SICIM is a Construction Company established in 1962 and
offering all types of services related to the installation of
pipelines and relevant ancillary facilities for the transmission
and distribution of oil and gas on an international basis.
The experience gained as a result of operating for the most
important international Oil & Gas Companies in all types of
logistic, climatic and environmental conditions, has allowed
SICIM to continuously modify and perfect all the relevant
operating procedures and adapt them to the specific technical
and contractual requirements.
On this basis, SICIM can offer the best range of solutions and
the right approach to all types of construction problems. Our
past is a guarantee of success.
resources
performances and guarantee the satisfaction of its Clients is a well-
trained and motivated workforce.
Personnel motivation, training and integration of different cultures
are an important part of SICIMs human resources management.
We have on our payroll personnel from over than 20 different
Nationalities!
Thanks to these policies and after more than forty-five years of
world-wide experiences, we can guarantee the right persons at all
levels.
Health, safety
and environment
SICIM activities are performed in compliance with
the best HSE recognised codes and standards
in order to safeguard the life and the health of all
personnel involved in the operations.
SICIM Occupational Health and Safety Management
System has been certified according to BS OHSAS
18001:2007 by Moody Intl during 2009.
Sicim Environmental Management System has been
certified according to ISO 14001:2004 by Moody
Intl during 2011.
SICIM OH&S and Environmental certificates cover
all SICIM activities included in its scope: Design,
procurement, construction and installation of
pipelines and associated plants for gas, oil and
water.
OHSAS 18001 and ISO 14001 certifications are only a step
towards continual improvement of our OH&S and Environmental
performances, being our common scope minimizing our impact on
people and environment.
SICIM Management and personnel are fully committed to implement
the Health, Safety and Environmental Plans that are being set out for
each specific Project and activity.
SICIM HSE plans are extended as such to all Clients, Subcontractors,
Visitors and suppliers personnel involved in our operations.
SICIM is convinced that HSE is not a goal to reach but it is an
essential prerequisite of the Companys operations
SICIM Management and personnel are fully committed to implement
the Health, Safety and Environmental Plans that are being set out for
each specific Project and activity.
SICIM HSE plans are extended as such to all Clients, Subcontractors,
Visitors and suppliers personnel involved in our operations.
SICIM is convinced that HSE is not a goal to reach but it is an
essential prerequisite of the Companys operations.
SICIM Quality Assurance System has been
certified in 1994 by the Lloyds Register according
to the ISO 9001 certification.
SICIM certification LRC 180547 covers all ranges
of activities and projects world-wide, including
Turn Key Projects on EPC basis.
To this effect, SICIM has shifted from the
traditional Quality Assurance System to the Quality
Management System.
SICIM quality policies are based on:
continuous research of Client satisfaction;
continuous improvement of the services
provided.
Welding SICIM is certified according
to UNI EN ISO 38342:2006 -
Quality requirements for fusion
welding of metallic materials
Part 2: Comprehensive quality
requirements.
France
Canada
Spain
Mexico
Colombia Algeria
Per
Holland
Belgium Germany
Switzerland
Italy
Kazakhstan
Turkmenistan
Iraq
Congo U.A.E.
Libya
Saudi Arabia
Cameroon
Angola
Mozambique
SICIM offices
The availability
availability ofofconstruction
constructionequipment
equipmentis isimpressive:
impressive: SICIM
SICIM owns
owns 118163 pipe-layers
pipe-layers of different
of different sizeca-
size and and
pacity, over 100 pay-welders, 49 excavators, 24 pipe bending machines to cover up to 60 pipes, 39
capacity, over 190 pay-welders, 164 excavators, 55 pipe bending machines to cover up to 60 pipes, 45 cranes trucked
dumpers,
up to 200 27
toncranes just
of lifting to mention
capacity, just atofew.
mention a few.
