You are on page 1of 5

// Technical Scrutiny // WTPS/SE (M-II) TMD-II/2017/

Date: 16.08.17

Sub: Supply of complete HP Turbine Module in assembled condition consisting of HP turbine rotor with blading, HPT inner
casing & outer casing along with all accessories, Instrument components for 210 MW KWU design BHEL make units of
GSECL.
Ref: (1) TMD-II Requisition No: 63170
(2) Inquiry to BHEL No: GSECL/CEG/GP/1582/HPT-KWU/WTPS/395, dtd 12.04.17
(3) Inquiry to SIEMENS No: GSECL/CEG/GP/1582/HPT-KWU/WTPS/396, dtd 12.04.17
(4) BHEL Offer No: 017012/PS/SSBG/VDR/WNT/17042/73, dtd 09.06.17
(5) SIEMENS Offer No: SF16999636, dtd 07.06.17
(6) COL to M/s Siemens no: CEG/GP-III/1582/1092 dtd: 15.06.17.
(7) COL to M/s BHEL no; CEG/GP-III/1582/1091 dtd: 15.06.17.
(8) COL No: CEG/GP-3/1582/1090, dtd 15.06.2017 with complete case file received on 16.06.17.
(9) M/s Siemens reply to CO vide letter no: SF16999636 dtd: 22.06.17
(10) TOL to M/s BHEL: WTPS/SE (M-II)/TMD-II/HP Turbine/4120 dtd: 27.06.17 and subsequent reminders thereof dtd:
04.07.17, 08.07.17 & 17.07.17
(11) TOL to M/s Siemens: WTPS/SE (M-II)/TMD-II/HP Turbine/4139 dtd: 27.06.17 and subsequent reminder thereof
dtd:17.07.17.
(12) M/s BHEL reply to CO vide letter no: 017012/PS/SSBG/VDR/WNT/17042/93 dtd: 29.06.17.
(13) M/s BHEL Reply letter to WTPS no: 017012/PS/SSBG/VDR/WNT/17042/110 dtd: 17.07.17.
(14) M/s Siemens Reply to WTPS letter no: SF16999636 dtd: 17.07.17.
(15) TOL to M/s BHEL: WTPS/SE(M-II)/TMD-II/HP Turbine/4217 dtd: 25.07.17.
(16) M/s BHEL reply to WTPS no: 017012/PS/SSBG/VDR/WNT/17042/122 dtd: 02.08.17 Recd on 03.08.17.
(17) Our Query Email dtd: 03.08.17.
(18) M/s BHEL reply Email dtd: 09.08.17.

Technical scrutiny for case file No: GP-1582 for two parties viz M/s. SIEMENS & BHEL is tabulated as under.

Sr Particular M/s. SIEMENS M/s. BHEL


no.
01 Tender Fee:Rs10000.00 Opened tender received from CO. Paid through RTGS
02 EMD: Rs. 34,65,450.00 As per Siemens comment in Being Govt PSU Requested to
technical bid- EMD submitted along exempt EMD submission.
with Bid in form of Bank Guarantee.
03 Payment terms clause no 03. Agreed Agreed.
04 Penalty clause no 04. Agreed. Agreed.
05 Approximate Gross weight of the materials Agreed and provided as per letter at Agreed and provided as per letter at
clause no.05. ref(9) & (14) ref (12) & (13).
06 Delivery period- 18 Months clause no.06 Agreed Agreed.
07 Valididty-120 Days clause no.07 Agreed. Agreed.
08 Undertaking clause no 09. Replied as per letter at ref(9) & Not Agreed as per letter at ref (12) &
(14), that it is already submitted in (13).
Price Bid however Siemens have
submitted again on their letter.
09 Security deposit clause no.12. Agreed. Being Govt PSU, has requested to
exempt the Security deposit.
10 Performance Guarantee clause no 13. Agreed. Agreed as per letter at ref (16).
11 Performance bank Guarantee clause no 14. Agreed Agreed.
12 Purchase agreement clause no. 16. Agreed as per letter at ref (9) & Not Agreed as per letter at ref (12) &
(14). 13).
13 (a) Repeat/Additional orders as per (a) Confirmed clause no.17, Replied as per letter at ref (14), that
clause no.17 (b) Confirmed point no 18 with clause no (a) - Acceptable.
(b) Accept/reject and reduce/ enhance condition of understanding (b)- Acceptable.
quantities of spares as per clause that such changes will b (c)- Acceptable
no.18. before award of contract. Subject to mutual agreement
(c) Termination of contract as per clause (c) Confirmed with condition of between M/s GSECL & M/s BHEL.
no. 22. understanding that such
changes shall be on mutual
agreement and cost
compensation.
14 Interchangeability as per clause no 19. Agreed as per letter at ref(9)&(14) Agreed as per letter at ref(12)

