Time of Concentration tc = to + td
tc = 7.41 min
Cs = 0.799
C= 0.75 for bare earth
i2 = 5.2 in/hr
A= 23.5 acres
='> Peak Discharge Q2 = Cs. C. i2. A
Q2 = 73.266 cusecs
Regular maintenance works on the temporary silt trap shall be carried out, involving the followings: -
a) Repair all damages cause by soil erosion or construction equipment at or before end of each working day
b) Sediment shall be removed from the basin and deposited in a suitable area when it reaches the clean out
level
c) Keep trash track and anti-vortex device clear of debris
Q2 = 73.266 cusecs
Qp = 7.990 cusecs
Qes = 73.266 - 7.990
Qes = 65.276 cusecs
To check - the available head, H for the pipe spillway does not control the size.
H= 4.59 ft
Inlet pipe, D = 15 inches f
Inlet pipe discharge capacity = 12.660 cusecs > Qp
Principal Spillway Discharge, Qp = 7.990 cusecs
Top of Riser is h feet (>1') below the crest level of emergency spillway.
The temporary earthdrain to be provided to channel the surface run-off into the excavated basement. The
basement will act as a temporary silt trap. Water will be sumped into the temporary silt trap and finally
discharged into the existing external roadside drain
Regular maintenance works on the temporary silt trap shall be carried out, involving the followings: -
a) Repair all damages cause by soil erosion or construction equipment at or before end of each working day
b) Sediment shall be removed from the basin and deposited in a suitable area when it reaches the clean out
level
c) Keep trash track and anti-vortex device clear of debris
Q2 = 5.996 cusecs
Qp = 0.707 cusecs
Qes = 5.996 - 0.707
Qes = 5.289 cusecs
To check - the available head, H for the pipe spillway does not control the size.
H= 2.95 ft
Inlet pipe, D = 12 inches f
Inlet pipe discharge capacity = 6.420 cusecs > Qp
Principal Spillway Discharge, Qp = 0.707 cusecs
Top of Riser is h feet (>1') below the crest level of emergency spillway.