Plants
Plantsfor
forCivil
CivilWorks
Works N
N 4814 Internal
Wheeledline-up clampsSpecial
Tractors, up to 48
Use
N 61 Internal line-up clamps
N 13 Tractors equipped for sand blasting (Wheeled)
N
N 62 Bulldozers
Bulldozers
N 3 forTractors
automatic weldingforupsand
equipped to 56blasting
N
N 18 8 Front
Frontend loaders
End Loaders N 34 Hydraulic
(Trucked) bevelling machines up to 56
N 161
N 49 Excavators
Excavators uptype
to 50CAT
ton320-up to 345 N
N 12 8 Winches
Tractorsupequipped
to 70 tonfor induction heat
N
N 38 3 Amphibious excavators
Trucked Dumpers N
N 13
12 Test motorpumps
Motor Winch upuptoto70600
tonbar
N 61 Crawler
N 1 Motorgrader dumpers N
N 14
27 Filling motorpumps up to
Motor-Compressors 250.000
7 Bar to 24l/h
Bar to 24
N
N 27 Motorgrader
Mobile Crushing Plant N 2 Motorpump sets
Bar 25 000 l/min
N 76 Mobile
N Mobile Screening
crushing Plant Super Padder
plants N
N 3933 Compressors up to 30.000
Motor-Generators 3.5 Kwl/min
to 250 kW
N 8 Mobile
N Self Loading
screeningScreening
plants Plant N
N 10 Lighting Towers to 250 KW
75 Power Generators up
N 44
N De-watering
8 Self-loading Pumps plants
screening N
N 315 Forklifts
Motorand manlifts
Pumps high pressure up to 750 ATE
N 197 Compacting
N Compacting Rollers
rollers N 12 Lighting plants
N 5 Electrical Pumps high pressure up to 450
N 113 De-water pumps N 7 Hydrotest
ATE Container completed
Plants for Mechanical Works
N 10 with instrumentation
Motor-Pumps medium pressure up to 300
cm/hrs at 50 ATE
Plants for Mechanical works
N 118 Pipelayers 40 120 ton N 2 Motor-Pumps medium/high pressure 150
N 27 Wheeled Cranes 4 x 4 12 to 60 tons Various Motor cm/h at 10 / 200 ATE
Vehicles
N 2 Pipe-layers 120 ton
N 17 Fork Lifts N 6 Hydrotest Container completed with
N 60 Pipe-layers 90 ton
N 12 Pipe Stringing Tractors (Trucked) N 396 Cars,instrumentation
off-road vehicles, trucks and buses
N 101 Pipe-layers 60 ton
N 24 Bending Machines up to 60 N 32 Trailers, weight
N 10 Dead testersand pipe-dollies
semi-trailers
N 3 Pipe-bending machines 60
N 4 Thrust/Auger Bore Machines N 8 Hydrotesting Tanks from 20 to 40 cm
N 6 Pipe-bending machines 48
N 53 Internal Mandrels up to 60 N 8 Volumetric Flowmeters
N 46 Pipe-bending machines up to 42
N 23 Trucked Pay Welders for manual welding
N
N 12 52 Crawler
WheeledpipePay
carriers
Welders for manual welding Camp Facilities
Various Motor Vehicles
N 131 Crawler and wheeled pay-welders
N 28 Trucked Pay Welders for mechanised
forwelding manual welding N
N 11
86 Complete camp Wagons
4WD Station facilities and Pick Ups
N 64 Crawler pay-welders for automatic welding (4500 people total
N 30 4WD Multiservice occupancy)
Trucks type Daily 4x4
N 72 Welding Heads and Accessories for
N 11 Workshop
mechanisedtrucks for automatic
welding - PWT welding N 1 Water Tank Truck
