Introduction

The Strata Title Act 1985 was the first piece of legislation passed to govern subdivision of buildings
into parcels and the subsequent issuance of strata titles in Peninsular Malaysia. Over time, the Strata
A
Title Act 1985 proved to be insufficient particularly in covering the various aspect of management of
subdivided buildings. This led to the enactment of the Building & Common Property (Maintenance &
D
Management) Act 2007 to specifically address issues of maintenance and management of high-rise
EH

buildings and their common properties by developers, Joint Management Body and Management
Corporations.

On 1 June 2015, the Housing Development (Control & Licensing) Act 2012, Strata Titles
R

(Amendment) Act 2013 and Strata Management Act 2013 came into effect. The implementation of
these Acts is supplemented by the Housing Development (Control & Licensing) (Amendment)
Regulations 2015 and Strata Management (Maintenance & Management) Regulations 2015. The
combined effect of these legislation is to promote transparency and accountability in the housing
development industry.

The new Acts require developer to fulfill certain pre-requisites before proceeding with any sale of
strata property particularly in obtaining SiFUS and filing the Schedule of Parcels. SiFUS refers to the
Certificate of Share Unit Formula (Sijil Formula Unit Syer - SiFUS) which is to be issued by the Land
and Mines Office (PTG) prior to the commencement of the sale of strata properties. This is to ensure
that the process for the application of Strata Title can be carried out efficiently and to achieve vacant
possession with simultaneous delivery of Strata Title. It is also the duty of a developer to file the
Schedule of Parcels with the Commissioner of Building (COB) and exhibit a copy of the Schedule at a
conspicuous position at the office where the sale of strata property is conducted in order to promote
transparency.

Once the construction of a development reaches the completion of it's superstructure stage, the
developer must begin the process of applying for subdivision of the building. A new provision under
the Strata Title (Amendment) Act 2013, now requires the developer to apply and obtain a Certificate
of Proposed Strata Plan (CPSP) from the Director of Survey in JUPEM. The developer needs to
apply for Strata Titles within one month after the issuance of CPSP. Thus, upon the delivery of the
vacant possession, the Strata Title will be simultaneously delivered to the purchaser.

The following flowcharts indicate the NEW work processes on strata development.
1
Flow Chart for SiFUS and Strata Title Application for Strata Developments

Planning Permission
Approval

Building Plan Approval

SiFUS

Filling of Schedule of
Parcels at COB*

AP / DL

Sale
A
Construction
D
EH

Apply for Strata Title Superstructure Stage


R

Strata Title Not


CCC
Issued

Strata Title
Apply to Controller of
Housing for a written
certification

Certification Letter
issued by Controller Vacant Possession
of Housing

Strata Title

Deliver to Purchaser

Note (*):
COB = Commissioner of Building

2
Application for SiFUS and Schedule of Parcels Prior to Sale

Planning Permission by LA*

Approved Building Plan (BP) by LA*

Developer to apply for Developer to appoint Licensed The application of SiFUS and
Developer's License (DL) Land Surveyor (LLS) and obtain Schedule of Parcels need to be
and Advertising & Sale Sijil Akuan from Lembaga Jurukur filed with the COB before sale of
Permit (AP) from KPKT* Tanah any parcel or CPSP application
(whichever is earlier). (Strata
Management Act 2013, S6).
Documents required for DL and Submit application online
Apply to JUPEM* to obtain Project Documents required for SiFUS*
AP application: on BLESS
Number application:
- Copy of Land Title / Qualified
Title documents - All relevant land matters are
- Approval letter of Planning settled (land conversion,
Permission Approval obtained payment of land premium,
Prepare 6 sets of document for Qualified Title, etc.)
- Approval letter of Building
SiFUS* application - Receipt of payment for Land
Plan
- Form L2C Premium (if any)
- Certification from the Board of - QT application letter certified
Surveyors by Land Office (if land is held
Approval Letter Developer to submit application to
- Copy of approved under QT or FT yet to be
PTG* to obtain SiFUS* approval issued)
pre-computation plan
- Joint venture agreement (if - Receipt of Quit Rent for the
any) current year
- Copy of Start Work Notice Developer to open HDA* - Letter of appointment of
A
(Form B) account PTG* Approval Licensed Land Surveyor
- Report from CCRIS / CTOS obtained - Receipt of surveying fees by
D
- Copy of the draft Land Surveyor Board
advertisement (brochure) and - Share Unit Formula
Developer to deposit 3% (Any changes due to any
other proposed
EH

of estimated cost of amendment to BP which has


advertisements. Brochure in Developer to lodge 6 sets of
construction (exclude land been issued with SiFUS, new
Bahasa Malaysia. Schedule with COB*
cost) into Housing application must be submitted
- Price list of every unit of
Development Account to PTG for approval and new
housing according to type
(HDA (Amendement) Act certificate to be issued)
- Approval letter on the pricing
R

