Professional Documents
Culture Documents
Metrado
01 OBRAS PRELIMINARES
02.06.01 TAPA CMARA VLVULAS 0.4x0.4x1/8" CON LLAVE TIPO BUJIA GLB 1.00
02.06.02 TAPA CMARA HMEDA 0.6x0.6x1/8" GLB 1.00
400.00 1,600.00
863.15 863.15
3,500.00 3,500.00
14,598.15 14,598.15
5,833.26
1,855.06
4.03 51.38
3.71 47.30
1,756.38 1,756.38
81.67
39.45 62.73
39.45 18.94
48.27
279.08 44.65
362.42 3.62
1,660.40
502.97 809.78
4.82 342.32
46.17 398.45
305.15 109.85
232.88
29.60 55.94
26.02 176.94
356.78
135.87 135.87
205.87 205.87
14.46 15.04
437.55
437.55 437.55
200.16
253.37 200.16
851.96
56.05 851.96
108.53
217.06 108.53
142,532.83
30,055.08
1.77 7,177.35
3.16 12,813.80
10,063.93 10,063.93
62,974.97
4.50 16,198.43
31.82 14,489.24
1.98 7,127.31
3.96 1,803.19
2.79 11,313.45
2.97 12,043.35
28,385.00
7.00 28,385.00
1,876.58
34.43 206.58
28.40 1,050.80
25.80 619.20
7,380.10
1.82 7,380.10
Item Descripcin Und. Metrado
03.06 CAMARA ROMPE PRESION
04.10.07 OTROS
69.66
4.03 36.27
3.71 33.39
177.53
39.45 177.53
149.18
331.50 149.18
5,708.69
367.98 1,258.49
46.17 2,493.18
4.82 1,957.02
1,459.87
29.60 735.26
25.16 724.61
1,465.83
162.87 1,465.83
1,946.53
205.87 1,852.83
14.46 93.70
395.42
13.73 395.42
488.39
217.06 488.39
15,057.84
148.05
4.03 100.75
3.71 47.30
965.78
40.22 63.95
6.03 127.59
40.22 774.24
841.09
315.93 669.77
372.43 171.32
2,147.84
502.97 809.78
55.17 476.12
4.82 342.32
30.93 519.62
4,597.26
29.60 1,870.72
26.02 1,846.38
55.01 880.16
211.08
205.87 205.87
14.46 5.21
1,568.66
1,568.66 1,568.66
19.41
3.92 1.96
17.45 17.45
790.85
13.73 790.85
3,767.82
6.27
3.71 6.27
41.37
39.45 16.57
6.03 5.07
39.45 19.73
8.60
62.23 4.98
362.42 3.62
1,550.55
502.97 809.78
46.17 398.45
4.82 342.32
134.78
26.02 134.78
1,820.38
522.80 522.80
365.70 365.70
30.48 30.48
450.70 901.40
205.87
205.87 205.87
Item Descripcin Und. Metrado
04.10.02 MOVIMIENTO DE TIERRAS
39.45 16.57
6.03 5.07
39.45 19.73
8.60
62.23 4.98
362.42 3.62
1,550.55
502.97 809.78
46.17 398.45
4.82 342.32
134.78
26.02 134.78
1,820.38
522.80 522.80
365.70 365.70
30.48 30.48
450.70 901.40
205.87
205.87 205.87
11,564.97
1,563.33
4.03 813.98
3.71 749.35
5,887.86
17.53 3,540.71
1.69 341.35
2.79 563.52
29.75 1,442.28
PROPIO
05.03 TUBERIAS 3,461.94
05.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC C-7.5 NTP ISO 1452 DN m
75MM
201.98 17.14 3,461.94
3,461.94
05.04 SUMINISTRO E INSTALACION DE ACCESORIOS
06.03.01 SUMINISTRO E INST. TUBERIA PVC C-7.5 NTP ISO 1452 DN 75MM m
06.03.02 SUMINISTRO E INST. TUBERIA PVC C-7.5 NTP ISO 1452 DN 63MM m
06.03.03 SUMINISTRO E INST. TUBERIA PVC C-7.5 NTP ISO 1452 DN 50MM m
06.03.04 SUMINISTRO E INST. TUBERIA PVC C-7.5 NTP ISO 1452 DN 25MM m
06.04 SUMINISTRO E INSTALACION DE ACCESORIOS
12,947.75
32.95 724.90
30.35 121.40
32.45 97.35
29.75 178.50
27.55 55.10
22.09 22.09
52.05 780.75
41.05 574.70
35.10 70.20
32.95 65.90
24.69 197.52
22.29 22.29
1,874.13
46.17 1,121.93
300.88 752.20
14,571.27
123.84
4.03 64.48
3.71 59.36
2,017.48
39.45 502.99
39.45 1,514.49
5,071.80
367.98 1,839.90
46.17 3,231.90
503.20
25.16 503.20
6,600.85
785.02 1,570.04
675.52 3,377.60
551.07 1,653.21
207.83
207.83 207.83
46.27
14.46 46.27
7,587.54
89.35
4.03 48.84
3.71 40.51
555.06
39.45 258.79
39.45 108.88
39.45 187.39
1,486.45
279.08 1,462.38
300.88 24.07
2,196.99
429.37 686.99
46.17 982.50
4.82 527.50
289.84
25.16 289.84
2,019.40
504.85 2,019.40
831.32
207.83 831.32
Item Descripcin Und. Metrado
06.07.08 PINTURA
06.08.08 CONEXXION AGUA 1/2" HASTA 4.00 M INC. LOSA 1X1 und 187.00
06.09 PRUEBAHIDRULICA
COSTO DIRECTO
SUBTOTAL
IGV (18%)
TOTAL PRESUPUESTO
Precio S/. Parcial S/.
18.51
14.46 18.51
100.62
127.37 100.62
89,294.41
4.03 1,959.39
3.49 274.10
12.05 10,365.41
1.69 1,264.12
2.64 1,974.72
39.62 5,334.44
39.45 4,426.29
340.62 63,695.94
4,437.83
1.82 4,437.83
429,896.20
34,391.70
30,092.73
494,380.63
88,988.51
583,369.14