You are on page 1of 16

UNOPS

UNITED NATIONS OFFICE FOR PROJECT SERVICES

ESTIMATE

ANDMA Building in Heart


Herat, Afghanistan

2-Story Administration Building and a Guardhouse

NOTE:

This estimate is part of the complete project documents and must be read
together with these documents. Complete project documents include the
drawings, estimate, schedules and specifications.

Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Tender Title: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010
UNOPS

UNITED NATIONS OFFICE FOR PROJECT SERVICES

BILL OF QUANTITIES

ANDMA Building in Heart


Herat, Afghanistan

2-Story Administration Building and a Guardhouse

NOTICE TO ALL BIDDERS - COMPLETE PROJECT PRICE:

1. All bidders MUST examine the complete project documents. These


documents include the Drawings, BOQ, Schedules and Specifications. Any
discrepancies between these documents are to be brought to the
immediate attention of UNOPS Engineer.

2. Quotation given by the contractor on this BOQ are to cover any and all
additional materials, labor or associated costs to complete the works as
documented on the complete project documents.

3. Eventual claims for extra works are covered by project general


documentation of contract.

Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Tender Title: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

0 0
0 ###
UNOPS
Vertical Structures Unit
DETAILS OF COMPONENT
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
1. General
1.1 Preliminaries 1.1 Occupied Areas, 1.1 Existing
Services Schedule and 1.1 Items
to be supplied schedules

1 Pre-construction work, mobilisation activities


including paper/ documentation tasks. LS 1.00 -
2 Post construction works and clean up.
LS 1.00 -
1.2 General Requirements 1.2 Inspection notification
schedule and 1.2 Warranty
schedules
1 Testing and Operation/Maintenance Manuals.
LS 1.00 -
Subtotal General -

2. Site
2.0 Deal with Graves 2.1 Identified hazardous materials
and 2.3 Earthwork schedules

1 Deal with human remains found in unmarked


graves on the site. Excavate, remove remains,
place in a suitable container, and re-bury
remains in a place to be agreed by local
authorities. All work to be carried out in a
manner that does not offend religious and
cultural rules and norms.
No. 5.00 -
2.3 Earthwork 2.1 Identified hazardous materials
and 2.3 Earthwork schedules

1 Excavation (any soil type) for main building


foundation and surrounding yard for grading
purposes. This item includes disposal and
temporary support or shoring if needed. See
drawing and schedule for details. CU.M 1,300.00 -
2 Excavation (any soil type) for guard room
foundation. This item includes disposal and
temporary support or shoring if needed. See
drawing and schedule for details. CU.M 25.00 -
3 Excavation (any soil type) for septic tank. This
item includes disposal and temporary support or
shoring if needed. See drawing and schedule
for details. CU.M 110.00 -
4 Ground improvement under foundations of main
building. This includes supplying of filling
materials and compacting the layers according
to schedule and drawings. CU.M 15.00 -
5 Soil backfilling on and around foundation of the
main building up to ground level. This includes
supplying of needed materials. See drawings
and schedules for levels/dimensions and
details. CU.M 20.00 -

3/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
6 Soil backfilling on and around foundation septic
tank up to ground level. This includes supplying
of needed materials. See drawings and
schedules for levels/dimensions and details.
CU.M 45.00 -
7 Soil backfilling on and around foundation of
guard room up to ground level. This includes
supplying of needed materials. See drawings
and schedules for levels/dimensions and
details. CU.M 10.00 -
8 Gravel compaction, Class 2, at any places
shown for main building foundations, floors and
its sidewalk/ramp. The cost includes leveling
and compaction of ground surface, and
supplying of needed materials and its
compaction. See drawing and project schedules
for dimensions and details.
CU.M 43.00 -
9 Gravel compaction, Class 2, for entire
parking/walkway areas at the yard. The cost
includes leveling and compaction of ground
surface, and supplying of needed materials and
its compaction. See drawing and project
schedules for dimensions and details.
CU.M 30.00 -
10 Gravel compaction, Class 2, for septic tank. The
cost includes leveling and compaction of ground
surface, and supplying of needed materials and
its compaction. See drawing and project
schedules for dimensions and details.
CU.M 15.00 -
11 Gravel compaction, Class 2, for guard room.
The cost includes leveling and compaction of
ground surface, and supplying of needed
materials and its compaction. See drawing and
project schedules for dimensions and details.
CU.M 12.00 -
2.4 Service Trenching 2.1 Identified hazardous materials,
2.1 Salvaged Materials for Re-use
and 2.3 Earthwork schedules

