Professional Documents
Culture Documents
Wagon No.
Bogie Make . DV
1.
Pressure in BP 5 + 0.1 kg/cm2
175 + 30 Sec.
3.1 AR Charging Time
165 + 20 Sec
3.2 CR Charging Time
Full service application.
4.
Brake cylinder filling time
(Pressure rise from 0 to 3.6
kg/cm2)
4.1. a). Empty 18 to 30 sec.
Reduction in BP pressure
required for full service
4.3 1.3 to 1.6 kg/cm2
application.
Piston stroke.
9. a) Empty
b) Loaded
Leakage from brake cylinder 0.1 kg/cm2 within 5
10. after emergency application. minutes.