N 69 Motor welding Machines N 47 Utility Trucks
N 4 Computerised programmer for mechanised
N 110 Electrical
weldingwelding machines N 17 Trucks with crane
N 45 Mobile
N 23 Internal cranes
Line up
up to 200 ton
Clamps up to 48 N 3 Greasing Trucks
N
N 25 3 Thrust boring
Internal Line machines
up Clamps for automatic N 7 Workshop Trucks
N 1 Microtunnelling
welding up to plant
56 DN 1460 N 10 Fuel Trucks
N
N 17 54 Sand-blasting
Motor Welding mobile units
Machines N 12 Road Tractors
N
N 21 7 Induction-heating
Electrical Welding mobile units
Machines N 5 Flat Beds
N 7 Coating mobile units
N 77 Pipe Cutting Machines (Ossirotors) up to 56 N 9 Low Beds
N
N 11 25 Farm tractorsBevelling
Hydraulic for special use up to 56
Machines N 4 Busses
N
N 604 Internal Mandrels
Workshop Truck up
4 xto 60mechanised welding
4 for
LEADERS IN PIPELINES CONSTRUCTION SINCE 1962
List
List ofof Human
employees Resources
employees as of
as 30/09/2007
of 30/09/2007
List of employees as of 30/09/2006
List of employees as of 30/09/2006
L O CLAOTCI A
ONT I ON
CLASSIFICATION
CLASSIFICATION REST OF THE
HEAD HEAD OFFICE ITALY EUROPE TOTAL
ITALY FRANCE SPAIN LIBYA IRELAND TOTAL
KAZAKHSTANWORLD
OFFICE
MANAGEMENT
MANAGEMENT 7 8 1 1 1 3 4 1 1313
ENGINEERING
ENGINEERING 5 5 5 10 8 1815
TENDERING
TENDERING / PROPOSALS
/ PROPOSALS 4 5 6 4 11
CLASSIFICATION
PROCUREMENT / MATERIAL
PROCUREMENT HANDLING
/ MATERIAL HANDLING
6 63 1 2 4 4 2 12 1710 4027
UNSKILLED
PROCUREMENT & LOGISTICS
HUMAN RESOURCES
TOTAL
COMMERCIAL & PROPOSAL
LEGAL
PLANNING & COST CONTROLLING
ENGINEERING
CONSTRUCTION
HEALTH, SAFETY & ENVIRONMENT
TOP MANAGEMENT
ICT
QUALITY
HSE 2
HSE 21 2 2 29 25 2 3431
SCHEDULER
SCHEDULER
/ COST /CONTROLLER 1
COST CONTROLLER 2 1 3 6 1 5 9
4
3
3
3
6
7
9
6
0
5
9
4
32
16
15
122
ADMINISTRATION / PERSONNEL
ADMINISTRATION 13
/ PERSONNEL 2
13 1 2 3 3 3 16 34 5 4352
PROJECT MANAGERS
PROJECT MANAGERS 3 2 3 5 3
0
0
2
0
0
0
0
0
0
1
0
0
0
0
0
1
HEAD OFFICE EUROPE
CONSTRUCTION MANAGERS 2 1 1 3 7
CONSTRUCTION MANAGERS 1 2 5 8
Human Resources
Human Resources
SUPERINTENDENTS 2 1 4 7
L O C A T I ON
SUPERINTENDENTS 2 1 12 15
6
7
91
16
47
40
23
25
36
79
10
943
134
101
3741
2183
SUPERVISORS 6 28 12 46
REST OF
30
30
46
83
10
26
10
123
949
137
104
3865
2183
TOTAL
512,8 (mln/)
(Thousands of Euro)
435,1
400
93,9
101,8
86,0
80,2
216,7
164,5
ENI CONGO Multidisciplinary activities for the realization of well head connection, mechanical installation, steel 2015
32 N/A N/A
(Congo) structures, electrical and instrumentation works for Eni Congo offshore fileds 2017
PETROMAR LDA
33 Fabrication and Trasnportation of Skid Materials for EPCI- 4 Project N/A 2-20 2014
(Angola)
Los Ramones Fase II Sur.
ICA FLUOR 2014
34 Tramo I Y II 183 42"
(Mexico) 2015
(GDI-SICIM PIPELINES S.A. DE C.V.)
