Professional Documents
Culture Documents
Industry Classification:
PROJECT PROFILE
Project Type: Greenfield Diversification Others (specify)
Expansion Modernisation
Indicate the section-wise capacities for the major sections of the plant along with detailed calculations.
Explain the reasons for excess / inadequate capacity, if any, in any of the sections.
Age:
Educational Qualifications:
1 Sales
Net Profit
Networth
2 Sales
Net Profit
Networth
3 Sales
Net Profit
Networth
I-2 Provide a brief write-up on the activities and past performance of the company
(only required if promoter is a limited company)
Activities
Performance 19__ 19__ 19__ 19__ 19__
Sales
Gross Profit
Operating Profit
Net Profit
Share Capital
Networth
I-3 Describe any other expansion programme(s) contemplated (only required if promoter is a limited
company)
B. COMPANY BACKGROUND (only required if applicant is an existing
company)
I-4 Provide a brief history of the concern including any changes in names, business
management, etc. and indicate any mergers or reorganisations which took place
I-7 Is the company regular in crediting its contribution and the contribution of its employees to the
Employees' Provident Fund's and meeting other statutory obligations?
Yes No
I-8 Describe manufacturing facilities separately at each plant as follows:
Plant Dates of Major Plant & Equipment Specification of Products
Installation and Design Normal Manufactured
Major Remodeling Capacity Capacity
I-10 Provide reasons for under-utilisation of capacity and significant variations in productions and sales
I-12 Indicate the existing requirement of raw materials, utilities and services
Raw Materials, Utilities Arrangements for Supply
and Services
I-17 Describe any assets that may have been revalued or written off at any time during the existence of the
company
Revalued or Written-off Assets Reasons
I-20 Provide the following particulars for all existing debentures: (use additional sheets of paper if
necessary)
#1 #2 #3
Date of Debenture Trust Deed
Purpose for which Debenture was
Raised
Security Charged and Nature of
Charge
Trustees for Debenture Holders
Original Amount of Issue
Amount Outstanding
Rate of Interest
Amortisation Schedule
Restrictive Covenants
I-21 Provide the following particulars for all existing long term secured loans:
(use additional sheets of paper if necessary)
#1 #2 #3
Name of Institution Granting Loan
Original Amount
Amount Outstanding
Rate of Interest
Amortisation Schedule
I-22 Provide the following particulars for existing cash credit / overdraft agreements:
(use additional sheets of paper if necessary)
#1 #2 #3
Name of Bank
Nature of Facility
Maximum Limit
C. MANAGEMENT STRUCTURE
I-23 Provide the following detail for each member of the Board of Directors:
(Use additional sheets of paper if necessary)
1) Director's Age:
Name:
Address:
Existing Shareholding: %
Proposed Shareholding:
%
Educational
Qualifications:
Relevant Industry
Expertise:
2) Director's Age:
Name:
Address:
Existing Shareholding: %
Proposed Shareholding:
%
Educational
Qualifications:
Relevant Industry
Expertise:
3) Director's Age:
Name:
Address:
Existing Shareholding: %
Proposed Shareholding:
%
Educational
Qualifications:
Relevant Industry
Expertise:
4) Director's Age:
Name:
Address:
Existing Shareholding: %
Proposed Shareholding:
%
Educational
Qualifications:
Relevant Industry
Expertise:
C. SHAREHOLDING PATTERN
I-28 Provide a list of shareholders owning or controlling 5% or more of equity shares
Shareholder Name Amount Owned Business Relationship
I-30 Provide detail on the distribution of shareholdings (only required for existing companies)
Equity Preference
Indian Promoters:
1)
2)
3)
4)
5)
Foreign Collaborators
Central Government
State Government
State Industrial Development Corporation
Financial Institutions:
IDBI
IFCI
ICICI
LIC
UTI
GIC
Banks
Others, (please specify)
Public
I-31 In respect of shares issued for consideration other than for cash, furnish the
following particulars:
Name of the Party No. of Value of Date of Issue Consideration for which
Shares Shares Issued Issued
Issued
PART II - TECHNICAL INFORMATION
A. TECHNICAL ARRANGEMENTS
II-1 Explain the technical process proposed to be employed, including reasons for
adopting this particular process
II-2 Has the proposed process ever been tried in this country? If yes, what were the results? Please indicate
performance of concerns adopting similar technology.