NOTE: Cost for trenching in this section includes all


needed excavation, filling, compaction of different
layers, warning tapes and any other thing shown on
the drawing for the trenches.

1 All trenches for sewerage systems.


Lin M 50.00 -
2 All trenches for electrical systems.
Lin M 50.00 -
Subtotal Site -

3. Structure
3.1 Concrete-General 3.1 Non reinforced concrete, 3.1
Reinforced concrete and 3.2
Concrete- Integral Finishes
schedules
NOTE: Cost for concrete items in this section
includes reinforcement, steel anchorage embedded in
concrete, shuttering, concrete, concrete curing and all
to the complete job.

1 PCC lean concrete (10 Mpa) under the


foundations and any other places shown as
lean concrete for septic tank. CU.M 2.00 -

4/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
2 RCC (20 Mpa) at the foundtions of 2-story main
building. The quantity includes RCC at
foundations and tie beams under the ground. CU.M 18.00 -
3 RCC (20 Mpa) at the columns of first story of
main building. CU.M 13.00 -
4 RCC (20 Mpa) at the columns of second story
of main building. CU.M 11.00 -
5 RCC (20 Mpa) at the beams of first story of
main building. CU.M 10.00 -
6 RCC (20 Mpa) at the beams of second story of
main building. CU.M 10.00 -
7 RCC (20 Mpa) at the slabs of first story of main
building. CU.M 20.00 -
8 RCC (20 Mpa) at the slabs of second story of
main building. CU.M 19.00 -
9 RCC (20 Mpa) at the RCC stair case inside
main building. CU.M 4.00 -
10 RCC (20 Mpa) at the parapet of main building.
CU.M 4.00 -
11 RCC (20 Mpa) at the entire guard room. The
quantity includes RCC at foundations, floors,
columns, beams, ring beams, lintels, etc. CU.M 6.00 -
12 RCC (20 Mpa) at entire septic tank and its
manhole. The cost for RCCs here includes wall
mounted fixed ladder inside the septic tank as
well. CU.M 15.00 -
13 PCC (20 Mpa) at the floors, roofs, side walks,
ramps, window sills, kerbs, PCC pavements,
flowerpots, septic tank, yard, and any other
places shown as PCC in the drawings for main
building, guard room and the septic tank.
CU.M 63.00 -
3.5 Brickwork 3.5 Brickwork construction
schedule
1 Second Class Brick masonry with mortar for
main building. This includes all brick walls/ brick
masonry in the entire building. CU.M 110.00 -
2 Second Class Brick masonry with mortar for
guard room. This includes all brick walls/ brick
masonry in the entire building. CU.M 18.00 -
3.6 Stonework
1 Stone masonry with mortar at the foundations
and/or any places shown in the drawings for
main building. See drawing and schedule for
details. CU.M 50.00 -
2 Stone masonry with mortar at the foundations
and/or any places shown in the drawings for
guard room. See drawing and schedule for
details. CU.M 13.00 -
3.10 Concrete Unit Masonry 3.10 Concrete Unit Masonry

1 CMU masonry with mortar. This item covers


CMU works on the roof and any other places
shown on the drawings for main building. The
cost includes all needed materials, steel bars,
anchors etc and works. CU.M 7.00 -
Subtotal Structure -

