You are on page 1of 1

439.

00
41.15 4.75 270.15 76.37 45.00
22.00 14.40 55.25 72.00 16.23 37.10 19.43 74.83 17.55 50.40 8.43
CHILLER BUILDING AND COOLING TOWER
8.30

TIG
VIE 113
CHILLER WATER RETURN TANK
105 CU.M

PARKING AREA

meter meter

26.00
22.00

CANTEEN
17.50

Pipe rack
Canopy Line Opening for machine entrance
DOOR 1.70 m.(min.)(W.) Opening for machine entrance DOOR 1.70 m.(min.)(W.)

S
UP.

72.00
24.40
BUILDING A POWER PLANT
FIRE DOOR EXIT
m.(min.)(W.)
1.70 MDB

FREEZE ROOM
61.10

PARKING AREA
KnockDown TRANFORMER

23.80
BUILDING E
3000 2000 2000
KVA KVA KVA

TOILET

Opening for machine entrance


GAS STATION
144.00

144.00
HEAVY OIL STORAGE
100.50

Signs
BUILDING B
Quick Door ANTE ROOM

BUILDING C
ROLLING DOOR
12.00

Quick Door Quick Door


BUILDING D
GUARD HOUSE ROLLING DOOR
ROLLING DOOR
WASTE WATER TREATMENT

72.00
FLAGPOLE HOID
ROLLING DOOR For Export Loading WATER SUPPLY PLANT
27.40

FIRE DOOR EXIT ROLLING DOOR For Export Loading


m.(min.)(W.)
1.70
CHILL ROOM

POND
DN.

Roof Line
8.50 9.20

FIRE DOOR EXIT


1.70 m.(min.)(W.) Roof Line
FIRE DOOR EXIT
1.70 m.(min.)(W.)
Opening for machine entrance
SERAPS SORT
01 SEE DETAIL

EYE WASH
SUTTER DOOR

STORAGE ROOM
CHEMICAL STORAGE DOOR NET
TOILET

You might also like