Professional Documents
Culture Documents
Grading Policy:
Class work: 10%, Project: 30% , Final Exam: 60%
Share Knowledge
Share Experiences Team Approach
Share Questions
Let us be a teamwork.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 4
Quality Management
What is Quality?
What is Quality Management?
Quality
means
Result:
In Egypt a 1% error rate would mean everyday
1% failure
14.4 minutes without water or electricity
(0.01 * 24 hours/day * 60 minutes)
Fit to Customer
Fit to Standard
Fit to Time
Fit to Price
Customers Types:
Customers
--
--- --- ---- --- ---
Time Scope of
work
Price
Quantity Quality
Product-Based:
Quality is precise and measurable
User-Based:
Quality lies in the eyes of the user
Manufacturing-Based:
Quality is conformance to the firms developed
specifications
Value-Based:
Quality is a trade-off between price and value
R(t)
0
time
9) Quality Improvement
Recommenaditions 3) Quality Policy
& Objectives
Continuous
Improvement
8) Quality Control 4) Quality
(KPIs) Plans
5) Quality
7) Weekly
Orgnization
Inspection Report
6) Execution &
Inspection
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 17
Quality Management System (QMS):
QMS is a set of policies, processes and procedures required for quality
planning, control and improvement to meet the customer requirements.
Quality Policy
Customer
Requirements Customer
Quality Assurance Satisfaction
Quality Improvement
Improvement
Quality
Policy
Top Objectives
Planning
Middle
Control
Operational
Inspection
Feedback
Site / Workshop
Improvement
Quality
Policy
Quality
Auditing Assurance Objectives
(Internal / External)
Quality Planning Planning
Control
(KPIs)
Quality Control
(Checklist / Standard Forms)
Vision / Policy
(Strategic Objectives 3 to 10 years)
Goals SMART:
(Long term 2 to 3 years) Specific
Measurable
Applicable
Reliable
Targets Time frame
(Short term month to year)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 23
Quality Policy (QP):
describes the organization approach to quality
One Page Quality Management Roadmap.
It should be understood to all level of organization.
Quality Quality
Objectives Guidelines / Rules
Quality
Standards
Company Name /
1 Fields
2 Quality Objectives
3 Quality Standards
4 Guidelines / Rules
Top Management
5 Commitment
Conclusion:
Quality Policy
ABC Steel Company is committed to ensure customer satisfaction and
minimize rejects. The company achieves this goal by establishing,
documenting, implementing and maintaining an effective and efficient
Quality Management System that meets the requirements of ISO
9001:2008. Quality improvement is a continuous process and it is
primary responsibility of management. All Staff must consistently
strive for a six sigma target.
------ --------
Before
Process
During
Process
After
Process
Comments:
Comments:
Company Overview
Quality Policy
For each project / product:
Work breakdown structure (WBS)
Project quality plan (PQP)
For each process / activity:
QA/QC check list for each process
Inspection and test plan
Actual inspection report
Process quality control
Continuous
4 Pillars of TQM: Improvement
CUSTOMER
FOCUS
TQM is the integration of all functions and processes within an organization in order
to achieve continuous improvement of the quality of goods and services.
To improve any process we need to know where we are and where we want to be.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 35
Deming Improvement cycle - (Plan Do Check - Act )
(4)
(1) (3)
(2)
Improvement
Planning
Execution
Control
Inventory Inventory
Improvement Planning
Inventory
Preparation
Inventory
Control
Quality Policy
Quality Policy
Plan Planning
Do Implementation
Safety Policy
Safety Policy
Plan Planning
Do Implementation
Total Customer
Performance
Satisfaction
Plan
Act Do
Check
Continuous
Improvement
Empowerment TQM+
6 Sigma
TQM
HRM
Lean
QA QMS
Quality
Teams
L6S
ISO 9001
QC
SPC
TPM SCM
Quality
Inspection/ Quality Plan JIT
ERP
Blame Testing Circles MRP
orientated CRM
MRP II
Reactive Proactive
(What Happened Analysis) (What If Analysis?)
F
Balance
Operator costs
costs of time spent by operators to gar data for testing product
quality, to make equipment adjustments to maintain quality, and to
stop work to assess quality
Scrap costs
costs of poor-quality products that must be discarded, including labor,
material, and indirect costs
Rework costs
costs of fixing defective products to conform to quality specifications
Process failure costs
costs of determining why production process is producing poor-
quality products
Process downtime costs
costs of shutting down productive process to fix problem
Price-downgrading costs
costs of discounting poor-quality productsthat is, selling products as
seconds
Source: A. V. Feigenbaum, Total Quality Control, 3rd ed. (New York: McGraw-Hill, 1983), p. 112; and
Joseph M. Juran and F. M. Gryna, Quality Planning and Analysis (New York: McGraw-Hill, 1970), p. 60.
Labor index
ratio of quality cost to labor hours
Cost index
ratio of quality cost to manufacturing cost
Sales index
ratio of quality cost to sales
Production index
ratio of quality cost to units of final product
Cost of quality
Difference between price of nonconformance and
conformance
Profitability
In the long run, quality is free
Total quality
Costs
Costs per Failure Costs
good unit Internal + External
of
Product
What is ISO?
