Professional Documents
Culture Documents
Space Summer Winter Room Fresh Air People Lighting Miscellaneous Noise Check
Temp. Requirement Density Load Load Criteria Figures
Rm.Temp Room RH
(C db) (l/s/person) (m2/person) (W/m2) (W/m2) (NC) (ft2/TR)
(C db) (%)
Office (general) 24 50-55 22 8 9(perimeter zone) 20-40 25 35-40 200-250
6(interior zone)
Office 24 50-55 22 8 9(perimeter zone) 25-40 50-70 35-40 150-200
(hi-tech) 6(interior zone)
Conference room 24 55 22 10 2 20-40 25 30-35 180-200
Chinese Restaurant 22 60 20 10 1 90 10 sensible/person 45 80-100
10 latent/person
(for meal)
Western Restaurant 22 60 20 10 1.5 54 10 sensible/person 40-45 80-100
10 latent/person
(for meal)
Coffee shop/ 24 60 22 15 1.5 54 10 35-40 100-120
Bar/Lounge
(not for meals)
Canteen/ 22 60 20 10 1 45 10 sensible/person 45 80-100
Food Plaza 10 latent/person
(for meal)
Banquet room 22 60 20 10 1 80 10 sensible/person 35-40 80-100
10 latent/person
(for meal)
Kitchen Thro spot --- --- Thro kitchen --- --- --- --- ---
cooling (no heating) ventilation
Retail shop 24 55 22 8 2.5 40-80 40 40 130-150
Supermarket 24 55-60 22 8 12.5 20-40 5-10 40 200
Shopping arcade 24 55 22 8 2.5 45 25-40 40-45 130-150
Toilet/Changing room 26 --- 20 Thro toilet --- 15-40 --- 40-45 300
(with A/C) (or no heating) ventilation
Cinemas 24 55 22 8 1 (or number of --- --- 30 13
seat) persons/TR
Store room (with A/C) 24-26 55 --- 8 20 15-40 --- 45 250-300
(no heating)
Computer room 20 50 20 8 6-10 15-40 450-750 35-40 60-80
(PCs/terminals mainly)
Computer room 20 50 20 8 10-15 15-40 500-900 35-40 60-80
(mainframe only)
Space Summer Winter Room Fresh Air People Lighting Miscellaneous Noise Check
Temp. Requirement Density Load Load Criteria Figures
Rm.Temp Room RH
(C db) (l/s/person) (m2/person) (W/m2) (W/m2) (NC) (ft2/TR)
(C db) (%)
Hotel guest room 24 55 22 30l/s per room 2 people per room 500W per 900W per room 30 250-350
(or designed room
accommodation
capacity)
Corridor 24-26 55-60 20-22 0.25 l/s/m2 --- --- --- 35 for hotel 300-400
40 for office
Main entrance/ Large 24-26 55-60 20-22 1 l/s/m2 --- --- --- 40 300
lobby
Lift lobby 24-26 55-60 20-22 1 l/s/m2 --- --- --- 40 300
Health club 24 60 22 13 8-10 8-10 --- 40-45 100-120
Multi-function room 24 55 22 8.3 1.5 1.5 40 30 80-120
Back-of-house area 24-26 55-60 --- 8 4 4 20 40-45 200-250
(no heating)
Disco/Dancing 22 55 20 13 1 1 40 45 70
hall/Ballroom
Karaoke room 24 55 22 10 1.5 1.5 40 40-45 150-200
Bank hall 24 55 22 8 1.5 1.5 10 35-40 160-180
Bank vault 24 55 22 Min. 2 airchange --- --- --- 30-35 250
Hospital ward room 24 55 22 8 8-10 8-10 20 30 200
Hospital operating 20-24 50-60 20-24 All OA (i.e 4-6 4-6 40-60 30 40
theatre(100% OA) quantity of OA =
SA)
Hospital consultation 24 55 22 8 4.5 4.5 10 30-35 200
room
Clinic 24 55 22 8 1.5 1.5 10 30-35 180-200
Pantry 26 60 20 --- --- --- 40 40-45 250-300
Refuse room (with 18 --- --- --- --- --- --- 45 200-250
AC) (no heating)
Plant room (central or 26-28 --- --- min. 2 airchange --- --- Refer to heat 50 200-300
large one with AC) (no heating) (for operators dissipation of the
always there) plants