2012, S.6.1a & 1b) - Schedule of Parcels signed by


for low cost housing from the COB* to acknowledge, retain 1
State Authority Licensed Land Surveyor and
set of Schedule and distribute
Architect/Engineer
- Certificate of SiFUS others
- Approved Building Plans
- Copy of Schedule of Parcel Developer to update
- Certified calculation on Gross details of HDA* on BLESS All plans to be signed by LLS and
Development Cost (GDC)
Architect.
and Gross Development
3 sets to 1 set to 1 set to (Strata Management
Value (GDV) by Architect
Developer PTG* JUPEM* (Maintenance and Management)
KPKT* to inform
Regulations 2015, S9)
developer on final
approval
Any amendments to the Schedule
Developer to of Parcels can be made only:
Documents required during exhibit 1 set at i) as per the requirement of
Developer to pay fees and
collection of DL and AP: Sales office local authority; or
collect AP and DL at
- Approval letter from BLESS KPKT's counter ii) with agreement of all
- Form A1 purchasers of the
- Bank Slip development
- Certified calculation on GDC
and GDV by Architect In case of such changes,
- Bank draft for payment of developers must submit within 30
Sale days from the date of alteration or
fees
revision of building plans as
amended schedule of parcels.
(Strata Management
Note (*): (Maintenance and Management)
LA = Local Authority (Pihak Berkuasa Tempatan) Regulations 2015, S7)
SiFUS = Certificate of Share Unit Formula (Sijil Formula Unit Syer)
PTG = Pejabat Tanah dan Galian (Land and Mines Office) A copy of the Schedule of Parcels
COB = Commissioner of Building (Pesuruhjaya Bangunan) need to be exhibited at a
conspicuous position in any
KPKT = Ministry of Urban Wellbeing, Housing and Local Government (Kementerian
developer's office or branch office
Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan) and at such place where the sale
HDA = Housing Development Account of parcels is conducted.
JUPEM = Jabatan Ukur dan Pemetaan Malaysia (Department of Survey and Mapping Malaysia)

3
Application for Strata Title Prior to Vacant Possession

Construction

Superstructure stage completed

When the building


superstructure is completed, LLS* to apply for Certificate of
within 3 months from the Proposed Strata Plan (CPSP) to
issuance of Form G12; or Director of Survey in JUPEM*
within 3 months from the
issuance of CCC* for projects
sold prior to 1st June 2015,
LLS* needs to submit all
Proposed Strata Plan to JUPEM* checks site and building and LLS* prepare Certified Strata Plan
JUPEM* to apply for issues CPSP if in order (within 2 weeks after CPSP)
Certificate of Proposed Strata
Plan (CPSP).
[Strata Titles (Amendment)
Act 2013, S8A & S 20A]

The original proprietor of the Apply to Land and Mines Office (PTG*)
land or building must apply for JUPEM* to certify Strata Plan
for Strata Title with CPSP
subdivision of building or land
within 3 months from the date
of issuance of Certificate of
A
Super Structure Stage.
[Strata Titles (Amendment)
D
Act 2013, S20] PTG* The reason of strata title not
Approval Strata Title not issued issue is not attributed to the
Developer must also ensure Developer.
EH

the below conditions before


making an application for
subdivision of building or land:
i) the land is held under final Developer to apply to Housing Development Act
R

title Controller of Housing for (Amendment) Act 2012,


ii) use of the land is not a written certification Schedule H
contrary to the land
category and conditions
iii) the land is not subject to PTG* to register Strata
any charge or lien Title and issue to
developer Controller issued the
[Strata Titles (Amendment)
written certification
Act 2013, S9(2)]

Developer shall transfer Strata


Title to the purchaser within
30 days from the date of Certification
issuance of strata title by the Letter
Land Administrator or any
Strata Title
extended period approved by
the COB upon the opening of
the strata register.
[Strata Titles (Amendment) Strata Title
Act 2013, S19A]

Conditions of delivery of VP* :


- With Strata Title or with Developer to deliver
Delivery of VP*
certification from the Strata Title to Purchaser
Controller of Housing
- Deeming provision
[Schedule H, S27 & S28]
Note (*):
LLS = Licensed Land Surveyor
PTG = Pejabat Tanah dan Galian (Land and Mines Office)
JUPEM = Jabatan Ukur dan Pemetaan Malaysia (Dept. of Survey and Mapping Malaysia)
VP = Vacant Possession