International Organization for Standardization
1994
Originally TQM
released as
ISO 9001:1987
ISO 9001 is the only standard in the ISO 9000
1987 family that can be used for certification
0. Introduction -0
1. Scope -1
2. Normative Reference -2
3. Terms and Definitions -3
September 2015
Published International Standard
2- Leadership
6- Evidence-based
Decision Making 4- Process Approach
5- Improvement
Annex A - (informative)
Clarification of new structure, terminology ) (- ) (
and concepts
Annex B - (informative) ) (- ) (
Quality management principles
Annex C - (informative)
) (- ) (
The ISO 10000 portfolio of quality
management standards 10000
Source: 2004 Criteria for Performance Excellence, U.S. Dept. of Commerce, Baldrige National Quality
Program, National Institute of Standards and Technology, Gaithersburg, MD 20899. (www.quality.nist.gov)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 80
Other Awards for Quality
Stephen Covey
Actual Target
Performance Performance
Continuous Improvement
Top Management
Facility Managers Top
Operational Level
XXX disciplines Operational
7) GAP (+ / -) (Graph)
KPIs must be SMART:
- Specific
8) Analysis (Strength / Weakness) - Measurable
One Page - Applicable
Management - Reliable
9) Improvement Recommendations
- Time Based
10) Improvement Plan
(Activity, Schedule, Budget, Responsibility)
1) Critical success
indicators
KPIs
5) Total view 3) Quantifiable
(integration) measurements
4) Readable &
standardized
Company Departments
Operation
..
Company Maintenance
Planning
Safety
Human Resource
Procurement IT
Inventory
Financial Department
Resources Outputs
Inventory Turnover
Value added
Operation Department
Resources Outputs
Cost Variance
Quality %
Maintenance Department
Resources Outputs
Customer
Performance % Satisfaction
Cost Variance
Availability %
1,000,000
1 ( C ) ( ) ( )
10
( ) ( )
30 KPIs
( ) 1
:
( ) 100
( ) 10
1500
= 150,000
= 10
=
% (10/150000)*1000000 ( ) 30
= 66.7
Safety Department
Resources Outputs
Accident
Performance % Frequency Rate
IT Department
Resources Outputs
Customer
Performance % Satisfaction
Cost Variance
Availability %
Inventory Department
Resources Outputs
KPIs
Procurement Department
Resources Outputs
KPIs
KPIs
Planning Department
Resources Outputs
KPIs
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 100
Key Performance Indicators (KPI)
(Balanced Scorecard)
For example;
Financial Market
Process (Outputs)
Manpower
For example;
If you cant measure it, you cant manage it; Peter Drucker
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 102
How to measure the strategic objectives?
Cause / Effect Relationship; for example
Market # of
Market Share Customers
Quality Performance
Process Rate Rate
Labor Safety
Manpower Productivity (Near-Miss Rate)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 103
Calculations of KPIs; for example:
Perspective Key Indicators Equation Raw Data Responsibility
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 104
KPIs Analysis; for example:
Actual Target
Perspective Key Indicators Unit Benchmark
2015 2016
Profitability % 21 24 30
# Customer # 90 80 100
Near-Miss Rate # 14 15 12
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 105
KPIs Analysis; for example:
Profitability % 21 24 30 (7/10)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 106
Star Diagram Revenue Profitability
Benchmarking
Target
# Near-Miss
Market
Share
Actual
#
Labor
Customer
Productivity
Profitability X
# Customer X
Performance Rate X
Near-Miss Rate X
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 108
For example:
KPIs Report
Recommendations:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 109
For example:
KPIs Report
KPI A B C
Recommendations:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 110
Case Study: The production information for cast iron manufacturing is as follows:
Department Item Unit Actual 2014 Actual 2015
Value Added Factor Unit Price / Unit Material Cost Factor 2.4 to 2.6
Production Rate Net Production Quantity / Production Time Ton/hr 1.1 to 1.2
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 112
1) Profit Ratio 10 Actual 2015
Actual 2014
4) Material 2) Value
Yield Added
0
10 8 8 10
10
3) Production Rate
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 113
Current Situation Analysis
Company: xxxx Product: yyyy
Recommendations:
To increase the production rate ; reduce
Strength Points: the time losses
To improve the material yield; reduce the
1 - Profit ratio (25 > 20%)
material scrape
2 Value Added (2.57 > 2.4 %) To improve the overall performance,
achieve motivation programs
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 114
Case Study: The production information for cast iron manufacturing is as follows:
Department Item Unit Actual 2014 Actual 2015
Market Plan ton 450 450
Sales
Sales Quantity ton 400 420
Department
Unit Price LE/ton 5000 5100
Unit Cost Total Cost / Net Production Quantity LE / unit 3800 to 3500
Labor
Productivity Market Ratio
10 8 8 10
10
Unit Cost
Benchmarking KPIs or Targets: Sacle A2014 Scale (10) Evaluation
Sales Revenue (1.9 to 2.1) M.LE 8-10 2.0 9 +
Market Ratio (85 to 95) % 8-10 88.9 8.8 +
Unit Cost (3800 to 3500) LE/unit 8-10 3939 6.8 -
Labor Productivity (34 to 36) ton/man 8-10 33 7.0 -
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 116
Actual 2015 Sales Revenue 10
Labor
Productivity Market Ratio
10 8 8 10
10
Unit Cost
Benchmarking KPIs or Targets: Sacle A2015 Scale (10) Evaluation
Sales Revenue (1.9 to 2.1) M.LE 8-10
Market Ratio (85 to 95) % 8-10
Unit Cost (3800 to 3500) LE/unit 8-10
Labor Productivity (34 to 36) ton/man 8-10
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 117
Current Situation Analysis
Company: xxxx Product: yyyy
Recommendations:
Strength Points:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 118
What is the balanced scorecard?
