMPONENT
S741
S740
S701
S700
S562
S561
S560
S501
S500
S700 SERIES
S500 SERIES
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
Client No
Location
PrjDes
Soil Report
Architectural
References
Mechanical
Sanitary
Electrical
Others
A SHEET COUNTS
Work Percenta
S0000 SERIES
S001
S011
S021
S031
S041
ANDARD STRUCTURAL NOTES
S051
S061
A01
A10
ERIES 100 - FRAMING PLAN SA00 SERIES EXCAVATION S0000 STANDARD STRUCTURAL
0000
S102
S101
S100
S001
S000
S100A
S100 SERIES
SA00 SERIES
ENTS AND DETAIL SERIES - 200 VERTICAL COMPONENTS SERIES 100 - FRAMING
S222
S221
S220
S202
S201
S200
S2240
S300 SERIES
S200 SERIES
SERIES - 400 SLAB AND / OR ROOF COMPONENTS SERIES - 300 BEAM COMPONENTS AND DETAIL
S420
S401
S400
S401A
S400A
S400 SERIES
ES SERIES - 500 A&E: MEPS COMPONENTS: CONCRETE SERIES - 400 S
S501
S500
S700 SERIES
S500 SERIES
SERIES - 700 MISCELLANEOUS STRUCTURES
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
A SHEET COUNTS
Work Per
S000 SERIES
S000
S001
S100
S101
SERIES
S102
S103
S100
S104
RMINAL COMPLEX
S120
0 SERIES
S240
PROPOSED PUB LIC MARKET AND TERMINAL COM
S200 SERIES
S240
S300
S301
S302
SERIES
S303
S304
S300
S305
S306
S307
S308
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
Client No
Location
Proj. Designer
Soil Report
Architectural
Mechanical
References
Sanitary
Electrical
Others
A SHEET COUNTS
Work Per
S000 SERIES
S000
S001
S100
SERIES
S101
S102
S103
L COMPLEX
S100
S100
PROPOSED PUB LIC MARKET AND TERMINAL COMPLE
S200
S200 SERIES
S300
SERIES
S300
S421
SERIES 400
S422
B STUDY CALCULATIONS
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
C SPECIFICATIONS
Specifications
LEGEND:
ASE
ONE TAFT RESIDENCES (40 STORY)
CL -0014 / Cityland Development
#1939 Taft Avenue, Malate, Manila
Work Percentage
DRAWING CONTENTS
COVER PAGE
S100 SERIES
STRUCTURAL NOTES
FOUNDATION PLAN
COLUMN AND SHEAR WALL LAYOUT
GROUND FLOOR FRAMING LAYOUT
2ND FLOOR FRAMING PLAN
23RD FLOOR FRAMING PLAN
4TH FLOOR FRAMING PLAN
5TH FLOOR FRAMING PLAN
6TH FLOOR FRAMING PLAN
MID RAMP 6TH TO 7TH FLOOR FRAMING LAYOUT
7TH FLOOR FRAMING PLAN
8TH FLOOR FRAMING PLAN
TYPICAL 9TH TO 11TH FLOOR FRAMING PLAN
12TH FLOOR FRAMING PLAN
TYPICAL 15TH TO 18TH FLOOR FRAMING PLAN
TYPICAL 19TH TO 23RD FLOOR FRAMING PLAN
TYPICAL 24TH TO 28TH FLOOR FRAMING PLAN
TYPICAL 29TH TO 33RD TH FLOOR FRAMING PLAN
TYPICAL 34TH TO 38TH FLOOR FRAMING PLAN
TYPICAL 39TH TO 41ST FLOOR FRAMING PLAN
PENTHOUSE FLOOR FRAMING PLAN
WATER TANK LEVEL FRAMING PLAN
MACHINE ROOM LEVEL FRAMING PLAN
POOLDECK LEVEL FRAMING PLAN
MACHINE ROOM ROOF LEVEL FRAMING PLAN
STAIR ROOF SLAB FRAMING PLAN
S200 SERIES
FOUNDATION REINFORCE MENT LEVEL
FOOTING TIE BEAM REINFORCEMENT DETAIL
FOUNDATION SECTION DETAIL
BORED FILE REINFORCEMENT DETAIL
BORED FILE ELEVATION DETAIL
COLUMN REINFORCEMENT DETAIL
SHEAR WALL REINFORCEMENT DETAIL
OUTRIGGER WALL REINFORCEMENT DETAIL
STAIR ROOF SLAB FRAMING PLAN
S300 SERIES
TYPICAL BEAM REINFORCEMENT DETAIL
BEAM REINFORCEMENT SCHEDULE
BEAM REINFORCEMENT SCHEDULE
TYPICAL CONCRETE SLAB DETAILS AND SCHEDULE
TYPICAL CONCRETE SLAB DETAILS