4. Enclosure
4.1 Waterproofing 4.1 Waterproofing system
schedule

5/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
1 Single layer bitumen membrane (Isogam) at the
floor and walls of toilets/kitchen and at the
ground floors of main building and as well as
guard room. This includes preparation of base
layers shown on the drawings. Refer to
schedule/drawing for details.
SQ.M 255.00 -
4.2 Roofing 4.2 Roofing materials, and 4.2
Gutter and Down pipe Schedules
1 Flat roof for the main building. The cost for this
item includes all roof layers shown such as rigid
foam insulation layer, brick powder layer, PCC
beneath Isogam layer, Isogam layer and the
protective PCC layer on the Isogam. See
drawings for details. The cost also includes
Isogam and flashings needed for the parapet
around the roof.
SQ.M 160.00 -
2 GI corrugated roof for water tank enclosure on
the roof of the building. The cost for this item
includes all roof layers such as GI sheet, steel
profiles for purlins, steel C-shape channels as
the supporting members, mineral wool layer
and the steel mesh supporting the mineral wool
layer, and as well as all needed materials and
accessories required for complete installation of
a functioning roof.

SQ.M 10.00 -
3 GI flat K-span roof for guard room. The cost for
this item includes all roof layers such as GI
sheet standing seam and mineral wool
insulation layer and all needed materials,
accessories, connections required for complete
installation of a functioning roof.
SQ.M 51.00 -
4 Down pipes, PVC pipe class-B. This includes all
accessories such as over flow and stuff-holder
required for complete installation such as
supplying, fixing and others as per drawing and
schedules. Lin M 40.00 -
4.3 Windows and Window Hardware 4.3 Window, 4.3 Window
Hardware, 4.5 Annealed Glasses,
and 4.6 Glassblock work
schedules
NOTE: Prior to work, samples must be approved by
UNOPS Engineer.

1 Wooden frame windows for main building. The


work includes making, transportation,
installation, hardware, glazing, glass-block work
around window, insect screen, 3 coats of oil-
based painting, and other accessories required
for complete installation as per drawings and
schedule.
SQ.M 102.00 -
2 Wooden frame windows for guard room. The
work includes making, transportation,
installation, hardware, glazing, glass-block work
around window, insect screen, 3 coats of oil-
based painting, and other accessories required
for complete installation as per drawings and
schedule.
SQ.M 6.00 -
4.4 Doors and Door Hardware 4.4 Joinery doors 4.4 PVC doors,
4.4 Steel doors and 4.5 Annealed
Glasses schedules
NOTE: Prior to work, samples must be approved by
UNOPS Engineer.

6/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
NOTE: Cost for steel related items in this section
includes supplying materials, accessories,
connections, welding, any works, painting according
to the schedules and specifications for steel member
painting, which is at least on coat of anti-rust followed
by 2 other coats of oil-based painting for all surfaces.

1 Wooden frame doors for main building. The


work includes making, transportation,
installation, hardware, glazing, and other
accessories required for complete installation
as per drawings and schedule. SQ.M 58.00 -
2 Wooden frame doors for guard room. The work
includes making, transportation, installation,
hardware, glazing, and other accessories
required for complete installation as per
drawings and schedule. SQ.M 9.00 -
3 Steel frame doors (for water tank enclosure on
main building). The work includes making,
transportation, installation, hardware, glazing, 1
coat of anti-rust followed by 2 other coats of oil-
based painting, and other accessories required
for complete installation as per drawings and
schedule.
SQ.M 0.80 -
4 Steel doors [the access way to the roof of main
building] plus steel type fixed ladder at first floor
hall. The work and the cost includes
construction and complete installation of inner
steel door to the ceiling of the first floor, and
installation of outer steel plate pane at the roof,
and as well as wall mounted steel ladder as
shown. The cost also includes all
hardware/accessories/works/materials needed
to a complete and functioning job. The cost also
includes one coat anti-rust followed by 2 other
coats of oil-based painting to all non-galvanized
steel surfaces as per given specs and full
satisfaction of UNOPS engineer.