An Integrated Approach to Performance Management
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 120
Quality Control System
Before During After
Continuous
Improvement
Technical Technical
Standard Standard
or 3% Must be customized or 3%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 121
Variance Analysis:
What is mean (average)? n
x x
What is Standard deviation (Sigma)? 2
That is a measure of dispersion around i
the mean. n 1
X
X
X XX
X X X X
XX XX
X XXX
XX
X
X
Degree of
= 1.4 variation = 0.7
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 122
Coefficient of Variation (V%)
( V% < 3% Excellent )
For Example:
Criticality: Medium
Level Excellent Good Fair Poor
V% < 10% 10-15% 15-20% > 20%
2007
Criticality: High
Level Excellent Very Good Good Fair Poor
V% < 3% 3-4% 4-5% 5-6% > 6%
Default
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 123
Discuss the variance analysis:
40, 55, 75, 95, 95
n
xi x
2
i 1 2380
s 595 24.39
n 1 5 1
By calculator:
V % = (Standard deviation / Mean) * 100 Mean = 72
= (24.39 / 72 )*100 = 33.88 % (Poor) Standard deviation = 24.39
Range = Max Min = 95-40=55 V% = 33.88%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 124
Example: Variance Analysis
Process Data:
9 10 11 12 10 13 11 10 12 9
7 9 11 10 8 9 11 9 10 8
10 8 10 9 11 10 10 12 11 10
Frequency:
Value 7 8 9 10 11 12 13
Frequency 1 3 6 10 6 3 1
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 125
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 126
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 127
Mean & Standard Deviation
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 128
Discuss the following figures:
Normal distribution curves
Same mean; but different standard dev.
a) 3=0.5
Standard dev. 3 < 2 < 1
2=1
Process capability Cp3 > Cp2 > Cp1
1=2
Process 3 is better than (2 & 1)
b)
Actual Normal distribution curves
Target
Different mean; but same standard dev.
Standard dev. 2 = 1
x
Actual mean is shifted
1 2
Process is not capable
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 129
x x
Normal Distribution: n
2
x
i
i
x i 1
Beta n n 1
Normal
Uniform
x
Standard Normal
Distribution Curve
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 130
Normal Distribution Test:
Normal
Beta
Uniform
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 131
Distributions Histogram Appearance Statistics
Shape
Skewed left
Long tail of histogram points left
(negative Mean < Median
(a few low values but most data on right)
skewness)
Tails of histogram are balanced
Symmetric Mean Median
(low/high values offset)
Skewed right
Long tail of histogram points right
(positive Mean > Median
(most data on left but a few high values)
skewness)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 132
To summarize data, you will need to determine:
Measures of central tendency: They are Mean
used to tell us how many observations Median
were recorded and how frequently each
Mode
score or category occurred.
Range is the difference between the highest score & the lowest score
Variance, mean deviation, Reflects the extent to which any score deviates from
the mean (how close or how far away)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 133
Central Tendency
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 134
Dispersion
Measures of Variation
Statistic Formula Excel Formula
n
Standard
ix x 2
=STDEV(Data)
deviation (s) i 1
n 1
Coefficient. of s
variation (CV)
100 None
x
n
Mean absolute xi x =AVEDEV(Data)
deviation (MAD) i 1
n
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 135
Areas Under the
Normal Curve
Example: = 1.000
= 0.0016
7.5 4.5
-6 -5 -4 -3 -2 -1 X +1 +2 +3 +4 +5 +6
Sigma Level PPM Yield Performance
1 691,462 31% F
2 308,537 69% D
3 66,807 93.3% C
4 6,210 99.3% B
5 233 99.98% A
6 3.4 99.9997% A+
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 138
Sampling Inspection
QHSE
100% inspection
Quality Health Safety -
Inspect every part Environment
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 140
Determine Sample Size (n) :
no = (Z-score) * (StdDev)/ (margin of error) Standard Normal Distribution Curve
no = (Z * / E)
For example;
Lot Size = N=1000
no = (1.96* 0.12/ 0.05) = 22
Sample size = n=30
n = 22 * 1000 / (22+ (1000-1)) = 21.6 = 22
Process = 0.12
Target sample size n 22 unit n = 30 > 22 Accepted
Check the sample size.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 141
What is a Process Map?
Symbols:
Operations
Inspection
Transportation
Delay
Storage
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 142
Process Flow Diagram (Process Map):
Finishing
Check Incomplete 1% Defect
5 unit/hr
Process
List 20.25 hr
Defect %
Performance
Duration
Product Description:
A welded water tank
Symbols: open on one side. Painting
1% Defect
Operations 500 4 units/hr
500 25.25 hr
Inspection
Transportation 500
Delay
Customer
Storage
(All dimensions are in mm)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 143
QA/QC Check List:
Quality Assurance / Quality Control checklist is used to ensure the quality of a
product / process. It defines set of tasks & inspections to be performed in
different stages of the product/process.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 144
Quality Management and Productivity
Productivity
ratio of output to input
Raw Final
Material Product
Material Analysis:
Scrape = 20.8%
= 208000 PPM
Material yield = 79.2%
Z= (1 to 2) = 1.40
Sigma level = 1.40
Z Yield
1 68.27
X 79.2
2 95.45
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 148
Normal Distribution Shifted by 1.5 (Practice)
Sigma Level PPM Yield Performance
1 691,462 31% F
2 308,537 69% D
3 66,807 93.3% C
4 6,210 99.3% B
5 233 99.98% A
6 3.4 99.9997% A+
Quality Analysis:
Defect ratio = 5.0% = 50000 PPM (Goal: 3.4 PPM)
Quality yield = 95%
Z= (3 to 4) = (C to B) = Sigma level = 3.28
Z Yield
3 93.3
X 95.0
4 99.3
(x-3)/(4-3) = (95.0-93.3)/(99.3-93.3) X = 3.28
Material Analysis:
Scrape = 20.8% = 208000 PPM
Material yield = 79.2%
Z= (2 to 3) = Sigma level = 2.42
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 149
Statistical Process Control (SPC)
A methodology for monitoring a process to identify special causes
of variation and signal the need to take corrective action.
3- Histogram
5- Cause-and-effect diagram
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 151
Wilfredo Pareto 1848-1923
Italian Economist
Category Total %
A Defective material 3 2.4%
B Defective parts 12 9.6%
Wrong part
C 16 12.8%
dimensions
D Surface finish 3 2.4%
E Machine errors 7 5.6%
F Operator errors 4 3.2%
G Poor design 80 64.0%
Total 125 100.0%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 155
Example: Pareto Chart Pareto Chart
Arc Welding for Gas Pipeline
Rule 80/20
Defect Frequency:
Defect Defect
# %
Description Freq.
