Professional Documents
Culture Documents
Presupuesto CONSTRUCCION DE PUENTE CARROZABLE LOS JADES - PROLONGACION LOS JADES, POCOLLAY
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA 3.60x2.40 MT und 1.00 1.00 1,037.00 1,037.00
01.02 MOVILIZACION DE EQUIPOS Y HERRAMIENTAS glb 1.00 1.00 1,000.00 1,000.00
01.03 CASETA DE ALMACEN Y GUARDIANIA m2 40.00 40.00 69.24 2,769.60
01.04 LIMPIEZA Y DESBROCE DE TERRENO MANUAL m2 131.82 131.82 3.12 411.28
01.05 TRAZO Y REPLANTEO INICIAL m2 131.82 131.82 2.39 315.05
01.06 TRAZO Y REPLANTEO DURANTE LA OBRA m2 131.82 131.82 15.82 2,085.39
02 SEGURIDAD Y SALUD
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION PARA ESTRIBOS EN TERRENO NATURAL m3 639.66 639.66 36.36 23,258.04
03.02 EXCAVACION PARA ESTRIBOS BAJO AGUA m3 131.82 131.82 36.36 4,792.98
03.03 RELLENO COMPACTADO CON GRAVA ESPALDAR ESTRIBO m3 544.72 544.72 50.78 27,660.88
04.01 SUB - ZAPATA CONCRETO CICLOPEO F'C=140 KG/CM2 m3 98.21 98.21 165.44 16,247.86
04.02 SOLADO DE CONCRETO C:H, 1:8 E=2" m2 79.36 79.36 158.07 12,544.44
04.03 CONCRETO F'C=140 KG/CM2 - VEREDA DE PIEDRA LAVADA E=0.10 M. m2 29.40 29.40 40.15 1,180.41
04.05 FALSO PISO P/APOYO DE FALSO PUENTE m2 72.80 72.80 15.60 1,135.68
05.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA - ESTRIBOS Y MUROS m2 346.82 346.82 143.26 49,685.43
05.01.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 9,397.03 9,397.03 4.57 42,944.43
05.02.01 CONCRETO F'C=280 KG/CM2 - VIGAS PRINCIPALES m3 21.00 21.00 543.91 11,422.11
05.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA - VIGAS PRINCIPALES m2 84.00 84.00 80.03 6,722.52
05.02.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 4,960.58 4,960.58 4.57 22,669.85
05.03.01 CONCRETO F'C=280 KG/CM2 - VIGAS DIAFRAGMAS m3 2.03 2.03 496.64 1,008.18
05.03.02 ENCOFRADO Y DESENCOFRADO CARAVISTA - VIGAS DIAFRAGMAS m2 14.58 14.58 80.03 1,166.84
05.03.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 402.36 402.36 4.57 1,838.79
05.04.01 CONCRETO F'C=280 KG/CM2 - LOSA DE PUENTE m3 10.94 10.94 513.20 5,614.41
05.04.02 ENCOFRADO Y DESENCOFRADO NORMAL - LOSA DE PUENTE m2 62.43 62.43 62.51 3,902.50
05.04.03 ACERO CORRUGADO FY=4200 KG/CM2 GRADO 60 - LOSA DE PUENTE kg 1,488.93 1,488.93 4.57 6,804.41
05.05.02 ENCOFRADO Y DESENCOFRADO NORMAL - LOSA DE APROXIMACION m2 5.96 5.96 57.01 339.78
05.05.03 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 775.05 775.05 4.57 3,541.98
06 FALSO PUENTE
07 OTROS
07.01 APOYO FIJO DE NEOPRENO SHORE 7.0 DE 0.35x0.35 und 3.00 3.00 1,553.47 4,660.41
07.02 APOYO MOVIL DE NEOPRENO MOVIL SHORE 70 40x30 und 3.00 3.00 1,898.58 5,695.74
07.03 DRENAJE PLUVIAL TUBERIA PVC 6" m 28.40 28.40 19.76 561.18
07.04 DRENAJE PLUVIAL TUBERIA DE PVC 3" m 9.80 9.80 19.01 186.30
09 OBRAS COMPLEMENTARIAS
10 AFECTACIONES
EXPEDIENTE TECNICO
SUPERVISION (3.0%)
LIQUIDACION (1.0%)
TOTAL PRESUPUESTO
Precio S/. Parcial S/. Total S/.
5,940.51
1,050.34 1,050.34
1,000.00 1,000.00
70.33 2,813.20
3.29 433.69
2.44 321.64
2.44 321.64
7,862.50
154.50 3,862.50
1,000.00 1,000.00
1,500.00 1,500.00
1,500.00 1,500.00
108,444.89
38.45 24,594.93
38.45 5,068.48
51.38 27,987.71
38.45 37,063.11
13.93 13,427.54
22.42 303.12
36,891.08
168.85 16,582.76
163.06 12,940.44
41.29 1,213.93
45.83 648.95
16.50 1,201.20
31.88 4,303.80
235,032.68
544.54 136,102.33
148.15 51,381.38
5.06 47,548.97
41,535.13
473.20 9,937.20
77.35 6,497.40
5.06 25,100.53
4,023.25
423.42 859.54
77.35 1,127.76
5.06 2,035.94
16,029.87 570
440.70 4,821.26
58.86 3,674.63
5.06 7,533.99
8,682.97
408.75 4,410.41
58.86 350.81
5.06 3,921.75
11,548.26
158.63 11,548.26
17,694.69
1,558.72 4,676.16
1,917.48 5,752.44
20.70 587.88
19.95 195.51
119.87 239.74
195.54 5,475.12
11.39 47.84
720.00 720.00
1,500.00
1,500.00 1,500.00
1,324.94
958.95 958.95
1.27 365.99
57,220.80
420.00 57,220.80
553,731.58
55,373.16
609,104.74
10,500.00
18,273.14
6,091.05
24,364.19
668,333.12