Describe other projects in India and abroad set up with same collaboration
II-7 Provide the following particulars for main plant that was imported/ to be imported
for the project (Please furnish similar details for each equipment separately in annex) :
Description with Broad Specifications:
Name of Manufacturer:
Country of Origin:
Basis of selection of equipment
Source(s) of supply
Has the machinery already been imported? Yes No
If no, has the order been placed? Yes No
If yes, what is the order placement date? / /
What is the expected delivery date? / /
Port of Landing:
FOB Value
Basis of Valuation
Insurance & Freight: Rs. Import Duty: %
II-8 Provide the following particulars for main plant that was acquired/ to be acquired
indigenouly (Please furnish similar details for each equipment separately in annex):
Description with Broad Specifications:
Name of Manufacturer:
Basis of selection of equipment
Source(s) of supply
Has the machinery already been imported? Yes No
If no, has the order been placed? Yes No
If yes, what is the order placement date? / /
What is the expected delivery date? / /
Ex works FOR price
Basis of Valuation
II-10 Give the following particulars in respect of the land acquired / proposed to be acquired for the project:
Describe the extent of land and its cost:
Give particulars
Are there any restrictions under local laws against the Yes No
land being used for non-agricultural / industrial
purposes?
If yes, has requisite permission for non-agricultural Yes No
use been obtained?
Is the land free from encumbrances? Yes No
If no, provide details
II-11 Explain the arrangements made / proposed for constructing each building as follows (please furnish
details for other civil works in the following format separately):
Description of the Building:
Type of Construction:
No of Floors: Length: Breadth:
Avg Floor Ht Total Floor Area: Rate per sq. m.
Estimated Cost:
Name of Contractor:
Contract Date: / / Contract Amount:
Remarks (Indicate the reasons for higher/ lower construction costs such as heavy foundation, special
construction, etc.)
C. INPUTS OF PRODUCTION
II-12 Describe indigenous raw material requirements
Name of Material / Specification Reqmt per Total Annual Unit Cost Basis of Cost
Chemical tonne of Reqmnt Estimate
Component Final Prod.
II-16 Indicate the arrangements made / proposed for obtaining raw materials
which are in short order or to be imported
Particulars of Minerals:
II-18 Describe the requirements and availability of labour, as well as training and development programmes
Total Require- Availability Training Programmes Manpower
ments Development
Programmes
Skilled
Semi-skilled
Unskilled
II-19 Furnish existing and proposed arrangements for housing the staff and workers
Senior Other Supervisors Labour
Executives Executives
No. of Quarters (existing)
No. of Quarters (proposed)
Floor Area (Existing)
Floor Area (Proposed)
Unit Cost (Existing)
Unit Cost (Proposed)
Amount Proposed to be met
from Industrial Housing Scheme
Maximum Demand:
Connected:
Contracted Load:
Power Tariff:
Provide Calculations
Describe the use of solar energy for low temperature heating requirements and whether siting /orientation of the
hotel building has been made to optimise the use of solar energy for the following:
Indicate the efforts proposed for generally cutting down losses in the use of various utility services, namely
power, water and steam and maximum and efficient utilisation of waste heat
Indicate any other measures considered necessary or proposed to be taken in the context of energy conservation
Give particulars of the monitoring system to acquire the desired economy in use of energy
Indicate the savings achieved / proposed to be achieved by utilising alternative sources of energy
Capacities of Tanks:
Capacities of Reservoirs
Type of Boiler:
Capacity:
If alternate processes are available, provide comparative energy consumption figures for the various processes
If the project is energy intensive, discuss the possibility of choosing alternative processes in order to make the
project less energy intensive
Describe the steps proposed to be taken by the company to improve energy efficiency and reduce energy losses
(such as power factor improvement, power load management, optimising illumination, waste heat utilisation, etc.)
