SAQ Supervisor :
Name
Phone : Site ID : Phase :
1. GENERAL INFORMATION
Site ID/
:
Candidate
Site
:
Name
Site
: BTS BSC/ hub site Transmission only
Category
BTS
: Indoor BTS (use shelter/ equipment room) Outdoor BTS
Type
Total
: x meter 2
Space
Site
: Roof Top : Mini Tower (Triangle / SST) height meter
Type
Pole Unit(s) height meter
Wallmounting Unit(s) height meter from ground level
Green Field : Monopole height meter
SST height meter
2. JUSTIFICATION
A. RADIO NETWORK PLANNING
A.1. Radio Frequency
(RF to provide Site Justification based on coverage/ Surrounding Panoramic Picture (360 degree); Market Overview/Economic activity;
Historical processes (Risalah); Closed distance for H3Is sites; Competitor BTS Location, etc.)
Point of view from RNP this candidate is OK although its out of SAR (Search Area Radius.. m), distance from CP : ..m with bearing about
degree and altitude is m.
Coverage objective is good.
Page : 2 of 4
SAQ Supervisor :
Name
Phone : Site ID : Phase :
Resume :
Candidate Remark and Distance from Need Approval Signature
Nominal Point
In SAR N/A
Out SAR Marketing
Relocation Marketing
Proposed by PT Nokia Solutions and Networks Approved/ Acknowledged/ Rejected by PT. Hutchison
Indonesia RF of RNP Dept. : 3 Indonesia (H3I) RF of RNP Dept. :
A.2. Transmission
(TX to provide Site Justification based on LOS to min. 3 other sites; expected to have clear frequency for this site, mention which
frequency will be utilized, etc.
Page : 3 of 4
SAQ Supervisor :
Name
Phone : Site ID : Phase :
Proposed by PT Nokia Solutions and Networks Indonesia - TX of Approved/ Acknowledged/ Rejected by PT. Hutchison 3
TNP Dept. : Indonesia (H3I) TX of TNP Dept. :
NO CME WORKS.
Not Available on BOQ 341 3G Collocation
Proposed by PT Nokia Solutions and Networks Indonesia C M E Approved/ Acknowledged/ Rejected by H3I
Dept. : C M E Dept. :
Page : 4 of 4
SAQ Supervisor :
Name
Phone : Site ID : Phase :
NO SITAC WORK
Proposed by PT Nokia Solutions and Networks Indonesia SAQ Approved/ Acknowledged/ Rejected by H3I
Dept.: SAQ Dept. :
4. NOTES
Page : 5 of 4
SAQ Supervisor :
Name
Phone : Site ID : Phase :
Proposed by PT Nokia Solutions and Networks Indonesia Approved/ Rejected by PT. Hutchison 3 Indonesia ,
Regional Project Manager GM Technical Regional