OCENSA 2013
2 EPC for River San Jorge Crossing (24") by Horizontal Directional Drilling system. 1,3 24"
(Colombia) 2014
ENI CONGO Service of Global Maintenance for the Onshore Platforms and the Oil Centre of Eni Congo. (J.V. with 2012
3 N/A N/A
(Congo) RENCO) 2014
EPC and Installation Activities within MBoundi Field Development Project related to: Early Phase Water PLANT &
ENI CONGO Injection (Work Package PW8.3a); Early Phase Water Injection Network (Work Package PW8.3b); Civil 4/8/ 2009
12 PIPELINE
(Congo) Works for Site Preparation, Flare Installation and Short Term Activities (Work Package PW6) 12/16 2013
WORKS
(J.V. with RENCO)
ENI CONGO Well connection and water injection in the Oil Fields of MBoundi, Kouakouala and Loufika. 2011
13 N/A N/A
(Congo) (J.V. with RENCO) 2013
ABB S.p.A. P20030 - PW1 MBoundi. Additional manpower for PW1 Project. 2012
14 N/A N/A
(Congo) PWHT on ABB piping. 2013
ENAGAS Gasoducto Martorell - Figueras Tramo 1. 2010
15 84,6 36
(Spain) (UTE Martorell Gas) 2013
Gasoducto Tivissa Paterna Tr3 (Sud).
ENAGAS 2011
16 Contrato Marco. 64,6 40/32
(Spain) 2012
(UTE SAGUNTO)
N CLIENT DESCRIPTION OF WORKS LENGTH DN YEAR
km
BATEMAN 2008
17 Kashagan Field Development Experimental Program. Power Generation & Utility Plant. Mechanical Works. N/A N/A
(Kazakhstan) 2012
TIGF 2011
18 EPC of the Pipeline Artre du Bearn Projet (EPC Ligne). Lot: Lacq-Lussagnet. 57 32
(France) 2012
WINGAS Fernleitung OPAL von Lubmin nach Olbernhau, DN 1400. Lots 11, 12, 13 and 14 (Grossmar - Olbernhau). 2009
20 136,5 56
(Germany) (J.V. with Max Streicher GmbH) 2011
ENI CONGO EPC of the Pipeline for the Development of Zingali Oil Field and related wells connections, electrical and 2010
21 6 6
(Congo) instrumentation activities on Zingali platform. 2011
Procurement, Construction and Installation Activities with optional Engineering within MBoundi Oil Centre PLANT &
Eni Congo 2009
23 related to the phase 1 of Gas Valorisation Project & EPC for the New Gas Gathering Network and its PIPELINE 8/10
(Congo) 2011
connections at the 10 pipeline related to phase 2. WORKS
Eni Congo Engineering, Procurement and Construction (EPC) to link water wells and water treatment section in 2009
24 N/A N/A
(Congo) MBoundi. 2011
ENERGIA
OCCIDENTE DE Manzanillo - Guadalajara Gas Pipeline. 2010
25 306 30/24
MEXICO (GDI SICIM Pipelines S.A. de C.V.) 2011
(Mexico)
Snam Rete Gas 2008
26 S.p.A. Construction of Martirano-Morano Calabro Pipeline. Sections: Rende-Tarsia & Tarsia-Morano Calabro. 75 48 2010
(Italy)
BORD GAIS Construction of Curraleigh West to Midleton Gas Pipeline.
27 EIREANN 47,4 24 2009
(SICIM ROADBRIDGE LTD)
(Ireland)
Zueitina Oil Dahab Field Development Phase 1. 2008
28 Company 30 4/8/10
Installation of Oil and Water Flowlines. 2009
(Libya)
Gasoducto Ramal a Castellon.
Enags S.A. 2008
29 Contrato Marco. 15,3 16
(Spain) 2009
(J.V. with COPISA Industrial)
Gasoducto Lorca - Chinchilla Tr2 (Nord).