Describe the scope for usage of solar / other renewable sources of energy
Describe any other measures contemplated in the direction of energy conservation and management
II-24 Furnish the following details regarding compressed air and fuel requirements
Requirement Sources Arrangements Cost at Site Detailed Cost
Proposed Calculations
II-25 Describe the arrangements proposed for carrying raw materials and finished
goods, provisions for own trucks, railway siding etc. and arrangements with private truck operators
D. IMPLEMENTATION SCHEDULE
II-26 Complete the following implementation schedule:
Commencement Date Completion Date
Acquisition of Land
Development of Land
Civil Works
Factory Building
Machinery Foundation
Auxiliary Building
Administrative Building
Miscellaneous Buildings
Arrangements for Power
Arrangements for Water
Erection of Equipment
Commissioning
Procurement of Raw Materials and Chemicals
Training of Personnel
Trial Runs
Commercial Production
III-2 Provide estimates of historic demand for each of the products proposed
to be manufactured (please mention source of information)
Product Year -5 Year -4 Year -3 Year -2 Year -1
III-3 Provide information regarding export possibilities and the nature of competition
to be faced in foreign countries
III-4 Give comparative data on the manufacturing costs and prices prevailing in selected competing countries
(domestic as well as export)
III-5 If there are any export commitments assumed by the company as part of the Government requirements,
indicate the arrangements proposed for meeting the same and the export incentives available
B. SUPPLY OUTLOOK
III-6 Provide estimates of historic supply of each of the products proposed to be manufactured
Product Year -5 Year -4 Year -3 Year -2 Year -1
III-7 Give an assessment of likely competition in the future and indicate any special features of the project
which may enable it to meet the competition
III-8 Specify the particulars of Government controls and restrictions, if any, on the sale price, distribution,
import, export of each of the products proposed to be manufactured
Proposed Products Government Controls and Restrictions
C. MARKET POTENTIAL
III-9 Provide estimates of the projected demand for each of the products proposed to be manufactured
Product Year -5 Year -4 Year -3 Year -2 Year -1
III-10 Provide estimates of the projected supply of each of the products proposed to be manufactured
Product Year -5 Year -4 Year -3 Year -2 Year -1
III-12 Give details regarding the trend in prices during the last five years. If the prices are controlled by the
Government or on a voluntary basis, indicate the basis on which the prices were fixed
D SELLING ARRANGEMENTS
III-13 List principle customers and particulars of any firm arrangements entered into with them
Principle Customers Particulars of Firm Arrangements
III-14 If sales are to be made directly by the company, provide information on the nature of the proposed selling
organisation for each product
Proposed Product Nature of Proposed Selling Organisation
III-15 If sales are to be made through distributors or selling agents, please provide the following particulars on
the selling arrangements
Proposed Product Proposed Selling Proposed Description of Selling
Arrangements in India and Commission Agent's Organisation
Abroad
III-16 If sales are to be made through any sole selling agents, please provide a description of remuneration,
reasons for appointment, relationship of directors with selling agent, the agent's past experience and the
adequacy of storage facilities for each sole selling agent
FINANCIAL INFORMATION
A. PROJECT COST
IV-1 Provide the following breakdown of project cost:
Rupee Cost Rupee Equivalent of
FE Cost
Land and Site Development
Buildings
Plant & Machinery
Imported
Indigenous
Technical Know-How Fees *
Expenses on Foreign Technicians and Training of Indian
Technicians Abroad *
Miscellaneous Fixed Assets *
Preliminary and Preoperative Expenses *
Provision for Contingencies *
Margin Money for Working Capital *
Total
B. MEANS OF FINANCING
IV-2 Provide a breakdown of the proposed means of financing:
Rupee Cost Rupee Equivalent of
FE Cost
Promoters' Capital
Public issue of Capital
Rupee Loan
Debentures
Foreign Currency Loan
IV-3 Provide details on proposals for raising share capital, loans and debentures:
Subscription / Loans
Underwriting of
Share Capital
Equity Pref. Rupee Foreign. Debenture Remarks
Curr.