LS 1.00 -
4.5 Glazing 4.5 Mirrors schedules

1 Mirrors (40x60cm) at toilets of main building and


the guard room. This includes complete
installation. No 7.00 -
4.6 Glass Blockwork 4.6 Glass Block Schedule

1 Mortar jointed panels glass blockwork at


window 'W6'. This includes reinforcement and
all other accessories required for complete
work. See drawing and schedule for details.
SQ.M 12.00 -
Subtotal enclosure -

5. Interior
5.4 Suspended Ceiling 5.4 Suspended Ceiling Schedule

1 Lasani wooden board, 6mm, fixed ceiling for


soffits and ceilings of the water tank enclosure
on main building. The cost includes fixings,
accessories, materials, works, oil based
painting etc for a complete job to the full
satisfaction of Engineer.
SQ M 10.00 -

7/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
2 Aluminum frame with 60x60 gypsum board
suspended ceiling for guard room. The cost
includes fixings, accessories, materials, works,
etc for a complete job to the full satisfaction of
Engineer. SQ M 28.00 -
5.5 Joinery 5.5 Joinery fixtures schedule

1 Wooden frame, MDF finish, wall mounted


cabinet at the kitchen for main building. See
drawings for details. The cost includes making,
installation, framing, hardware, finish, 3 coats
oil-based painting and all to the complete job.
LS 1.00 -
2 Wooden frame, MDF finish, wall mounted
cabinet at the kitchen for guard room. See
drawings for details. The cost includes making,
installation, framing, hardware, finish, 3 coats
oil-based painting and all to the complete job.
LS 1.00 -
3 Wooden frame, MDF finish, floor mounted
cupboard at the kitchen for main building. See
drawings for details. The cost includes making,
installation, framing, finish, hardware, stone
table top, splash back, 3 coats oil-based
painting and all to the complete job.
LS 1.00 -
4 Wooden frame, MDF finish, floor mounted
cupboard at the kitchen for guard room. See
drawings for details. The cost includes making,
installation, framing, finish, hardware, stone
table top, splash back, 3 coats oil-based
painting and all to the complete job.
LS 1.00 -
5.6 Metalwork 5.6 Metal Fixtures Schedule

1 Metallic plaster beads for outer corners at the


corridors only, including edge of walls for main
building and as well as for guard room. This
includes any needed work for complete
installation. See schedules and drawings for
details.
Lin M 95.00 -
2 Metal handrails, balustrades, infill and moldings
to concrete stairs for main building. This
includes any needed work for complete
installation and also includes painting as per
schedule and specification for metallic surface
painting. See drawing for details.
Lin M 8.00 -
3 Metal guardrails at stair's landing for main
building. This includes any needed work for
complete installation and also includes painting
as per schedule and specification for metallic
surface painting. See drawing for details.
Lin M 2.20 -
4 Metal handrails, balustrades, infill and moldings
to concrete for ramp. This includes any needed
work for complete installation and also includes
painting as per schedule and specification for
metallic surface painting. See drawing for
details.
Lin M 11.00 -
5 Toilet roll holders for main building and guard
room. This also includes installation. No 7.00 -
6 Grab rail for handicap toilet. One complete set.
This includes supplying and complete
installation. LS 1.00 -

8/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
7 Soap dishes for main building and guard room.
This also includes installation. No 7.00 -
5.8 Fire Extinguishers and Blankets 5.8 Fire Extinguishers Schedule
1 Extinguishers at main building and guard room,
wall mounted, powder-type (9kg). No 3.00 -
Subtotal Interior -

6. Finish
6.1 Plastering 6.1 Plastering Schedule

NOTE: Prior to work, samples must be approved by


UNOPS Engineer.

