Professional Documents
Culture Documents
3 Installation Electrica
3.1 Mounting system of solar panel lattitute angle
3.1.1 Stand
3.1.2 Nuts
3.1.3 Bolts
3.1.4 Clamp
3.2 Electrical system
3.2.1 Micro invertor
3.2.2 Electrical Battery
3.2.3 Charge controller
3.2.4 Voltmeter
3.2.5 Ammeter
3.2.6 Pyrometer
4 Inspection Quality D
4.1 Physical Inspection unskilled technician
4.1.1 Solar Panel Design Inspection
4.1.2 Angle of mounting Stand
4.2 Technical Inspection
4.2.1 Circuit Inspection
Design Department
Quality Department
Quality Department
OBJECTIVES: 1. To install a solar
2. To use of renewable energy to pr
1 Site selection 2
1.1.1 View
google map 1.2.1 site 2.1.1 type of
permit solar panel
1.1.1 View
google map 1.2.1 site 2.1.1 type of
permit solar panel
2.1.2 No of Sola
Panel
tall a solar energy for power generation.
nergy to protect environment.
2 Design 3 Installation
3.2.1 Micro
Invertor
3.2.3 Charge
Controller
3.1.2 Nut
2.1.2 No of Solar 3.2.4 Voltmeter
Panel
4 Inspection 5 closing
5.1Record Result
3.2 Electrical 4.1 PhysicalI 4.2 Technical
system nspection Inspection
.2.3 Charge
Controller 4.2.2 Current output
2.4 Voltmeter
42.3Voltage Output
.2.6 Pyrometer
losing
ecord Result
osed
mentation
osed
mentation