A Incomplete Joint 100 17.8
B Improper Fusion 40 7.1
C Overlap 10 1.8
Insufficient 60 10.6
D Penetration
E Pits 100 17.7
F Porosity 120 21.2
G Vertical Crack 40 7.0
H Under Bead Crack 52 9.2
I Irregular Weld 24 4.2
K Others 20 3.5
Total 566 100 76 / 50
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 156
Cause-and-Effect Diagram (Fishbone diagram)
A method a work group can use to identify the possible causes of a problem
Failure /
Defect /
Problem
Inspection Operating
Accuracy Control conditions Type & Storage
Specs
Man Machine
F Focus
I Improve Process
capability?
(effect)
S Sustain
Method Material
H Honor
(causes)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 159
Scatter Diagrams
Scatter Diagrams are used to study and identify the possible relationship
between the changes observed in two different sets of variables.
X1 X2 X3
X4 X5 X6
Y Y
*
* *
*
* * * * *
*
* *
* * * *
* *
X X
No Correlation: Perfect Negative Correlation:
r=0 r = 1
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 161
Example:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 162
Process Control Chart
+ 3 Process Average
- 3
LCL
TIME
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 163
Control Charts
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 164
SPC: Control Limits
+3x UCL
-3x LCL
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 165
5-30
Control Charts:
Tool to diagnose problems
Tomorrow ?
Process Parameter
Analysis
Time Today
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 166
Process Control Chart UCL
Normal Behavior
LCL
UCL
LCL
UCL
LCL
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 167
How to check the control chart
UCL
UCL UCL
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 168
Discuss the following process control chart:
a) All points in control area, but not normal
The points are not fluctuated around the mean
One point (1/9) is above the mean (upper side)
8/9 points are under the mean (lower side)
7 consequence points are under the mean
Unstable process & May be abnormal conditions
We need to investigate the process and define the
LCL root causes.
UCL
b) All points in control area, but not normal
The points are not fluctuated around the mean
Unstable process & May be abnormal conditions
We need to investigate the process and define the
LCL root causes.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 169
Type I and Type II Errors
Study Conclusion
Out of Control In Control
Truth
LCL
LCL
LCL
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 171
Two Types of Control Charts
Variable Control Charts
Deal with items that can be measured; examples:
Weight Height Speed - Volume
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 172
Control Charts for Attributes:
p chart fraction defective
np chart number defective
c, u charts number of defects
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 173
Control Chart Selection
Quality Characteristic
variable attribute
defective defect
no
n>1? x and MR
constant
yes constant yes
p or sampling
sample
np unit?
no size?
n>=10 or
x and R
computer? yes no
no
yes
p-chart with c u
x and s variable sample
size
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 174
Control Chart for Attributes (p-Chart)
A chart used for controlling the proportion of defective
services or products generated by the process.
Given: T o ta l N u m b e r o f D e fe c tiv e s
p =
T o ta l N u m b e r o f O b s e rv a tio n s
p (1- p)
sp =
n
UCL = p + 3sp
LCL = p - 3sp
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 175
Example of Constructing a p-chart:
Sample n Defectives p Calculate the average of the
1 100 4 0.04 sample proportions:
2 100 2 0.02
55
3 100 5 0.05 p = = 0.036
4 100 3 0.03 1500
5 100 6 0.06
6 100 4 0.04 Calculate the standard deviation
7 100 3 0.03 of the sample proportion:
8 100 7 0.07
9 100 1 0.01 p (1- p)
10 100 2 0.02
sp =
n
11 100 3 0.03
12 100 2 0.02 .036(1- .036)
13 100 2 0.02
=
100
14 100 8 0.08
15 100 3 0.03
= .0188
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 176
Calculate the control limits.
UCL = p + 3sp
.036 3(.0188)
LCL = p - 3sp
UCL = 0.0924 LCL = -0.0204 (or 0)
p
0.16
0.14
Plot the individual sample proportions and the control limits
0.12
0.1 UCL
UCL
0.08
0.06
0.04
CL
0.02
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Sample number
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 177
Variable Control Chart - n < 10 - Average and Range Charts
Centerline
shows where the process average is centered or the central tendency of
the data
Upper control limit (UCL) and Lower control limit (LCL)
describes the process spread
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 178
Variable Control Chart - n < 10 - Average and Range Charts
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 179
X-bar and R charts
UCLx-bar = X-D bar + A2 R-bar
LCLx-bar = X-D bar - A2 R-bar
UCLR = D4 R-bar
LCLR = D3 R-bar
n=5
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 182
X-bar Chart
5.10
UCL
5.08
5.06
5.04
X bar
5.02
5.00 CL
4.98
4.96 LCL
4.94
0 1 2 3 4 5 6 7 8 9 10 11
Subgroup
R Chart
0.25 UCL
0.20
Range
0.15
CL
0.10
0.05
LCL
0.00
0 1 2 3 4 5 6 7 8 9 10 11
Subgroup
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 183
Variable Control Chart - (n 10) - Average and Standard Deviation Charts
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 184
Case Study:
The table below gives the average and standard deviation of the depth of
key way on shaft in mm. The subgroups size is 10 .