Internal and external surfaces

1 Cement render medium CRM followed by


cement render fine CRF on all internal and
external surfaces of walls/ ceilings/ beams/
columns/ reveals/ parapets, porches etc for
main building. See schedule for detail. SQ.M 1,940.00 -
2 Cement render medium CRM followed by
cement render fine CRF on all internal and
external surfaces of walls/ ceilings/ beams/
columns/ reveals/ etc for guard room. See
schedule for detail. SQ.M 200.00 -
6.3 Tiling 6.3 Wall tiling and 6.3 Floor tiling
schedules
NOTE: Prior to work, samples must be approved by
UNOPS Engineer.

For main building:


1 Ceramic wall tiles for toilets, kitchen. The cost
includes bed preparation, bedding and grout.
SQ.M 90.00 -
2 Ceramic floor tiles for toilets including bed
preparation, bedding and grout. SQ.M 43.00 -
3 Marble tiles for all rooms and halls where did
not receive ceramic tiles. The cost includes
bedding and grout. SQ.M 202.00 -
4 Marble skirting for all rooms and halls where did
not receive ceramic tiles. The cost includes
bedding and grout. Lin M 210.00 -
5 Granite tiles (30mm) for stairs treads and
landings including bedding and grout. SQ.M 15.00 -
6 Granite tiles (10mm) for stairs raise including
bedding and grout. SQ.M 4.00 -
7 Granite skirting for stairs including bedding and
grout. Lin M 14.00 -
8 Granite tiles for internal window sill at window
W6, including bedding and grout. No 1.00 -
For guard room:
9 Ceramic wall tiles for toilets, kitchen. The cost
includes bed preparation, bedding and grout.
SQ.M 40.00 -
10 Ceramic floor tiles for toilets including bed
preparation, bedding and grout. SQ.M 14.00 -
11 Marble skirting for all walls that did not receive
ceramic tiles. The cost includes bedding and
grout. Lin M 13.00 -
6.6 Painting 6.6 Interior/Exterior painting
schedule
NOTE: Prior to work, samples must be approved by
UNOPS Engineer.

9/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
Internal surfaces

1 Flat water based: Interior, on all surfaces that


receive cement plaster for main building. The
cost includes wall putty (gypsum filling) layer
before painting and all needed preparation of
the surfaces for painting. See schedule for
detail on this paint system
SQ.M 1,450.00 -
2 Flat water based: Interior, on all surfaces that
receive cement plaster for guard room. The cost
includes wall putty (gypsum filling) layer before
painting and all needed preparation of the
surfaces for painting. See schedule for detail on
this paint system
SQ.M 105.00 -
External surfaces

3 Flat water based: Exterior, on all surfaces that


receive cement plaster for main building. The
cost includes wall putty (gypsum filling) layer
before painting and all needed preparation of
the surfaces for painting. See schedule for
detail on this paint system
SQ.M 490.00 -
4 Flat water based: Exterior, on all surfaces that
receive cement plaster for guard room. The cost
includes wall putty (gypsum filling) layer before
painting and all needed preparation of the
surfaces for painting. See schedule for detail on
this paint system
SQ.M 95.00 -
Subtotal Finishes -

8. Water Services
8.1 Water Services 8.1 Water services samples, 8.1
Water system piping, 8.1 Sanitary
fixtures, 8.1 Water heater
schedules and 8.1 Water Services
Testing schedules

NOTE: The cost for all pipes exposed to


weather includes glass wool thermal insulation
cover. The cost given for all GI and PVC pipes
with diameter less than 60mm includes all
required fittings, accessories and work for
complete system installation. To be mentioned
that the following section cover water sanitation
needs for main building, septic tank and the
guard room.