Indian Promoters
In cash
For consideration
other than cash
Foreign Collaborator
State Government
SIDC
IDBI
IFCI
ICICI
LIC
UTI
Banks
(Specify)
Insurance Co.s
(Specify)
Brokers
IV-4 Briefly describe the arrangements so far made for raising the finance and proposed arrangements
IV-5 List the particulars of foreign currency loans / guarantees applied for
Rate of Exchange Rupee Equiv. at
Currency Parity Market Parity Market
Rate Rate Rate Rate
Loan
IV-6 Indicate sources of foreign exchange and arrangements, if any, made from obtaining foreign exchange
IV-7 Indicate sources from which expenditures already incurred have been financed
Amount Rate of Other Terms and
(Rs.000) Interest Conditions
Payable
Share Capital
Equity
Preference
Long / Medium Term Loans from
Banks
IV-9 List the persons / firms who would be contributing to the promoters' share of the capital
IV-14 Provide estimates of production and sales for the first five years of operation (if more than one product,
prepare each response for each product separately)
Year +1 Year +2 Year +3 Year +4 Year +5
Installed Capacity
No of Working Days
No. of Shifts
Value of Sales
IV-15 Give estimates of working results for the first five years of operation
Year +1 Year +2 Year +3 Year +4 Year +5
Cost of Production - from Question
IV-12 (a)
Administrative Expenses
Admn Salaries
Remun to Directors
Professional Fees
Office Supplies
Insurance & Taxes
Miscellaneous
Total Adm.expenses(b)
Total Sales Expenses(c)
Royalty/Know How (d)
Total Cost of Production
(e)=(a)+(b)+(c)+(d)
Expected Sales - from Question IV-
13 (f)
Gross Profit Before Int. (g)=(f)-(e)
Financial Expenses
Interest on TL
Interest on WCL
Guarantee Comm.
Total Fncl Expense (h)
Depreciation (i)
Operating Profit (j)=(g)+(h)+(i)
Other Income, if any (k)
Prelim Exp Written off (l)
Profit / Loss Before Tax (m)=(j)+(k)+
(l)
Provision for Taxation (n)
Profit after Taxation (m)-(n)
IV-16 Give estimates of profitability for the project (only required for expansion / diversification of
existing companies)
Year +1 Year +2 Year +3 Year +4 Year +5
Cost of Production - from Question
IV-12 (a)
Administrative Expenses
Admn Salaries
Remun to Directors
Professional Fees
Office Supplies
Insurance & Taxes
Miscellaneous
Total Admin Expenses (b)
Total Sales Expenses (c)
Royalty/ Know How (d)
Total Cost of Production
(e)=(a)+(b)+(c)+(d)
Expected Sales - from Question IV-
13 (f)
Gross Profit Before Int. (g)=(f)-(e)
Financial Expenses
Interest on TL
Interest on WCL
Guarantee commission
IV-17 Provide a cash flow statement for the company as a whole for the first five years of operation
Year +1 Year +2 Year +3 Year +4 Year +5
Sources of Funds
Share Issue
Total Dispositions
Opening Balance of Cash in Hand
and at Bank
Net Surplus / Deficit
Closing Balance of Cash in Hand
and at Bank
IV-18 Provide a projected balance sheet for ten operating years for the company as a whole
IV-19 At what capacity will the plant break-even? Provide detailed calculations
V-2 Provide detailed explanations for differences in selling prices of the products and those of imported
goods with quantitative data on differences in cost of production (such as scale of operation, differences in costs
of inputs and various local duties and taxes)
V-3 Provide prices of inputs which can be imported or exported
Inputs International CIF FOB
Export Duty
Export Assistance
Replenishment Loan
Duty Drawback
Cash Subsidy
Other
V-5 Provide a brief write-up on the economic benefits to the country in general
and the region in particular, on account of the proposed project
V-6 How far does the unit contribute to the establishment of ancillary industries
in the region?
B. SOCIAL CONSIDERATIONS
V-7 In case of agro-based / agriculture input industries, indicate in detail the company's scheme for educating
the farmers to use the product / to grow the produce required
C. ENVIRONMENTAL CONSIDERATIONS
V-8 Furnish details on the nature of the atmospheric, soil and water pollution likely to be created by the
project
Nature of Pollution Measures Proposed for Control of Pollution Necessary
permission for
Disposal of
Effluents Obtained?
Atmospheric
Soil
Water
V-10 Specify any special conditions attached to the licenses / consents and the undertakings given by the
company in connection with them