LOCATION
• Cochin is the Queen of the Arabian Sea by virtue of its strategic location.
• It is just 11 nautical miles off the international shipping route connecting Europe
and the Pacific Rim.
• It is the nearest Indian port to this maritime highway.
• Which is why Dubai Ports International is investing in Cochin to make it a
transshipment container terminal.
• No red tape.
Floor
Ceiling Height Column Grids in
Level Loading in
in Meter Meter
KN/M2
Lower Ground Floor and Ground Floor 5.0 4.5 11.50 *10.60
Other Floors-1 st to 7th Floor 5.0 4.0 11.50 *10.60
Page 1 of 6
Technopolis-Brief Specifications
1. External Finishes
3. Floor Finishes
Location Flooring
Entrance Lobbies 20mm thick polished Granite
Office Areas, Shops, Restaurant, Kitchen,
IPS with power float finish
Business Centre and Exhibition area
First floor corridor, Toilets, Restrooms and
300X300 anti skid ceramic tiles
Lift lobbies
Lower ground and ground floor i.e. in
80mm thick VDF
parking
Auxiliary staircase Polished Granite
Main Staircases Cement tiles laid to pattern
Chequered finish with grano camber and
Open terrace 1st floor
crystalline water proofing
AHU and Electrical and BMS IPS with power float finish
Ramps Heavy duty interlocking pavers
5. Ceiling Finishes
Location Material
Office, Shops, Restaurant, Kitchen, Business
Plastered and paint finish
Centre and Exhibition area
Main lobby and Lift lobby Gypsum board designer ceiling
600X600 tile ceiling with gyp board
Toilets and first floor corridor
border
6. Wall Finishes
Location Material
Office, Shops, Restaurant, Kitchen, Business
Plastered and OBD paint finish
Centre and Exhibition area
Main lobby 20mm thick polished granite
300X300 vitrified tiles with granite
Lift lobby bands upto 1350mm and above is
textured paint finish
Toilets 200X300 mm Glazed tile Dado
First floor corridor 300X300mm Vitrified tiles
B. Services
• This controls the switching operation of ACMV systems as per the desired
sequence and timing.
• This ensures effective control and monitoring of the ACMV system, Fire
Protection System, Electrical system, Lighting system Lifts and Exhaust fans
etc.,
• Central monitoring of technical parameters of all plant equipments,
switchgears, AHUs and pumps is possible thereby improving the reliability of
quality service.
• This also measures all refrigeration and power consumption units.
• BMS is powered from an UPS for higher availability, reliability and
prevention of data loss.
• These systems shall comprise of Direct Digital Control (DDC) connected to
Man Machine Interface (MMI).
• The rates are cheaper within Technopolis as the National Domestic Long
distance charges are not applicable.
• The cabling will be done up to the common floor levels for easy and faster
connectivity.
• An EPABX is proposed in order to provide intercom services within the Park.
• Power supply to the park is through 2 reliable feeders from 110KV Sub Station of Kerala
Electricity board. One supply source is from Bhramapuram Within Special economic
Zone there are 2 Nos. of 12.5MVA transformers to take care of the power supply
requirements.
• Technopolis receives 11KV Power supply from CSEZ and stepped down to 415 V
through transformers of capacity 2 X1250 KVA each and distributed within Technopolis.
• Further back up is provided by additional feeders thro’ ring main unit from Kerala
Electricity Board
• Back-up power supply will be provided from D.G sets of capacity 2500 KVA with Auto
Main Failure feature.
• UPS support is provided for fire protection system, General Lighting, Emergency
lighting in tenant and common areas, AC for office, Mechanical Ventilation system,
Lifts, Sump pump, BMS, Water pumps.
• All tenants will be metered for 415 V normal power supply through sub boards
located at each floor.
Page 3 of 6
Technopolis-Brief Specifications
• The current power tariff for the LT connection to Tenants in Technopolis has two
components, viz., a fixed connected load charge of Rs.45/- KW and energy
consumption charge of Rs.3.25/- unit. An electricity duty of 8.2 % and an electricity
surcharge of 2.2 % on the electricity consumption charges. However the prevailing LT
tariff shall be applicable to the clients
B.5 Earthing
• A dedicated earthing system has been provided for to cater to the tenants’ UPS,
Server room and communication equipments. This is in addition to the normal grid
earthing provided for other electrical systems.
Normal Emergency
Common Areas, Staircases, Lift lobby, exits
Tenant Area and AHU rooms
and all other places with 10 % fixtures.
• Common area lighting will be provided with 1X11w CFL lamps, whereas M&E rooms
are provided with 1X40w fluorescent (recess mounted or ceiling mounted).
• The systems provided are as per the norms of National Building Code (NBC)
of India.
• 4 nos. of wet riser system with hose reels at all floor levels.
• Yard hydrants around the building at every 30 meters of interval with a
stand post.
• Each stand post contains 2 nos. of 63mm dia hoses and branch pipes.
• Sprinkler Risers at 2 symmetric locations for sprinkler system.
• There is an under ground water storage tank of capacity 250 Cu.m
exclusively for fire fighting purpose.
• A suitable type of portable fire extinguishers
• Smoke detector in electrical room, ducts, lift shaft, lift machine room etc.,
• Fire escape route sign boards
• MIMIC panel shall be located in the smoke free lobby at each floor level.
B.8 Lifts
• The dimensions of lift car and the door are as tabulated below:
Page 4 of 6
Technopolis-Brief Specifications
Passenger Lift 2400 2500 2.1 1100 2100
156 covered Car Parking lots in the Lower and Ground floor level.
• 51 open Car Park lots in the surface level.
• Additional open car parking is possible on request
• Space for 2-wheeler parking
Page 5 of 6
Technopolis-Brief Specifications
C-1 Commercials
To be discussed separately.