Water supply piping

1 GI water supply pipe D=32mm, including fittings


and installation. Lin M 80.00 -
2 GI water supply pipe D=25mm, including fittings
and installation. Lin M 110.00 -
3 GI water supply pipe D=20mm, including fittings
and installation. Lin M 100.00 -
4 GI water supply pipe D=15mm, including fittings
and installation. Lin M 148.00 -
5 Water supply bronze Valve D=32mm, including
fittings and installation. No 2.00 -
6 Water supply bronze Valve D=25mm, including
fittings and installation. No 3.00 -
7 Water supply bronze Valve D=20mm, including
fittings and installation. No 4.00 -

10/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
8 Damp proof Insulation rubber tape for all GI
Piping. Lin M 200.00 -
9 Water supply inspection manhole less than
1200mm deep. This includes excavation and
any needed work to make the manhole as per
drawings and schedule. No 1.00 -
Sanitation Piping

10 PVC pipe D=125mm, including supply and


installation. This also includes supply and
installation of PVC pipe from GI sheet
downpipes to the open channel collector at the
side walks. Lin M 40.00 -
11 PVC pipe D=100mm, including supply and
installation. This also includes supply and
installation of PVC pipe from GI sheet
downpipes to the open channel collector at the
side walks. Lin M 95.00 -
12 PVC pipe D=50mm, including fittings and
installation. Lin M 110.00 -
13 Ventilation PVC pipes D=100mm (from toilets to
roof). This also includes supplying and
installation of PVC screen at the pipe inlets
inside the toilets. See drawing and schedule for
details. Lin M 10.00 -
14 Ventilation PVC pipes D=50mm (from toilets to
roof). This also includes supplying and
installation of PVC screen at the pipe inlets
inside the toilets. See drawing and schedule for
details. Lin M 35.00 -
15 PVC Elbow D=50x50,45, including supply and
installation. No 2.00 -
16 PVC Elbow D=50x50,90, including supply and
installation. No 8.00 -
17 PVC Elbow D=100x100,45, including supply
and installation. No 1.00 -
18 PVC Elbow D=100x100,135, including supply
and installation. No 4.00 -
19 PVC Tee D=100x50x100,45, including supply
and installation. No 4.00 -
20 PVC Tee D=50x100x50,45, including supply
and installation. No 7.00 -
21 PVC Tee D=50x50,45, including supply and
installation. No 5.00 -
22 PVC Tee D=100x100, 45, including supply and
installation. No 2.00 -
23 Sewer Manhole. This includes excavation and
any needed work to make the manhole
according to the drawings and schedules. No 7.00 -
Sanitary and other fixtures

24 Western toilet, including supply, installation and


accessories. No 7.00 -
25 Ceramic sink at toilets and labs, including mixer
and all accessories, supplying and installation.
No 7.00 -
26 Shower, including supply, installation and
accessories. No 1.00 -
27 Floor trap D=50mm, including supply and
installation. No 7.00 -
28 kitchen steel sink, Including supply and
installation. No 2.00 -
29 Ventilation cap D=100mm, including supply and
installation. No 1.00 -
30 Ventilation cap D=50mm, including supply and
installation. No 3.00 -

11/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
31 Service Sink, including supply and installation.
No 2.00 -
32 Electrical water boiler with capacity of 50 Liter,
including supply and installation. No 3.00 -
33 Electrical water boiler with capacity of 30 Liter,
including supply and installation. No 2.00 -
34 PVC Reservoir capacity of 2000 Liter, including
supply and installation. No 1.00 -
35 Grease Trap less than 1200mm deep. This
includes excavation and any needed work to
make the manhole according to the drawings
and schedules. No 2.00 -
Tube well:
Borehole

Drilling well (8") diameter in soil, any type.