Sub
1 2 3 4 5 6 7 8 9 10
group
X\ 6.35 6.41 6.44 6.56 6.42 6.40 6.42 6.44 6.45 6.41
0.031 0.026 0.024 0.040 0.036 0.035 0.021 0.032 0.016 0.039
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 185
Process Capability Ratios
(Specification limits) / (Process control limits)
Process performance is
not necessarily centered
between the spec limits The shaded areas
This curve is the represent the
distribution of data percentage of off-spec
from the process
production
Voice of Customer
Voice of Process
Cp = 1.0
(Capable) X
LSL = 8.2
LCL
Not Not Capable High Very
capable capable Capable Good
Cp = 1
Cp<1 Cp<1 Cp>1 Cp > 1
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 189
Discuss the following figures:
1000.5
Process: Machining
LSL
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 190
(1) (2) (3)
(4)
Month #1 Month #2 Month #3
Month #4
USL
LSL
The mean is shifted; Process is not stable
Month #1 Process control limits are out specification limits
Cp <<1; (not Capable- very poor)
The mean is centered; Process is stable
Month #2 Process control limits are out specification limits
Cp <1; (not Capable- poor)
The mean is centered; Process is stable
Month #3 Process Control limits are within specification limits
Cp=1; (Capable - good)
The mean is centered; Process is stable
Month #4 Process Control limits are within specification limits
Cp>1; (High Capable very good)
Overall Continuous improvement
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 191
Discuss the following figures:
Process: Machining 1000.5
USL = 100.5
(b)
(a) (d)
(c)
LSL = 99.5
The mean is centered; Process is stable
(a) Process Control limits are within specification limits
Cp=1; (Capable - good)
The mean is shifted to USL; Process is not stable
(b) Process control limits are out specification limits
Cp <<1; (not Capable- very poor)
The mean is shifted to LSL; Process is not stable
(c) Process control limits are out specification limits
Cp <<1; (not Capable- very poor)
The mean is centered; Process is stable
(d) Process control limits are out specification limits
Cp <1; (not Capable- poor)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 192
Case Study:
LCL = 18.6
Cpl = (Mean-LSL) / 3 = 0.56< 1; not capable
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 193
How to improve the process capability?
etc.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 194
Process Capability Chart
Cpu = (USL Mean) / 3
USL x
(c)
(b) Mean
(a)
Target
Mean
(d)
LSL x
Three sigma
Cpk >= 2 Capable at 6
Process
Capability &
Design For 6 Lower Upper
Sigma specification Mean specification
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 196
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 197
Advanced Tools: Design of experiments by Taguchi method
Process Parameter Diagram:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 198
For example; Friction Stir Spot Welding
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 199
Process Parameter Diagram:
Process: Friction Stir Spot Welding (FSSW)
Temperature
Humidity
Wear
Shrinkage
Material Strength
Vertical force Hardness
Tool geometries Corrosion
Shoulder angle Cost
Rotational Speed
Plunge Depth
Dwell time
Plunge rate
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 200
Design of experiments by Taguchi method
START
1
7
END
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 201
Taguchi method ?
Time, Effort, Cost
For example; four factors with three levels
Experiments #
Full factorial =(4)=64
Taguchi design= 4*(3-1)=8 = 9 DOF
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 202
Conduct the Matrix Experiment
Factors
Run # Response y
A B C D
1 1 1 1 1
2 1 2 2 2
3 1 3 3 3
4 2 1 2 3
5 2 2 3 1
6 2 3 1 2
7 3 1 3 2
8 3 2 1 3
9 3 3 2 1
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 203
Design of experiments by Taguchi method in Minitab
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 204
Tensile Shear load
Factors Trail
MEAN S/N
Run# RS PD PR DT
(rpm) (mm) (mm/min) (sec) T1(KN) T2(KN) T3(KN) ratio
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 205
Main effects of s/n ratios of tensile shear load.
Level RS PD PR DT
1 16.25 15.08 16.88 16.63
2 15.77 16.41 16.29 15.48
3 17.25 17.79 16.10 17.17
Signal-to-noise: Larger is better
Rotational speed(rpm) plunge depth(mm)
18
Mean of S/N ratios for tensile shear load
17
16
15
1000 1500 2000 0.5 0.7 0.9
plunge rate(mm/min) Dwell time(s)
18
17
16
15
10 20 30 4 6 8
parametar levels
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 206
Main effects of means of tensile shear load.
Level RS PD PR DT
1 6.598 5.702 7.060 6.926
2 6.194 6.740 6.703 5.991
3 7.480 7.830 6.509 7.356
7.5
7.0
6.5
6.0
7.5
7.0
6.5
6.0
10 20 30 4 6 8
parametar levels
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 207
Analysis of Variance (ANOVA) for tensile shear load
rotational
dwell time
speed
23%
17%
plunge rate
5%
plunge depth
55%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 208
Case Studies
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 209
Case Study #1 Lot Size = N = 1000 unit
Final Product Single Sample
Customer Required: Sample Size (3%): 30 Units
Product Dimensions Target Defect 1 unit from 30
8.40.2
8.4 0.2
M/c M/c M/c M/c M/c
#
#1 #2 #3 #4 #5
Based on this information,
