SR NO DESCRIPTION TB2 PLC FERRULE FIELD FERRULE

21 10 21
1 LS1(LIQUID SEAL BROKEN FLOAT)DI
22 12 22

23 10 23
2 LS2(LOW WATER LEVEL FLOAT)DI
24 15 24

25 39 25
3 SOLENOID VALVE(DO)
26 2 26

27
4 SPARE
28

29 40 29
5 OIL TEMP(AI) 30 41 30
31 42 31

32 43 32
6 WATER TEMP(AI) 33 44 33
34 45 34

35 10 35
7 PS(DI)
36 14 36

37 10 37
8 PS1(DI)
38 24 38

39 10 39
9 DPS(DI)
40 23 40

SR NO DESCRIPTION CONTACTOR A2 DO FERRULE POWER SUPPLY TB

1 C1 (SEPRATOR MOTOR)3 KW 30 30(DO1) 2/1/2003

2 C2 (FEED PUMP)0.75KW 35 30(DO6) 5/4/2006

3 C3 (BOOSTER PUMP)0.75KW 38 30(DO7) 8/7/2009

4 C4 (HTR1)24KW 31 30(DO2) 11/10/2012

5 C5 (HTR2)18KW 32 30(DO3) 13-14-15


6 C6 (HTR3)12KW 33 30(DO4) 16-17-18

6 C7 (HTR4)6KW 34 30(DO5) 19-20-21


SUPPLY

24 VDC
24 VDC

24 VDC
24 VDC

24VDC

24VDC

24VDC