TYPICAL SLAB SHEAR REINFORCING DETAILS AND SCHEDULE
TYPICAL POST-TENSION DETAILS AND SCHEDULE
TYPICAL POST-TENSION DETAILS
TYPICAL CONCRETE DETAILS
BEAM REINFORCEMENT SCHEDULE & DETAIL
FOUNDATION WALL SECTIONS
FOUNDATION WALL SECTIONS
CONCRETE DETAILS
CONCRETE DETAILS
LEVEL 5 MAT FOUNDATION BOTTOM REINFORCING PLAN
LEVEL 5 MAT FOUNDATION SHEAR REINFORCING PLAN
LEVEL 5 MAT FOUNDATION TOP REINFORCING PLAN
TYPICAL BEAM REINFORCEMENT DETAIL
S400 SERIES
2ND FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
23RD FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
4TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
5TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
6TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
MID RAMP 6TH TO 7TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
7TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
8TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
TYPICAL 9TH TO 11TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
12TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
TYPICAL 15TH TO 18TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
TYPICAL 19TH TO 23RD FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
TYPICAL 24TH TO 28TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
TYPICAL 29TH TO 33RD FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
TYPICAL 34TH TO 38TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
TYPICAL 39TH TO 41ST FLOOR SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
PENTHOUSE SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
WATER TANK SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
MACHINE ROOM SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
POOL DECK SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
MACHINE ROOM SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
STAIR ROOF DECK SLAB REINFORCEMENT LAYOUT (TOP & BOTTOM)
CONCRETE SLAB WITH WIRE MESH TYPICAL DETAIL
SLAB SECTION DETAIL
SLAB ON GRADE
ADDITIONAL DIAGONAL REINFORCEMENT @ CORNER SLAB (2ND TO 7TH FLOOR)
S500 SERIES
STAIR DETAIL
RAMP DETAIL
RAMP SLAB REINFORCEMENT LAYOUT]
NOT USE
STO & CISTERN DETAIL
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
ASE
THE IMPERIUM
CL-0009 / OCLP
Capitol, Commons, Pasig City
Work Percentage
DRAWING TITLE
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
Submitted
Submitted August 30, 2014 For bldg permit
For Construction Drawing (FCD) : august 15, 2015
Work Percentage
DRAWING TITLE
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
ASE
THE PLAYGOUND
ABOITIZLAND
Brgy. Bugtong na Pulo, Lipa, Batangas
Work Percentage
DRAWING TITLE
COVER PAGE
DRAWING INDEX
SCTRUCTURAL NOTES
BUILDING A
FOUNDATION PLAN / COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION
SECTION DETAIL
SECTION DETAIL
SECTION DETAIL
BUILDING B
FOUNDATION PLAN / COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN / 2ND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
BUILDING C
FOUNDATION PLAN / COLUMN LAYOUT / GROUND FLOOR FRAMING