15 Supplied material should be properly packed Agreed as per letter at ref (9). Not agreed to GSECL standard
as per clause no.20. clause. As per letter at ref (12). Any
damage during transit is to be settled
by GSECL with Insurance agency.
16 Latest order copy of similar items supplied to Not submitted, however submitted Not Agreed as letter at ref (12) & 13).
other 02 Page contract copy between
Organization/Govt.organization/GSECL/PSU BHEL and SIEMENS for supply of 1
along with offer as per clause no.21. X 800MW Turbine of Wanakbori.
WTPS.
17 Arbitration and Jurisdiction as per clause no Agreed as per letter at ref (9) & Agreed as per letter (12) & (13).
23 & 24. (14).
18 Inspection as per clause no 25. Agreed as per letter at ref (9) & Agreed as per their quality plan in
(14). their letter at ref (13).
19 Technical assistance for installation of Agreed. Replied as per letter at ref (16),
subjected spares at free of cost. Clause Agreed for technical assistance only
no.26. in case installation is done within 18
months of receipt of material at
GSECL end.
20 Drawing and Material approval. Clause no Conditionally agreed as per letter Not submitted with technical bid but
27. at ref (14), replied that shall be replied confirmed as per letter at ref
provided, subject intellectual (13).
property rights, after issue of order.

21 Quality Certificate as per clause no 28. Agreed as per letter at ref (14), Agreed.
replied to be submitted before
dispatch.
22 FOR Destination as per Clause no 29. Agreed. Not Agreed. FOR BHEL works only.
Freight and transit insurance from
BHEL works to WTPS to be borne
by GSECL.
23 Documents as per Clause no.30. Agreed as per letter at ref (14), Agreed as per letter at ref (13),
replied to be submitted before replied that it shall be as per BHEL
dispatch. quality plan.
24 You are requested to visit site office to know Agreed and submitted Drawing, Not submitted Drawing & MOC
the exact requirement and to access MOC and manufacturing schedule along with their technical bid and
technical know, submit drawing & MOC with with the technical bid and replied Noted as per their letter as
technical bid ..And all the drawings should conditionally agreed in their offer per ref(13)
be got approved within 15 days from the that detailed drawing will be
date of acceptance of LOI as per clause submitted prior to dispatch of HPT
no.31. module also replied that Siemens is
original equipment designer and
manufacturer of these machines
and will manufacture as per
standard drawing and MOC.
25 Supply material as per Schedule-B and Agreed as per letter at ref (9) & Agreed as per letter at ref (13).
Annexure-A as per Clause no.32. (14).
26 Guarantee /Interchangeability & retro fitment Agreed as per letter at ref (9) & Agreed as per letter at ref (16).
certificate/Quality Assurance/Material (14).
Construction/Literature as per Clause no.33.
27 Submit all Shop Protocol reading at time of Agreed as per letter at ref (14). Agreed.
supply as per Clause no.34.
28 Buy back as per clause no.35 & 36. Agreed as per letter at ref (9) & Regretted/Not Agreed.
(14).
29 Quantity distribution will be on overall lowest Agreed as per letter a ref (14). Remarked as Noted.
party basis as per clause no. 37.
30 Technical Specifications (a) Submitted. (a) Submitted.
As per Schedule-B i.e. (b) Submitted 87.6% efficiency. (b) Submitted 87.65% efficiency
(a) Specify type of moving & fixed blades (c) Submitted. (c) Submitted.
for steam path. (d) Submitted 100000 (d) Submitted 50000 Equivalent
(b) Specify the efficiency of HPT module Equivalent operating hours. operating hours.
to be offered. (e) Submitted. (e) Submitted.
(c) Submit Design operating life of HPT
module.
(d) Submit the operating life of HPT
module before first major inspection of
turbine.
31 (e) Specify
Deviations surface
observed inroughness
the bid. quality of a) Has agreed to clause no 17, a) Has requested for EMD
18 & 22 subject to mutual exemption.
agreement. b) Not agreed to clause no.9
b) Not submitted the previous c) Has requested for exempt SD
order copy as per clause no clause no. 12.
21. However submitted 02 d) Not agreed to no. 16.
page contract copy between e) Has agreed to clause no 17,
BHEL and Siemens- we may 18 & 22 subject to mutual
agree. agreement.
c) Partial submission of f) Not agreed to clause no.20
documents as per clause g) Not agreed to clause no.21-
no.27. However replied as we may agree..
confirmed and shall be h) Not agreed to clause no.26.
provided, subject intellectual i) Not submitted the documents
property rights, after issue of as per clause no.27. However
order- we may agree.. replied as confirmed in their
d) Partial agreement to clause letter- we may agree.
no 31- we may agree.. j) Not agreed to clause no 29.
e) Deviation point no. 1 to 8 of k) Not submitted the documents
Chapter V: as per clause no 31- we may
Point 6: - we may agree agree..
l) Not agreed to clause no 35 &
36.
Point no (d) as per Schedule-
B.
Note: The technical Scrutiny of the two participated bidders i.e. M/s Siemens Ltd and M/s BHEL has been carried out in
tabulated form and the deviations observed in the technical bid are mentioned at Sr no 31 of scrutiny table that are
forwarded for guidance.
E.E (TMD-II & III) D.E (TMD-II).

Through:

SE (M-II):

ACE (O &M):

CE(C &O):