S. NO. Activity Responsibility Unit
per Scope
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 Letter of Intent (zero date) Employer
2 PERT Chart TC / E
3 Submission of CPG TC
6 LoA Employer
16 Survey
16.01 Foot survey
16.02 Approval of Survey report
(Employer)
O/O The Chief Engineer(D & R)
Department of Power (Turnkey Contractor)
Government of Nagaland, Signature
Kohima-797001 Name of Authorised Signatory
Nagaland Designation
Note-
1 Approving authority of Employer shall sign and stamp the PERT chart on approval.
2 approved PERT chart shall be part of contract agreement.
3 Original PERT chart shall not be changed during execution of project.
4 Revision in PERT chart or acceptance of catch up plan, shall be within overall contract execution period of the project.
5 Revised PERT chart / catch up plan shall be signed by same authorities of Employer and Turnkey contractor.
6 Approved PERT chart shall be basic document to take a decision on extension of time for contract and to evaluate performance of project execution contractor.
7 Item wise responsibility should be identified between Employer and turnkey contractor
8 Clear time line to be agreed for various activities between Employer and Turnkey Contractor
9 Unique reference no. to be assigned with date to approved PERT chart by Employer.
10 Any revision should be clearly assigned with unique reference no., date and revision no. (R1/R2/R3 etc)
11 Items specified may be customised based on project formation.