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
BUILDING D
FOUNDATION PLAN / COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
BUILDING E
FOUNDATION PLAN
COLUMN LAYOUT
GROUND FLOOR FRAMING LAYOUT
2ND FLOOR FRAMING OLAN / LOWER ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
SECTION DETAIL
BUILDING F
FOUNDATION PLAN
COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
SECTION DETAIL
BUILDING G
FOUNDATION PLAN
COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
SECTION DETAIL
BUILDING H
FOUNDATION PLAN / COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
BUILDING I
FOUNDATION PLAN
COLUMN LAYOUT
LOWER GROUND FLOOR FRAMING PLAN
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION DETAIL
BUILDING J
FOUNDATION PLAN / COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
BUILDING K
FOUNDATION PLAN / COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN / 2ND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
BUILDING L
FOUNDATION PLAN
COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
BUILDING M
FOUNDATION PLAN
COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
SECTION DETAIL
BUILDING N & P
FOUNDATION PLAN
COLUMN LAYOUT
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
SECTION DETAIL
SECTION DETAIL
BUILDING 0
FOUNDATION PLAN / COLUMN LAYOUT / GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
SECTION DETAIL
BUILDING Q
FOUNDATION PLAN / COLUMN LAYOUT / GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
SECTION DETAIL
BUILDING R
FOUNDATION PLAN
COLUMN LAYOUT
LOWER GROUND FLOOR FRAMING PLAN
GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
ROOF FRAMING PLAN
SECTION
SECTION DETAIL
BUILDING S
FOUNDATION PLAN / COLUMN LAYOUT / GROUND FLOOR FRAMING PLAN
ROOF FRAMING PLAN
SECTION DETAIL
DETAIL
FOOTING REINFORCEMENT DETAILS
TYP STEEL COLUMN TO PEDESTAL DETAILS
TYP LOAD BEARING WALL REINFORCEMENT DETAILS
MSW1 - REINFORCEMENT DETAILS
TYP SLAB REINFORCEMENT DETAILS
TYP 2ND FLOOR SLAB REINFORCEMENT DETAILS
TYP STEEL MEMBER EINFORCEMENT DETAILS
TYP RAFTER / PURLING CONNECTION DETAILS
STEEL COLUMN TO RTAFTER POST DETAILS
STEEL BEAM TO STEEL COLUMN (WEB) CONN. DETAIL
STEEL COLUMN (WEB) TO STEEL ROOF BEAM DETAIL
STEEL COLUMN TO STEEL JOIST CONNECTION DETAIL
STEEL COLUMN (FLANGE) TO STEEL BEAM ROOF DETAILS
STEEL BEAM TO STEEL COLUMN (WEB) CONN. DETAIL
TYP STEEL BEAM TO STEEL BEAM CONNECTION DETAILS
ROOF BEAM TO STEEL BEAM CONNECTION DETAILS
ROOF BEAM TO VERTICAL MEMBER CONNECTION DETAILS
TYP TERMINATED STEEL COLUMN TO STEEL BEAM CONNECTION DETAILS
TYP VERTICAL MEMBER TO STEEL BEAM CONNCETION DETAILS
CONCRETE BEAM TO VERTICAL MEMBER (RAFTER POST) CONNECTION
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
PHASE
PROPOSED 7-STOREY OFFICE BUILDING COMPLEX
CL-0027 / BF Corporation Inc.
E. Rodriguez Ave., Ugong, Pasig City
Work Percentage
STRUCTURAL NOTES
COVER PAGE
DRAWING INDEX
DRAWING INDEX
FRAMING PLANS
FOUNDATION PLAN - OFFICE BUILDING
FOUNDATION PLAN - PARKING
COLUMN SETTING LAYOUT - OFFICE BUILDING
GROUND FLOOR FRAMING PLAN - PARKING