Enags S.A. 2008
30 Contrato Marco. 93,3 42
(Spain) 2009
(J.V. with COPISA Industrial)
Shell E&P Ireland Corrib Project Onshore Gas Terminal CMC. Provision of Welding, Installation and Inspection to D-1002 Slug 12/ 2008
31 Limited N/A
Catcher. 24/42 2009
(Ireland)
Gasoducto Arbos - Barcelona Tr2 Subtramos 1+2.
Enags S.A.
32 Contrato Marco. 5,8 36 2008
(Spain) (J.V. with COPISA Industrial)
Gaz de France Artre du Nord Est, Lot 1 Petit Tenquin-Cerville et Erching-Obergailbach Gas Pipeline.
33 59 36 2008
(France) (JV with SPAC)
TENGIZCHEVROIL Contract TCO OM200583 & TCO 598947: Pipeline Installation and Repairs, Facilities Engineering. 2006
38 (TCO) 25 6/10
Contract TCO OM201266: Mechanical & Civil Works for 2007-2008 Flip remaining Flowline Replacements. 2008
(Kazakhstan)
Parsons Fluor
Daniel International Contract 01962 - SGP Sulphur Plant. PLANT 2006
39 N/A
LLC (PFD) Various Construction Services. WORKS 2008
(Kazakhstan)
N CLIENT DESCRIPTION OF WORKS LENGTH DN YEAR
km
Parsons Fluor
Daniel International Contract 01960: SGP Sulphur Plant. PLANT 2006
40 N/A
LLC (PFD) Construction Services. WORKS 2007
(Kazakhstan)
Enags S.A. 2006
41 Gasoducto: Falces - Irurzun. 58 14
(Spain) 2008
Snam Rete Gas Gas Pipeline Camisano Vicentino-Zimella 2005
42 S.p.A. 42,2 56
(J.V. SICIM-GHIZZONI-ICOP) 2006
(Italy)
BORD GAIS Mayo to Galway Gas Pipeline - Bellanaboy to Ballymoneen. 2005
43 EIREANN 132 26
(SICIM ROADBRIDGE LTD) 2006
(Ireland)
BORD GAIS South / North Pipeline & Associated Infrastructure. 2005
44 EIREANN Lot A: Gormanston to Newry. 81 18 2006
(Ireland) (SICIM ROADBRIDGE LTD)
Snam Rete Gas 2004
45 S.p.A. Gas Pipeline Vastogirardi - Sulmona. 50 48 2006
(Italy)
Parsons Fluor 2/3/6/
Daniel International SGI Stage 1, SGI Stage 2, Korolev, Tengiz Trunklines and West Ringmain 1 Pipelines of the SGP Next 2005
46 97 8/12/
LLC (PFD) Generation Gathering System (NGGS). 16/18/24
2006
(Kazakhstan)
Snam Rete Gas Gas Pipeline Palmi-Martirano. 2004
47 S.p.A. Section Palmi - Rosarno and Maida- Martirano 47 48 2006
(Italy) (J.V. with Cambareri Giuseppe & C. S.p.A.)
TOTAL FINA ELF Great Mabruk Pipeline - EPSCC1. 4/6/ 2004
48 59
(Libya) Installation of Trunklines, Flowlines, Export Pipelines and Power Cables. 8/10 2005
Parsons Fluor Gas Export Expansion Project for Tengizchevroil.
Daniel International Gas Pipeline from Tengiz Camp to Kulsary Scraper Receiving Facility. 2003
49 121 40
LLC (PFD) Construction and Commissioning of Gas Pipeline. 2005
(Kazakhstan) (J.V. with Bonatti)
Agip Kazakhstan
North Caspian Plant Site Preparation and Piling Installation - Early Works, Experimental Programme, Kashagan East Field CIVIL 2003
50 Operating Company Development, Kazakhstan. N/A
WORKS 2005
N.V. (IGS-SICIM LLC J.V.)
