I. INTRODUCTION ....................................................................................... 3
II. REQUIREMENT
1. Approval and repair execution shall be as per ITP of ___
2. The strength, durability and other characteristics of the repair materials shall be 50
Mpa or higher.
3. Acceptance of repaired area shall meet the following criteria:
a. Even and uniform smooth surface at 10mm deviation for every 3 meters
b. Defect and crack free surface
c. The same finish level of surface for the entire raft
4. Mixing and pouring time shall not exceed ___ minutes at 35 Degrees Centigrade
ambient temperature.
5. Sampling of mixture for repair mater material shall be executed by ___- as per
standard sampling and testing procedure.
III. REFERENCE
Execution of works shall be read in conjunction with the following references and
approvals:
IV. RESOURCES:
1. Manpower:
1 Site Engineer
1 Foreman
1 QC Inspector
1 HSE officer
5 Mason
1 Carpenter
10 Helpers
2. Materials:
Approved concrete material
Water
Formworks
Hessian clothe
Polyethylene sheets
3. Tools/Equipment:
Troweling tools
Shovel
Wheel Barrow
Bucket
Bagger Mixer
Slow drill with attached paddle
Mechanical Chisel
Milling machine
Volumetric measuring tools
Tower lights
Jerome Fortaleza Page 3 of 5
Hard Brush
Air compressor
Water tank and hose
V. METHODOLOGY
1. Clear and barricade the area to be repaired.
2. Conduct investigation of the defective area:
a. Prepare topographic survey report showing the deviation of the surface.
b. Determine the extent of the defects in the raft surface to be repaired showing the
locations in the shop drawing
3. Surface preparation
a. The area for repair should be sawn cut.
b. For wide area: roughen surface of the concrete using concrete milling machine,
angle grinder with grinder masonry blades and mechanical chisel. Removing of
surface shall be 10mm minimum from the surface of hardened concrete.
c. Deep undulation shall be roughened using mechanical chisel.
d. Ensure that the surface is clean, dry, even, dense and free from oil, grease, dust
and other contaminants.
e. Clean the substrate using brush and air compressor.
f. Acceptance of surface preparation shall be clean, damp, rough and sound
concrete substrate.
VI. ATTACHMENT