GROUND FLOOR FRAMING PLAN - OFFICE BUILDING
SECOND FLOOR FRAMING PLAN - PARKING
SECOND FLOOR FRAMING PLAN - OFFICE BUILDING
THIRD FLOOR FRAMING PLAN - PARKING
TYPICAL 3RD FLOOR TO 5TH FRAMING PLAN - OFFICE BUILDING
FOURT FLOOR FRAMING PLAN - PARKING
6TH FLOOR FRAMING PLAN - OFFICE BUILDING
FIFTH FLOOR FRAMING PLAN - PARKING
ROOF DECK FRAMING PLAN - OFFICE BUILDING
SIXTH FLOOR FRAMING PLAN - PARKING
ROOF FRAMING PLAN - OFFICE BUILDING
ROOF FRAMING [PLAN - PARKING
SECTION 1-1 OFFICE BUILDING
SECTION B-B
VERTICAL COMPONENTS
FOOTING REINFORCEMENT DETAILS AND SCHEDULES - OFFICE BUILDING
STEEL COLUMN SECTION DETAIL - OFFICE BUILDING
SLAB ON GRADE REINFORCEMENT DETAIL AND SCHEDULE - OFFICE BUILDING
STEEL BEAM SECTION DETAIL - OFFICE BUILDING
FOOTING REINFORCEMENT DETAILS AND SCHEDULES - PARKING
STEEL COLUM DETAIL - PARKING
SLAB ON GRADE REINFORCEMENT DETAIL AND SCHEDULE - PARKING
STEEL BEAM JOIST DETAIL - PARKING
STEEL BEAM GIRDER DETAIL - PARKING
SHEARWALL REINFORCEMENT DETAiILS AND SCHEDULES - OFFICE BUILDING
SHEARWALL REINFORCEMENT DETAILS AND SCHEDULES - PARKING
TYOICAL SUSPENDED FLOOR SLAB REINFORCEMENT DETAIL - PARKING
TYPICAL SUSPENDED FLOOR SLAB REINFORCEMENT DETAIL - OFFICE BUILDING
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
PHASE
LA SALLETE SCHOOL BLDG
CL-007 SEGNOR CONST. & DEVELOPMENT
SAN JOSE DEL MONTE BULACAN
SCHOOL
Local 2015 Project-CL-007
Local 2015 Project-CL-007
Work Percentage
STANDARD STRUCTURAL NOTES
GENERAL NOTES
CONCRETE NOTES AND TYPICAL BAR BENDS
STEEL NOTES AND TYPICAL DETAILS
DESIGN CRITERIA : REFERENCES
LOADING MAPS : LOAD DIAGRAM
OTHERS
EXCAVATION PLAN
COVER PAGE
DRAWING LIST
VERTICAL COMPONENTS
FOUNDATION REINFORCEMENT DETAIL
COLUMN REINFORCEMENT DETAIL
SHEARWALL REINFORCEMENT DETAIL
BEAM COMPONENTS
CONCRETE BEAM DETAIL
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
PHASE
ROYALTON
CL-0009
Ortigas Pasig, City
Work Percentage
STANDARD NOTES AND TYPICAL DETAILS
SHEET INDEX RESPONSIBILITY MATRIX
SHEET INDEX RESPONSIBILITY MATRIX
ABBREVIATION & LEGEND
REINFORCING BAR TABLES
GENERAL NOTES
LOAD MAPS
LOAD MAPS
LOAD MAPS
LOAD MAPS
LOAD MAPS (FLOOR FINISH AND PARTITIONS)
REINFORCED CONCRETE SLAB SCHEDULE AND TYPICAL DETAILS
REINFORCED CONCRETE SLAB SCHEDULE AND TYPICAL DETAILS
TYPICAL CONCRETE DETAILS
TYPICAL SLAB SHEAR REINFORCING DETAILS
POST-TENSIONING TYPICAL DETAILS
POST-TENSIONING TYPICAL DETAILS
CORE WALL COUPLING BEAM SCHEDULE & TYPICAL DETAILS
TYPICAL CORE WALL DETAILS
TYPICAL CORE WALL DETAILS
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
PHASE
FR OFFICE BLDG & MULTI LEVEL PARKING
CL-0027 Econospan Builders Inc.
Work Percentage
STANDARD STRUCTURAL NOTES
GENERAL NOTES
CONCRETE NOTES AND TYPICAL BAR BENDS
POST TENSION NOTES AND TYPICAL DETAILS
STEEL NOTES AND TYPICAL DETAILS
DESIGN CRITERIA : REFERENCES
LOADING MAPS : LOAD DIAGRAM
OTHERS
EXCAVATION PLAN AND SECTIONS
OTHERS
EXCAVATION PLAN
COVER PAGE
DRAWING INDEX
STRUCTURAL NOTES
VERTICAL COMPONENTS
FOOTING, COLUMN, BEAM AND SLAB ON GRADE REINFORCEMENT, SCHED DET.