(Kazakhstan)
Agip Kazakhstan
North Caspian Early Works Fuel Gas & Water Pipeline Phase 1A & 1B , Experimental Programme, Kashagan East Field 2003
51 Operating Company Development, Kazakhstan. Civil Works. 51,2 12/16 2005
N.V. (J.V. with Bonatti)
(Kazakhstan)
Agip Kazakhstan
North Caspian Camp Utilities - Early Works, Experimental Programme, Kashagan East Field Development, Kazakhstan. PLANT 2003
52 Operating Company Plant Works. VARIOUS
WORKS 2005
N.V. (J.V. with Bonatti)
(Kazakhstan)
Gaz du Sud Ouest EUSKADOUR Project 2004
53 24 24
(France) Construction of the Biriatou-Arcangues Gas Pipeline 2005
EUPEC
54 Total Forvie Mer du Nord, Welding Works, Double Joint. 32 15/17 2005
(France)
Snam Rete Gas Gasline Pontremoli - Parma. 2003
55 S.p.A. Pipeline installation accross the Appennini Mountains (North of Italy) including execution of approximately 15,5 30 2004
(Italy) 200 m of tunnel with Raise Boring tecnologies
Gas Pipeline to Galway City.
BORD GAIS Lot 1: Cappagh South to Ballymoneen Pipeline
56 EIREANN 30 12/26 2004
Lot 2: Ballymoneen to Ballygarraun Pipeline
(Ireland) (SICIM ROADBRIDGE LTD)
Karachaganak
Petroleum Provision of Telemetry System for Gas and Condensate Export Pipelines UPGRADING 2003
57 VARIOUS
Operating BV (IGS-SICIM LLC J.V.) WORKS 2004
(NL)
Enags S.A. Gas Pipeline Santa Cruz de Mudela-Salida a Cuenca. 2003
58 159 32
(Spain) (J.V. with COPISA Industrial) 2004
Karachaganak
Petroleum Infield Pipelines - Package A 6/10/ 2002
59 36
Operating BV (IGS-SICIM LLC J.V.) 14/20 2003
(NL)
Karachaganak Water Project Phase II - Industrial Water Pumping Station
Petroleum PLANT 2002
60 Installation, Construction, Commissioning and Test for the Industrial Water Intake & Treatment Facilities. N/A
Operating BV WORKS 2003
(IGS-SICIM LLC J.V.)
(NL)
Gaz de France Construction of Gas Pipeline Sections:
61 23,1 10/12 2003
(France) Meslin - Ploufragan and Durrenentzen - Colmar
North America / Mexico
Gasoducto Corredor
Chihuahua
San Isidro - El Encino
Construction of 36 Gas Pipeline from San Isidro
(Cd. Juarez) to El Encino (Chihuahua)
The construction of a 383 km long, 36-inch diameter, natural gas pipeline with
a capacity of up to 850 MMCFD for the provision of natural gas, contemplates
a pipeline commencing at an interconnection receipt point to be located on
Mexican territory near the border with the United States of America, at the
interconnection with the new line of 36 pipeline of El Paso Natural Gas and
ending at the site of the power plant(s) located at El Encino, State of Chihuahua.
Gas transport services was commenced on July 30, 2013. Pipeline is in service
and is able to serve an initial load of 95 MMCFD to the Norte II power plant.
The pipeline System have a guaranteed capacity of 850 MMCFD since the
beginning.
Client: Tharaumara
Project data: Pipe OD: 36 in API 5L X70, with wall thickness between 11.13
mm and 17.47 mm.
Natural gas.
Design conditions: - Pressure: the maximum operating pressure for the pipeline
will be 82.74 bar.
- Temperature: temperatures of GAS at the delivery point shall
be between 10 C and 50 C.
- Pipe roughness: the carbon steel pipe is new, protected
externally with FBE. Pipeline not internally coated. Pipes
delivered by Tubacero (Mexican Contractor) and Berg (US
Contractor).