discuss the following:
1 8.8 8.6 8.5 8.4 8.5
1. Problem Graph
2. Sigma Level
2 8.5 8.5 8.4 8.5 8.4
3. Normal Distribution Test
4. Variance Analysis 3 8.5 8.4 8.5 8.1 8.6
5. Process Control Chart
6. Average and Range Charts 4 8.5 8.5 8.4 8.6 8.5
7. Process Capability
8. Check the Sample Size 5 8.4 8.6 8.5 8.4 8.6
9. Process Parameters Diagram
10. Conclusion 6 8.7 8.4 8.5 8.6 8.5
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 210
1- Problem Graph: Lot Size = N = 1000 unit
Product: xxxx Final Product Single Sample
CTQ (Critical To Quality): Sample Size (3%): 30 Units
Diameter 8.4 0.2
8.40.2 Target Defect 1 unit from 30
USL = 8.6
Target = 8.4 M/c M/c M/c M/c M/c
#1 #2 #3 #4 #5
LSL = 8.2
8.8 8.6 8.5 8.4 8.5
Number of Defects = 3 units > 1
Rejected Lot size
Defect Ratio = 3/30 = 10% 8.5 8.5 8.4 8.5 8.4
35
30
30
27
8.5 8.4 8.5 8.1 8.6
25
20 8.5 8.5 8.4 8.6 8.5
15
10 8.4 8.6 8.5 8.4 8.6
5 3 1
0
Sample Size Accepted Rejected Target
8.7 8.4 8.5 8.6 8.5
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 211
2- Sigma Level:
Sigma Standard Normal Shifted by 1.5
Performance
Level DPPM Yield % DPPM Yield %
1 317,400 68.2600 691,462 30.8538 F
2 45,600 95.4400 308,537 69.1463 D
3 2,700 99.7300 66,807 93.3193 C
4 70 99.9930 6,210 99.3790 B
5 57 99.9943 233 99.9767 A
6 2.0 99.9998 3.4 99.99966 A+
Standard Normal: Practice (Shifted by 1.5):
Defect ratio = 10% Defect ratio = 10%
= 100000 DPPM = 100000 PPM
(Goal: 2 PPM 6 Sigma level) (Goal: 3.4 PPM 6 Sigma level)
Quality yield = 90% Quality yield = 90%
Z= Sigma level = (1 to 2) = 1.79 Z= (2 to 3) = 2.86
Z Yield Z Yield
1 68.27 2 69.1463
X 90.0 X 90.0
2 95.45 3 93.3193
Performance: F Performance: D
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 212
3- Normal Dist. Test LSL = 8.2 USL = 8.6
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 213
4- Variance Analysis:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 214
5- Process Control Chart: Mean = 8.497 = 0.12172
LCL = M - 3 = 8.14 UCL = M + 3 = 8.86
(Process Evaluation)
UCL = 8.86
X Bar Chart:
X// = 8.49 S(X/) = 0.05
UCL = 8.64
LCL = 8.34
Range Chart:
R/ = 0.28 S(R) = 0.16
UCL = 0.76
LCL = -0.2=0
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 216
Process Capability: Product: Target = 8.4 LSL=8.2 USL= 8.6
Process: Mean = 8.497 = 0.12172
LCL = M - 3 = 8.14 UCL = M + 3 = 8.86
Product: Process:
UCL = 8.86
UCL > USL & LCL < LSL
USL=8.6 Process is not capable
= 0.12
no = (1.96*0.12/ 0.05) = 22
no = (Z * / E)
n = 22 * 1000 / (22+ (1000-1))
n = no * N / (no+ (N-1)) = 21.6 = 22
Target sample size n 22 unit
n = 30 > 22 Accepted
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 218
8- Check the sample size
= 0.12
no = (3*0.12/ 0.02) = 324 units
no = (Z * / E)
n = 324 * 1000 / (324+ (1000-1))
n = no * N / (no+ (N-1)) = 245 units
Target sample size n 245 unit
n = 245 > 30 Not Accepted
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 219
9- Process Parameter Diagram:
Ambient temperature
Process: Machining Operator skills
Vibration & dust
Final Product
8.40.2
Rotational speed
Feed
Depth of cut
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 220
10- Conclusion:
Defect Analysis:
Number of Defects = 3 units > 1 Rejected Lot size
Defect Ratio = 3/30 = 10% Sigma level = 2.86 (practice)
Sample size Analysis:
n = 30 > 22 Accepted
Control Charts:
1/30 point is out of control (out of the LCL)
3 Points are rejected ( 2 Points above USL & 1 Point below LSL)
Mean is shifted to USL
Process Capability:
Process capability index <1 (not capable)
Normal Distribution Test:
Mode 8.5 < Target 8.4 (Shifted) (Beta Dist.)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 221
Case Study #2
Lot Size = N = 1000 unit
Final Product Single Sample = 24 units
Target Defect 1 unit from 24
30 0.2
mm Sample M/c M/c M/c M/c
# #1 #2 #3 #4
1 30.1 30.3 29.9 29.9
Based on this information,
discuss the following: 2 29.9 30.2 29.8 30.2
1. Problem Graph 3 30.0 30.1 30.0 30.0
2. Sigma Level
3. Normal Distribution Test 4 29.8 30.0 29.7 29.9
4. Variance Analysis 5 30.1 30.2 29.9 30.1
5. Process Control Chart
6. Average and Range Charts 6 29.9 30.1 29.8 29.8
7. Process Capability
8. Check the Sample Size
9. Process Parameters Diagram
10. Conclusion
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 222
1- Problem Graph: Lot Size = N = 1000 unit
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 223
2- Sigma Level:
Sigma Standard Normal Shifted by 1.5
Performance
Level DPPM Yield % DPPM Yield %
1 317,400 68.2600 691,462 30.8538 F
2 45,600 95.4400 308,537 69.1463 D
3 2,700 99.7300 66,807 93.3193 C
4 70 99.9930 6,210 99.3790 B
5 57 99.9943 233 99.9767 A
6 2.0 99.9998 3.4 99.99966 A+
Standard Normal: Practice (Shifted by 1.5)
Defect ratio = 8.33% Defect ratio = 8.33%
= 83300 DPPM = 83300 DPPM
(Goal: 2 DPPM 6 Sigma level) (Goal: 3.4 PPM 6 Sigma level)
Quality yield = 91.67% Quality yield = 91.67%
Z= (1 to 2) = x = 1.861 Z= (2 to 3) = x = 2.932
Z Yield Z Yield
1 68.27 2 69.1463
x 91.67 x 91.67
2 95.45 3 93.3193
Performance: F Performance: D
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 224
3- Normal Dist. Test LSL = 30.2 USL = 29.8
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 225
4- Variance Analysis:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 226