FOUNDATION REINFORCEMENT DETAIL
SHEARWALL AND RC WALL REINFORCEMENT DETAIL-6 STOREY BUILDING
STEEL COLUMN REINFORCEMENT DETAIL-PARKING
CONCRTE COLUMN REINFORCEMENT DETAIL-PARKING
SHEAR WALL REINFORCEMENT DETAIL-PARKING
S
CSI Master Format
CUMENTATION
ND LIBRARY
PHASE
UPGRADING/ EXPANSION OF ROSARIO MEMORIAL HOSPITAL
Work Percentage
STRUCTURAL NOTES
FOUNDATION PLAN
COLUMN SETTING LAYOUT
GROUND FLOOR FRAMING PLAN
2ND FLOOR FRAMING PLAN
3RD FLOOR FRAMING PLAN
SECTION ELEVATION PLAN
ROOF FRAMING /ROOF DECK FRAMING PLAN
S
CSI Master Format
CUMENTATION
ND LIBRARY
Submitted
Submitted May 22, 2015 For bldg permit
For Construction Drawing (FCD) : Submitted July 15, 2015
PIMENTEL & ASSOCIATES
PHASE
CEBU I.T. PARK MIXED-USE DEVELOPMENT
Work Percentage
COVER PAGE
STRUCTURAL NOTES
SHEET COUNT LIST
FOUNDATION PLAN
GROUND FRAMING PLAN (GENERAL ARRANGEMENT)
FOUNDATION PLAN - A
GROUND FRAMING PLAN - A
FOUNDATION PLAN - B
GROUND FRAMING PLAN - B
DECK LEVEL FRAMING PLAN (GEN. ARRANGEMENT)
ROOF FRAMING PLAN (TOP & BOTTOM CHORD)
DECK LEVEL FRAMING PLAN - A
ROOF FRAMING PLAN (TOP & BOTTOM CHORD) - A
DECK LEVEL FRAMING PLAN - B
ROOF FRAMING PLAN (TOP & BOTTOM CHORD) - B
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
Work Percentage
STANDARD STRUCTURAL NOTES
GENERAL NOTES
CONCRETE NOTES AND TYPICAL BAR BENDS
POST TENSION NOTES AND TYPICAL DETAILS
STEEL NOTES AND TYPICAL DETAILS
DESIGN CRITERIA : REFERENCES
LOADING MAPS : LOAD DIAGRAM
OTHERS
EXCAVATION PLAN AND SECTIONS
OTHERS
EXCAVATION PLAN
COVER PAGE
DRAWING INDEX
STRUCTURAL NOTES
BEAM COMPONENTS
TYPICAL BEAM ELEVATION REINFORCEMENT DETAIL
TYPICAL BEAM ELEVATION REINFORCEMENT DETAIL
TYPICAL BEAM ELEVATION REINFORCEMENT DETAIL
TYPICAL BEAM ELEVATION REINFORCEMENT DETAIL
TYPICAL REINFORCEMENT DETAIL
SLAB AND OR ROOF COMPONENTS
TYPICAL SLAB REINFORCEMENT DETAIL
SLAB REINFORCEMENT PLAN DETAIL @ GROUND LEVEL
SLAB REINFORCEMENT PLAN DETAIL @ 2ND~9TH LEVEL (TOP BARS)
SLAB REINFORCEMENT PLAN DETAIL @ 2ND~9TH LEVEL (BOTTOM BARS)
ROOF SECTION DETAIL
SLAB REINFORCEMENT SECTION DETAIL
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
ecember 03, 2014-Submitted for structural concept report-Sent thrue email by Sir Ros
pril 10,2015-Submitted for bldg permit (7-Sets Blue print structural plan)
( 7-Sets structural specs & calcs)
For Construction Drawing (FCD) : August 12, 2015
PIMENTEL & ASSOCIATES
PHASE
AMAIA STEPS LAS PIAS (LONG BLDG)
CL-0020-AMAIA
AMAIA STEPS LAS PIAS (SHORT BLDG)
Condominium
hard copy
local Project 2014 to 2015
Work Percentage
STANDARD STRUCTURAL NOTES
GENERAL NOTES
CONCRETE NOTES AND TYPICAL BAR BENDS
STEEL NOTES AND TYPICAL DETAILS
DESIGN CRITERIA : REFERENCES
LOADING MAPS : LOAD DIAGRAM
OTHERS
EXCAVATION PLAN AND SECTIONS
OTHERS
EXCAVATION PLAN
COVER PAGE
DRAWING INDEX