- Flow: pipeline shall serve an initial flow rate of 95 MMCFD
(2.69 Millions of cubic meters per day) for the first 2 years of
operations and, a flow rate of 850 MMCFD (24.0693 Millions
of cubic meters per day) after the first 2 years.
Project Description: The project consists of the design, procurement & construction,
of a gas pipeline system:
a. 381,000 meters long and 36 of diameter.
b. 14 block valves along the path.
c. At the interconnection, receipt and delivery pig-trap, with a
control valve to be operated and controlled by the SCADA
system.
d. Border interconnection pipe and fitting.
e. 2 intermediate receipt and delivery pig-traps.
f. A measurement, regulation and control station (EMRC) at
the delivery points (El Encino) with a corresponding pig-trap
receiver.
g. Assistance to erection for the interconnection with the El
Paso Natural Gas pipeline within the Mexican territory.
Europe / France
Projet GIRLAND
EPC Ligne
Installation of a pipeline and switching stations, DN 36
Gasoducto Martorell
-Figueres Tramo Sur
Construction of Gas Pipeline from Barcelona to Girona (36)
Client: ENAGS
Consulting HYMO
engineering company:
Project data: Pipe OD: 36 in API 5L X70, with wall thickness between
11.1mm and 19.1mm.
Natural gas will be transported.
Project Description: - The pipeline originates in the existing MLV 5D split Pipeline
BBV Tramo LArbo-Plant Barcelona, located in Castellvi of
Rosanes.
- The end of the line is MLV 5D.06 in Hostalric, province of
Girona.
- There are 6 MLVs and 51 crossing (bored and open cut).
Kulsary
SGI/SGP project
Kossagyl
Tengiz field
EP
40 GE
Tengiz
TENGIZ FIELD
o
40 GEEP
6
16
The Tengiz Field, in western Kazakhstan, is located in the swamplands along the
northeast shores of the Caspian Sea. Discovered in 1979, the Tengiz oil field is one
of the largest discoveries in recent history. The city of Atyrau, 350 kilometres north
of Tengiz, is the main transport hub of Tengiz oil.
The Tengiz field will be entering a new phase of production with the construction of
the Second Generation Project (SGP) and the introduction of Sour Gas Injection
(SGI). This development started in 2004 and expected to require a total investment
of $3 billion (SGP $2.2 billion and SGI $800 million) by the scheduled completion
date of 2007.
6
Subsequent to the successful installation of the 40-inch Gas Expansion Export pipe-
6 line (GEEP), SICIM S.p.A. was awarded a contract for the installation of approxima-
tely 96 km of various diameter pipelines (up to 24). Mainly Oil Gathering Flowlines
and Trunklines in sour service and Fuel Gas Lines plus all related A.G.I. (Metering
Stations, Junctions and Manifolds).
These works were executed in the period from August 2006 to April 2006, when all
hydrotest activities were completed, all lines dewatered and finally commissioned
with the product.
Thanks to the excellent performances on this Project, either in terms of safety (0 LTI),
quality and progress, PFD/TCO expanded the original scope of work to include the
installation of additional pipelines and facilities, the testing and pre-commissioning
of pipelines and plants pipe works installed by others and all other activities required
to bring up to stream the oil field gathering system and the SGP Process Plant.
The contract duration was consequently extended to Summer 2007
In carrying out this work, SICIM S.p.A developed and implemented a Project Mana-
gement System which incorporated Quality, Safety, Environmental, Employee Re-
lations and Plant Management for all projects. The key element is the use of core
procedures and core mechanisms from UNI EN ISO 9001:2000 to make our plans
more dynamic and to ensure that all objectives are identified and achieved.
Ground condition: Sand and silty ground in warm season, frosty ground in
winter season.
Mainline welding: Manual welding (SMAW) (according to API 1104)
Manual welding (GTAW) (according to API 1104)