Actual well depth will depend the site water
level. Lin M 80.00 -
36 Gravel river type 8-12mm in size.
LS 2.00 -
37 PCC and clay seal to borehole.
LS 2.00 -
38 (6") diameter PVC pipe 7-10mm in thickness.
The actual pipe length will be adjusted
according to the actual well depth in the site.
Lin M 50.00 -
39 (6") diameter PVC filter 7-10mm thickness. See
schedule for slot sizes and other specs. The
actual pipe length will be adjusted according to
the actual well depth in the site.
Lin M 8.00 -
40 Insulation of casing and filter.
LS 2.00 -
41 Gravel pack around casing, filters up to 10m
from surface of ground. LS 2.00 -
42 Clay and cement pack from 10m to surface
level. LS 2.00 -
43 Water wash and Compression test of well.
LS 2.00 -
44 Preparation of hydro geological section, yield of
well, water level, in report LS 2.00 -
45 Chemical and bacteriological analysis tests of
water samples. No 2.00 -
46 Draw down test for well
LS 2.00 -
47 Manhole on top of the well More than 1200mm
deep. This includes excavation and any needed
work to make the manhole according to the
drawings and schedules. No 1.00 -
48 Installation of Italian 'Pedrollo' brand or
equivalent submersible D=40mm water pump
with 40 L\min discharge capacity capable of
153m total head, power capacity=4kw,three
phase. This item includes complete and
functioning pump installation and reinstating of
the place to the satisfaction of UNOPS engineer
if required. This also includes all mechanical
works needed for successful installation. For
electrical accessories required for the pump
installation refer to section 9. Electrical Services
down this document.

No 1.00 -
Subtotal Water Services -

9. Electrical Services

12/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
9.1 Electrical Services 9.1 Electrical systems, 9.1
Electrical supply mains, 9.1
Electrical switchboard design, 9.1
Main 380VAC Distribution System,
9.1 Panel Construction, 9.1 Power
accessories, 9.1 Lighting control
and fittings, 9.1 Fire Detection
Equipment Schedule Schedules
and the Attachments

Note: for all items below the cost includes


complete/installations with all needed
accessories and works. To be mentioned that
the following section cover water sanitation
needs for main building and the guard room.

Power Distribution Main and Sub Boards

1 30KA ISC /0.5Sec, 380Y/220 Volt. 3 Phase, 4


Wire , 50Hz, having grounding bus and surge
arrestors with all accessories. Out door NEMA
enclosure type, Main Power Distribution Panel
Board (MDP) . No. 1.00 -
2 30KA ISC /0.5Sec, 380Y/220 Volt. 3 Phase, 4
Wire , 50Hz, having grounding bus and surge
arrestors with all accessories. In door NEMA
enclosure type, Main Power Distribution Panel
Board (DP1) . No. 1.00 -
3 30KA ISC /0.5Sec, 380Y/220 Volt. 3 Phase, 4
Wire , 50Hz, having grounding bus and surge
arrestors with all accessories. In door NEMA
enclosure type, Main Power Distribution Panel
Board (DP2) . No. 1.00 -
4 30KA ISC /0.5Sec, 380Y/220 Volt. 3 Phase, 4
Wire , 50Hz, having grounding bus and surge
arrestors with all accessories. Out door NEMA
enclosure type, Main Power Distribution Panel
Board (DP3) . No. 1.00 -
5 Main circuit breaker, MCCB, 3x80Amps.
No. 1.00 -
6 Main circuit breaker, MCCB, 3x63Amps.
No. 3.00 -
7 Main circuit breaker, MCCB, 3x40Amps.
No. 1.00 -
8 Main circuit breaker, MCCB, 3x20Amps.
No. 2.00 -
9 Circuit breaker, MCB, 1x32Amps.
No. 3.00 -
10 Circuit breaker, MCB, 1x20Amps.
No. 33.00 -
11 Circuit breaker, MCB, 1x16Amps.
No. 6.00 -
Distribution cabling and wiring

12 1(4Cx16mm) PVC/PVC Insulated Cable, in


50mm PVC electrical conduit.
Note: (conduit is only from hand hole to the
DP1) Lin M 65.00 -
13 1(4Cx10mm + 1x10mm ) PVC/PVC Insulated
Cable, in 50mm PVC electrical conduit.
Lin M 6.00 -
14 1(4Cx6mm ) PVC/PVC Insulated Cable.
Lin M 25.00 -
15 2(1C x 4mm) + 4mm GND wires pulled in PVC
conduit, assorted colors as per phase
requirement RST/UVW, white color is for neutral
and green color for grounding, the duct should
not be filled more than 50%. Lin M 560.00 -