5- Process Control Chart: Mean = 29.9 = 0.1569
LCL = M - 3 = 29.5 UCL = M + 3 = 30.4
UCL = 30.4
LCL = 29.5
Process in control
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 227
6- Average and range (X-bar R ) charts
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 228
7- Process Capability: Product: Target = 30 LSL=30.2 USL= 29.8
Process: Mean = 29.99 = 0.1569
LCL = M - 3 = 29.5 UCL = M + 3 = 30.4
Product:
Process:
UCL = 30.4 UCL > USL & LCL < LSL
USL= 30.2
Process is not capable
LSL= 29.8
LCL = 29.5
Total Cp = (USL LSL) / 6 = (30.2 - 29.8)/6* 0.1569 = 0.43
Upper Cpu = (USL x`) / 3 = (30.2 29.99)/3* 0.1569 = 0.47
Lower Cpl = (x` -LSL) / 3 = (29.99 29.8)/3* 0.1569 = 0.39
Process capability index = Lower value (Cp, Cpu, Cpl) = 0.39 <1 (not capable)
This means, the process is not capable to achieve the desired.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 229
8- Check the sample size
= 0.1569
no = (1.96*0.1569/ 0.05) = 37.82
no = (Z * / E)
n = 37.82 * 1000 / (37.82 + (1000-1))
n = no * N / (no+ (N-1)) = 36.48 = 37 units
Target sample size n 37 units
n = 24 < 37 Not Accepted
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 230
9- Process Parameter Diagram:
Ambient temperature
Process: Machining Operator skills
Vibration & dust
Final Product
30 0.2
Rotational speed
Feed
Depth of cut
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 231
10- Conclusion:
Defect Analysis:
Number of Defects = 2 units > 1 Rejected Lot size
Defect Ratio = 8.33% Sigma level = 2.932 (D)
Mean = 0.1536 = 0.1569 V% = 0.5%(<3% Excellent)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 233
1- Problem Graph:
Lot Size = N = 1000 unit
Product: Roller Bearing Manufacturing
Single Sample
CTQ (Critical To Quality):
Target Defect 1 unit from 24
Diameter 2.5 0.25 mm
Nominal diameter = 2.5 mm
# M/c #1 M/c #2 M/c #3 M/c #4
Minimum Spec = 2.25 mm
Maximum Spec = 2.75 mm 1 2.45 2.60 2.40 2.80
Number of Defects = 3 units > 1
Rejected Lot size
2 2.35 2.25 2.45 2.65
Defect Ratio = 3/24 = 12.5 %
3 2.40 2.55 2.20 2.50
24
21
4 2.20 2.35 2.30 2.65
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 234
2- Sigma Level:
Sigma Standard Normal Shifted by 1.5
Performance
Level DPPM Yield % DPPM Yield %
1 317,400 68.2600 691,462 30.8538 F
2 45,600 95.4400 308,537 69.1463 D
3 2,700 99.7300 66,807 93.3193 C
4 70 99.9930 6,210 99.3790 B
5 57 99.9943 233 99.9767 A
6 2.0 99.9998 3.4 99.99966 A+
Standard Normal: Practice (Shifted by 1.5)
Defect ratio = 12.5% Defect ratio = 12.5%
= 125000 DPPM = 125000 DPPM
(Goal: 2 DPPM 6 Sigma level) (Goal: 3.4 PPM 6 Sigma level)
Quality yield = 87.5% Quality yield = 87.5%
Z= (1 to 2) = x = 1.7 Z= (2 to 3) = x = 2.76
Z Yield Z Yield
1 68.27 2 69.1463
x 87.5 x 87.5
2 95.45 3 93.3193
Performance: F Performance: D
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 235
3- Normal Dist. Test
Mode = 2.30 & 2.55
Max. value = 2.8 mm
Class Limit Frequency
2.20 2 Min. value = 2.2 mm
2.25 2 Range= 0.6 mm
2.30 3
Number of intervals = 24^.5 = 4.89 = 5
2.35 2
2.40 2 Class = Range / 5 = 0.6/5 = 0.12
2.45 2
2.50 1 Class Class
Frequency Frequency
2.55 3 Limit Limit
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 236
3- Normal Dist. Test LSL = 2.25 USL = 2.75
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 237
4- Variance Analysis:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 238
5- Process Control Chart: Mean = 2.467 = 0.18218
LCL = M - 3 = 1.92 UCL = M + 3 = 3.01
UCL = 3.01
LCL = 1.92
Process in control
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 239
6- Average and range (X-bar R ) charts
X/
X// R/
S(X/) S(R/)
UCL UCL
LCL LCL
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 240
7-Process Capability: Product: Target = 2.5 LSL=2.25 USL= 2.75
Process: Mean = 2.467 = 0.18218
LCL = M - 3 = 1.92 UCL = M + 3 = 3.01
Product:
Process:
UCL = 3.01 UCL > USL & LCL < LSL
USL=2.75
Process is not capable
LSL=2.25
LCL = 1.92
Total Cp = (USL LSL) / 6 = (2.75 - 2.25) / 6* 0.18218 = 0.015
Upper Cpu = (USL x`) / 3 = (2.75 - 2.467) / 3* 0.18218 = 0.017
Lower Cpl = (x` - LSL) / 3 = (2.467 - 2.25) / 3* 0.18218 = 0.013
Process capability index = Lower value (Cp, Cpu, Cpl) = 0.013 <1 (not capable)
This means, the process is not capable to achieve the desired.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 241
8- Check the sample size
= 0.18217
no = (1.96*0.18218/ 0.05) = 50.99
no = (Z * / E)
n = 50.99 * 1000 / (50.99 + (1000-1))
n = no * N / (no+ (N-1)) = 48.5 = 49 units
Target sample size n 49 units
n = 24 < 49 Not Accepted
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 242
9- Process Parameter Diagram:
Ambient temperature
Process: Machining Operator skills
Vibration & dust
Rotational speed
Feed
Depth of cut
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 243
10- Conclusion:
Defect Analysis:
Number of Defects = 3 units > 1 Rejected Lot size
Defect Ratio = 12.5% Sigma level = 2.76 (D)
Mean = 2.467 = 0.18218 V% = 7.28% (>6% Poor)
Control Charts:
Process in control
Process Capability:
Process capability index <1 (not capable)
Normal Distribution Test:
Mode 2.55 < Target 2.50 (Shifted) (Beta Dist.)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 244
Case Study #4
The inspection information for a concrete process is as follows:
