You are on page 1of 4

We reserve all rights in this document and in the information contained therein.

Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
Beijing ABB Drives

Technical Requirement Specification

Integrated Transformers for ACS 2000 Frequency Converters


ACS2000

Project: Indonesia BOSOWA project

Main electrical data

Typical connection diagrams

No. of p.
Issued Yonggang.Li 2015.05.19 ACS 2000
Check / rel. Xuqiang.Qin 2015.05.19 Int. Transformer Specification 4
Resp. dept. MV Drives
Document No. Lang. Rev. ind. Page

ABB Beijing Drive Systems Co., Ltd 2UBB010680 EN/CN - 1


01. Quantity 3

02 Rated voltage HV (r.m.s. value, phase to phase) UL 11000V

03 Network Voltage tolerance Ul +10% / -10%

04 Rated power of HV winding (IEC 61378-1) SR 2100 kVA


(Remark: supply undervoltage considered in power calculation)

05. Tappings at HV winding: None

Intended for off-circuit, off-load or on-load tapp-changing

06. Rated voltage LV (r.m.s. value, phase to phase) UL 1850 V


( , )
07. Rated frequency fL 50 Hz

Tolerance +2% / -2%

08. Type of transformer: dry-type (see IEC 60076-11) or oil Dry type
immersed (see IEC 60076-2)

09. Winding materials Cu.

10. Duty cycle: (converter current ISN) 10 1 110%


ISN
11. External cooling medium

- Maximum temperature of cooling medium 40.0 [C]

The ambient temperature of integrated transformer


may be continuously 40C
40C
12. Conditions on site: indoor / outdoor, altitude, climatic Indoor
zone
If earthquake proof: acceleration due to gravity for all
directions 2000 m a.s.l.

Document No. Lang. Rev. ind. Sheet

ABB Beijing Drive Systems Co., Ltd 2UBB010680 EN/CN - 2


13. Insulation class & temperature rise H

14. Cooling type Air Force

15 Dimension 2UBB001853

16. Transformer accessories

a) general 1pc PT100 per phase for


winding temperature sensor
b) additional for dry-type or oil-immersed type
PT100

17. Comments, appended documents:

1. General transformer specifications 2UBB001875 Rev. H

Fig.1: Typical Connection Diagrams


1

Fig.1: Based on: 2UBB001875 Rev. H


1 2UBB001875 Rev. H

Document No. Lang. Rev. ind. Sheet

ABB Beijing Drive Systems Co., Ltd 2UBB010680 EN/CN - 3


Revision
Rev. ind. Description Date / Status
First issue 2015.05.19/Final

Document No. Lang. Rev. ind. Sheet

ABB Beijing Drive Systems Co., Ltd 2UBB010680 EN/CN - 4

You might also like