13/16
Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Pos. Description of Work/Items Project Schedules Ref. Unit Quantity Unit Cost Total Cost
16 2(1C x 2.5mm) + 2.5mm GND wires pulled in
PVC conduit, assorted colors as per phase
requirement RST/UVW, white color is for neutral
and green color for grounding, the duct should
not be filled more than 50%. Lin M 260.00 -
Fittings/Fixtures

17 10Amp Single Pole/Double Pole light switch.


No 30.00 -
18 4x18W recessed mounted fluorescent light
fixture. Water proof and normal No 4.00 -
19 2x36W surface mounted fluorescent light
fixture. No 25.00 -
20 1x36W surface mounted fluorescent light
fixture. No 22.00 -
21 1x32W ceiling mounted circular fluorescent light
fixture, Water Proof No 9.00 -
22 1x18W ceiling mounted circular fluorescent light
fixture, Water Proof No 4.00 -
23 1x18W wall mounted mirror light fixture, Water
Proof No 2.00 -
24 1x20W wall mounted rechargeable emergency
light fixture. No 3.00 -
25 1x20W surface mounted rechargeable exit light
fixture. No 3.00 -
26 13Amp Duplex power receptacle.
No 55.00 -
27 16 Amp water proof power receptacle.
No 10.00 -
28 20 Amp water proof power receptacle.
Note: according to the drawings for AC & oven.
No 6.00 -
29 20 Amp non fuse disconnect switch.
No 3.00 -
AC/Split Units and Exhaust fans

30 18000 BTU AC/ Split outdoor, indoor and


remote control units with all accessories,220 V,
50HZ Samsung or equaling
No 1.00 -
31 12000 BTU AC/ Split outdoor, indoor and
remote control units with all accessories,220 V,
50HZ Samsung or equaling
No 2.00 -
32 9000 BTU AC/ Split outdoor, indoor and remote
control units with all accessories,220 V, 50HZ
Samsung or equaling
No 7.00 -
33 50W ,220V, 50Hz exhaust fans .
No 4.00 -
Electrical Grounding.

34 Grounding system according to the grounding


drawing with electrodes, ground ring and
grounding cables. Sets 2.00 -
Labeling

35 Proper and correct all circuits numbering, cable


circuit drawings, cable and switchboard labeling
to the full satisfaction of UNOPS engineer.
LS 1.00 -
Subtotal Electrical Services -

14/16
UNOPS
Vertical Structures Unit

SUMMARY ESTIMATE

Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Work Type
Total for General 0.00
Total for Site 0.00
Total for Structure 0.00
Total for Enclosure 0.00
Total for Interior 0.00
Total for Finish 0.00
Total for Water Supply Services 0.00
Total for Electrical Services 0.00

Total for 2-Story Administration Building and a Guardhouse 0.00

Estimate Value for whole tender in words:


#VALUE!
UNOPS
Vertical Structures Unit

SUMMARY ESTIMATE

Currency: US Dollars

Project No: 1017


Project Title: ANDMA Building in Heart
Location: Herat, Afghanistan

Tender No: 01
Component: 2-Story Administration Building and a Guardhouse
Original Issue: November 07, 2010

Work Type
Total for General 0.00
Total for Site 0.00
Total for Structure 0.00
Total for Enclosure 0.00
Total for Interior 0.00
Total for Finish 0.00
Total for Water Supply Services 0.00
Total for Electrical Services 0.00

Total for 2-Story Administration Building and a Guardhouse 0.00

Estimate Value for whole tender in words:


#VALUE!

Agreed on behalf of Contractor UNOPS


Name Name

Position Position

Signature Signature

Address and
Mobile Number

You might also like