STRUCTURAL NOTES
MISCELLANEOUS STRUCTURES
GUARD HOUSE FRAMING PLANS
GUARD HOUSE REINFORCEMENT DETAILS
FOYER FRAMING PLANS
FOYER REINFORCEMENT DETAILS
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
ecember 03, 2014-Submitted for structural concept report-Sent thrue email by Sir Ros
pril 10,2015-Submitted for bldg permit (7-Sets Blue print structural plan)
( 7-Sets structural specs & calcs)
For Construction Drawing (FCD) : August 12, 2015
PIMENTEL & ASSOCIATES
PHASE
MALABON MODULE 5 STOREY 24 SQM. (CLUSTER - 2 & 3 TYPE)
CL-0036 PHINMA
Brgy. Baritan, Malabon City
Work Percentage
STANDARD STRUCTURAL NOTES
GENERAL NOTES
CONCRETE NOTES AND TYPICAL BAR BENDS
POST TENSION NOTES AND TYPICAL DETAILS
STEEL NOTES AND TYPICAL DETAILS
DESIGN CRITERIA : REFERENCES
LOADING MAPS : LOAD DIAGRAM
OTHERS
EXCAVATION PLAN AND SECTIONS
OTHERS
EXCAVATION PLAN
COVER PAGE
DRAWING INDEX
STRUCTURAL NOTES
BEAM COMPONENTS
SLAB AND OR ROOF COMPONENTS
GROUND FLOOR SLAB REINFORCEMENT LAYOUT (BOTTOM BAR)
TYPICAL JUNCTION BOX DETAIL REINFORCEMENT SCHEDULE
GROUND FLOOR SLAB REINFORCEMENT LAYOUT (TOP BAR)
REINFORCEMENT SCHEDULE
TYPICAL 2ND TO 5TH FLOOR SLAB REINFORCEMENT LAYOUT (BOTTOM BAR)
TYPICAL JUNCTION BOX DETAIL REINFORCEMENT SCHEDULE
TYPICAL 2ND TO 5TH FLOOR SLAB REINFORCEMENT LAYOUT (TOP BAR)
REINFORCEMENT SCHEDULE
LINTEL BEAM DETAIL
ROOF BEAM DETAIL
STEEL MEMBER DETAIL
TYPICAL PURLIN & PURLIN SUPPORT DETAIL
TYPICAL BEAM OR SLAB CHANGE OF SOFFIT DETAIL
A&E: MEPS COMPONENTS : CONCRETE
STAIR DETAIL
STAIR DETAIL
MISCELLANEOUS STRUCTURES
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
ASE
PROPOSED PUBLIC MARKET AND TERMINAL COMPLEX
Local Government of Jasaan
Kimaya, Jasaan, Misamis Oriental
Work Percentage
DRAWING TITLE
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
ASE
PROPOSED BUS AND JEEPNEY TERMINAL
Local Government of Jasaan
Kimaya, Jasaan, Misamis Oriental
Work Percentage
DRAWING TITLE
LATIONS
Design Criteria
Frame Analysis - Seismic and Non Seismic
Floor Framing Analysis - All Floors
Foundation Design
Others Miscellaneous
S
CSI Master Format
CUMENTATION
ND LIBRARY
Work Status
20 40 60 80
Design Phases Date Started Date Finish
LOD 100 - SD
LOD 200 - DD 2014-09-30
LOD 300 - CD 2015-09-15
Work Status
20 40 60 80
Design Phases Date Started Date Finish
LOD 100 - SD 2015-06-23
LOD 200 - DD 2015-07-16
LOD 300 - CD 2015-08-09
Work Status
20 40 60 80
Design Phases Date Started Date Finish
LOD 100 - SD 2015-10-15
LOD 200 - DD
LOD 300 - CD
Work Status
20 40 60 80
Design Phases Date Started Date Finish
LOD 100 - SD 2015-10-17
LOD 200 - DD 2015-10-19
LOD 300 - CD
Work Status
20 40 60 80
Design Phases Date Started Date Finish
LOD 100 - SD 2015-08-05
LOD 200 - DD 2015-08-05
LOD 300 - CD
ok
ok
Work Status
20 40 60 80
Emily Santos:
Calcs C/0 By: Engr. King
Design Phases Date Started Date End
LOD 100 - SD 2013-09-30
LOD 200 - DD 2014-01-14
LOD 300 - CD 2014-04-15
Design Phases Date Started Date End
LOD 100 - SD 2015-07-23
LOD 200 - DD 2015-08-18
LOD 300 - CD
20 40 60 80
Design Phases Date Started Date End
LOD 100 - SD
LOD 200 - DD 2015-05-22
LOD 300 - CD 2015-07-15
Work Status
20 40 60 80
Design Phases Date Started Date End
LOD 100 - SD
LOD 200 - DD 2015-06-19
LOD 300 - CD 2015-09-09
20 40 60 80
Design Phases Date Started Date End
LOD 100 - SD
LOD 200 - DD 2015-06-19
LOD 300 - CD 2015-08-12
OK
OK
20 40 60 80
Design Phases Date Started Date end
LOD 100 - SD 2014-12-03
LOD 200 - DD 2015-04-15
LOD 300 - CD 2015-08-12
OK
OK
WORK STATUS
20 40 60 80
Design Phases Date Started Date End
LOD 100 - SD 2015-08-27
LOD 200 - DD 2015-09-01
LOD 300 - CD
Work Status
20 40 60 80
Design Phases Date Started Date Finish
LOD 100 - SD 2015-10-20
LOD 200 - DD 2015-10-27
LOD 300 - CD
Work Status
20 40 60 80
Design Phases Date Started Date Finish
LOD 100 - SD
LOD 200 - DD 2015-10-09
LOD 300 - CD
Work Status
20 40 60 80
ENGINEER ARCHICAD
Status
100 FINAL
ENGINEER ARCHICAD
SEPTEMBER
JHUNE M JONATHAN B
1 2 3
SD
Status
100 FINAL
ENGINEER ARCHICAD
Status
100 FINAL
ENGINEER ARCHICAD
JANUARY
1 2 3
Status
100 FINAL
ENGINEER ARCHICAD
100 FINAL
ENGINEERS REVIT
KING S. GAB A. JANUARY
1 2 3
100 FINAL
ENGINEERS REVIT YEAR 2013
SEPTEMBER
1 2 3
100 FINAL
ENGINEERS REVIT
JANUARY
1 2 3
100 FINAL
ENGINEERS REVIT
VANESSA G. MARYROSE P.
JANUARY
1 2 3
100 FINAL
ENGINEERS REVIT
80 FINAL
SD
100 FINAL
SD
100 FINAL
ENGINEERS REVIT
100 Final
ENGINEER ARCHICAD
RYAN A. JANUARY
1 2 3
Status
100 FINAL
ENGINEER ARCHICAD
RYAN JANUARY
1 2 3
Status
100 FINAL
YEAR 2015 -
NUARY FEBRUARY MARCH APRIL
4 1 2 3 4 1 2 3 4 1
YEAR 2015
PTEMBER JANUARY FEBRUARY MARCH
4 1 2 3 4 1 2 3 4 1
DD
YEAR 2015 -
NUARY FEBRUARY MARCH APRIL
4 1 2 3 4 1 2 3 4 1
YEAR 2015 -
NUARY FEBRUARY MARCH APRIL
4 1 2 3 4 1 2 3 4 1
YEAR 2015 -
NUARY FEBRUARY MARCH APRIL
4 1 2 3 4 1 2 3 4 1
YEAR 2015 -
NUARY FEBRUARY MARCH APRIL
4 1 2 3 4 1 2 3 4 1
AR 2013 YEAR 2014 YEAR 2015 -
. .
YEAR 2015 -
.
YEAR 2015 -
NUARY FEBRUARY MARCH APRIL
4 1 2 3 4 1 2 3 4 1
AR 2014 YEAR 2015 -
EMEBER JANUARY FEBRUARY MARCH
4 1 2 3 4 1 2 3 4 1
AR 2014 YEAR 2015 -
EMEBER JANUARY FEBRUARY MARCH
4 1 2 3 4 1 2 3 4 1
YEAR 2015 -
NUARY FEBRUARY MARCH APRIL
4 1 2 3 4 1 2 3 4 1
NUARY FEBRUARY MARCH APRIL
4 1 2 3 4 1 2 3 4 1
NUARY FEBRUARY MARCH APRIL
4 1 2 3 4 1 2 3 4 1
YEAR 2015
APRIL MAY JUNE
2 3 4 1 2 3 4 1 2 3
SD
DD
- YEAR 2015
MARCH APRIL MAY
2 3 4 1 2 3 4 1 2 3
YEAR 2015
APRIL MAY JUNE
2 3 4 1 2 3 4 1 2 3
SD
YEAR 2015
APRIL MAY JUNE
2 3 4 1 2 3 4 1 2 3
YEAR 2015
APRIL MAY JUNE
2 3 4 1 2 3 4 1 2 3
YEAR 2015
APRIL MAY JUNE
2 3 4 1 2 3 4 1 2 3
YEAR 2015
SD
BP
.
YEAR 2015
DD
YEAR 2015
APRIL MAY JUNE
2 3 4 1 2 3 4 1 2 3
DD
YEAR 2015
MARCH APRIL MAY
2 3 4 1 2 3 4 1 2 3
DD
`
YEAR 2015
MARCH APRIL MAY
2 3 4 1 2 3 4 1 2 3
DD
`
YEAR 2015
APRIL MAY JUNE
2 3 4 1 2 3 4 1 2 3
APRIL MAY JUNE
2 3 4 1 2 3 4 1 2 3
APRIL MAY JUNE
2 3 4 1 2 3 4 1 2 3
- YEAR 2015
UNE JULY AUGUST SEPTEMBER
4 1 2 3 4 1 2 3 4 1
-
MAY JUNE JULY AUGUST
4 1 2 3 4 1 2 3 4 1
- YEAR 2015
UNE JULY AUGUST SEPTEMBER
4 1 2 3 4 1 2 3 4 1
DD
FCD
- YEAR 2015
UNE JULY AUGUST SEPTEMBER
4 1 2 3 4 1 2 3 4 1
- YEAR 2015
UNE JULY AUGUST SEPTEMBER
4 1 2 3 4 1 2 3 4 1
- YEAR 2015
UNE JULY AUGUST SEPTEMBER
4 1 2 3 4 1 2 3 4 1
- YEAR 2015
FCD
- YEAR 2015
UNE JULY AUGUST SEPTEMBER
4 1 2 3 4 1 2 3 4 1
FCD
- YEAR 2015
MAY JUNE JULY AUGUST
4 1 2 3 4 1 2 3 4 1
- YEAR 2015
MAY JUNE JULY AUGUST
4 1 2 3 4 1 2 3 4 1
- YEAR 2015
UNE JULY AUGUST SEPTEMBER
4 1 2 3 4 1 2 3 4 1
SD
DD
UNE JULY AUGUST SEPTEMBER
4 1 2 3 4 1 2 3 4 1
UNE JULY AUGUST SEPTEMBER
4 1 2 3 4 1 2 3 4 1
YEAR 2015
SEPTEMBER OCTOBER NOVEMBER
2 3 4 1 2 3 4 1 2 3
FCD
YEAR 2015
AUGUST SEPTEMBER OCTOBER
2 3 4 1 2 3 4 1 2 3
FCD
YEAR 2015
SEPTEMBER OCTOBER NOVEMBER
2 3 4 1 2 3 4 1 2 3
YEAR 2015
SEPTEMBER OCTOBER NOVEMBER
2 3 4 1 2 3 4 1 2 3
SD
YEAR 2015
SEPTEMBER OCTOBER NOVEMBER
2 3 4 1 2 3 4 1 2 3
SD
DD
YEAR 2015
SEPTEMBER OCTOBER NOVEMBER
2 3 4 1 2 3 4 1 2 3
SD
YEAR 2015
FCD
YEAR 2015
FCD
YEAR 2015
AUGUST SEPTEMBER OCTOBER
2 3 4 1 2 3 4 1 2 3
FCD
YEAR 2015
SEPTEMBER OCTOBER NOVEMBER
2 3 4 1 2 3 4 1 2 3
SEPTEMBER OCTOBER NOVEMBER
2 3 4 1 2 3 4 1 2 3
SD
DD
SEPTEMBER OCTOBER NOVEMBER
2 3 4 1 2 3 4 1 2 3
SD
DD
EMBER DECEMBER
4 1 2 3 4
YEAR 2015
OBER NOVEMBER DECEMBER
4 1 2 3 4 1 2 3 4
EMBER DECEMBER
4 1 2 3 4
EMBER DECEMBER
4 1 2 3 4
EMBER DECEMBER
4 1 2 3 4
EMBER DECEMBER
4 1 2 3 4
EMBER OCTOBER NOVEMBER DECEMBER
4 1 2 3 4 1 2 3 4 1
EMBER DECEMBER
4 1 2 3 4
EMBER DECEMBER
4 1 2 3 4
EMBER DECEMBER
4 1 2 3 4
SD
OBER NOVEMBER DECEMBER
4 1 2 3 4 1 2 3 4
OBER NOVEMBER DECEMBER
4 1 2 3 4 1 2 3 4
EMBER DECEMBER
4 1 2 3 4
EMBER DECEMBER
4 1 2 3 4
EMBER DECEMBER
4 1 2 3 4
DECEMBER
2 3 4