Critical To Quality: Concrete Strength; Target 320 Kg/cm2
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 245
1- Problem Graph: Target 320 Kg/cm2
Sample # Pour #1 Pour #2 Pour #3 Pour #4 Pour #5
1 340 360 340 330 320
2 320 320 370 320 340
3 330 330 310 330 330
4 330 340 350 340 350
Accepted 4 4 3 4 4
Rejected 0 0 1 0 0
100%
75%
95%
50%
5%
25%
#1 #2 #3 #4 #5 Total
Accepted % 100 100 75 100 100 95
Rejected % 0 0 25 0 0 5
Sample ( #3 in pour #3) is rejected (310 < 320); So we need to investigate this pour to
determine the root cause. Defect Ratio = 1/20 = 5% Quality Rate = 95%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 246
2- Variance Analysis
Target 320 Kg/cm2 USL = 320 LSL= non limited
Mean (average) = 335 Standard deviation = 14.689
Min. value = 310 Max. value = 370 Range = 370-310 = 60
V % = 100 * Standard deviation / Mean = 100*14.689/ 335 = 4.88 % (Good)
UCL = 379
LCL = 291
Zero points on the mean & 9/20 points above the mean
Process is stable
11/20 points under the mean & Zero points out of control
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 248
6- Average and range (X-bar R ) charts
Sample # Pour #1 Pour #2 Pour #3 Pour #4 Pour #5
1 340 360 340 330 320
2 320 320 370 320 340
3 330 330 310 330 330
4 330 340 350 340 350
X bar 330.00 337.50 342.50 330.00 335.00
Range 20 40 60 20 30
X-D bar = 335 R-bar = 34
Sample size X-chart R-chart
n A2 D3 D4
5 0.58 0 2.11
315.38
In control
71.94
In control
0
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 250
7- Sigma Level:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 251
8- Process capability Process Capability Chart
UCL = 379
Mean= 335
LSL=320
LCL = 291
Cpl = (Mean-LSL) / 3
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 252
9) Process Parameter Diagram:
Ambient temperature
Process: Concrete Operator skills
Concrete Strength;
Target 320 Kg/cm2
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 253
10- Conclusion
Mean is shifted to left
Beta distribution
9/20 points above the mean
11/20 points under the mean
1/20 point is rejected (out of the LSL)
3.1 sigma level
The process is not capable
We should investigate the Pour #3 & Identify RCA
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 254
Case Study #5
A metal-cutting operation has a target value of 100.01 and the
process average is 99.5 with a standard deviation of 0.3.
a) What is the process capability index?
b) How to improve the process capability?
Design Target = 100 USL=101 LSL= 99 Process Capability Chart
Process Mean = 99.5 = 0.3
USL= 101
The mean is shifted to LSL:
UCL = Mean + 3 = 100.4 < USL (101); capable UCL = 100.4
LCL = Mean - 3 = 98.6 < LSL (99); not capable Target= 100
Then; the process is not capable
Mean= 99.5
Cp = (USL LSL) / 6 = 1.11 > 1; capable
LCL = 98.6
Cpl = (Mean-LSL) / 3 = 0.55< 1; not capable
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 255
How to improve the process capability?
etc.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 256
Case Study #6
A company has the following defects while producing 10,000 units:
Total
ID Category
Defect Final Product
A Machine errors 10
B Method errors 12
C Measurement errors 6 8.40.2
D Operator errors 8
E Defective material 16
F Environmental 4
G Management system errors 2
Based on this information:
1. Calculate the defect ratio
2. Analyze the sigma level
3. Construct the Pareto Chart
4. Discuss the Rule 80/20
5. Construct the cause and effect diagram
6. Conclusion
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 257
1- Defect Ratio
N= 10,000 units
Total
ID Category
Defect
A Machine errors 10
B Method errors 12
C Measurement errors 6
D Operator errors 8
E Defective material 16
F Environmental 4
G Management errors 2
Total Defect 58
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 258
2- Sigma Level:
Defect ratio = 1.16% Quality Yield = 98.84 %
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 259
3- Pareto Chart Rule 80/20
Sorting
ID Category Total % C%
E Defective material 16 27.6 28
79 / 57
4- Rule 80/20
79% of the problems defects is controlled by 57% of the root causes.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 260
5- Cause-and-Effect Diagram or Fishbone diagram (Brainstorming)
Inspection Operating
Accuracy Control conditions Type & Storage
Specs
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 263
Case Study #8
A Pipeline project has the following defects while producing 10,000 welding joints:
Crew Crew Crew Crew Crew
ID Defect Description
#1 #2 #3 #4 #5
A Incomplete Joint 2 8 4 3 3
B Improper Fusion 2 1 2 2 1
C Overlap 3 4 2 2 1
D Insufficient Penetration 4 1 3 2 4
E Pits 5 3 4 6 4
F Porosity 6 4 5 7 8
G Vertical Crack 3 1 2 3 1
H Under Bead Crack 2 0 0 3 1
I Irregular Weld 4 0 3 5 4
K Others 1 0 2 1 0
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 269
Case Study #9
The production process consists of the following four processes:
Scrap - - - -
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 270
Material Flow Diagram:
200 C 194 W 192.06 F 190.14 P 188.24
3% 1% 1% 1%
3% 1% 1% 1%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 272
b)
a) (x3)
(x1)
(x2) d) (x4)
c)
a) Low negative correlation between the surface finish & mold pressure
b) High negative correlation the surface finish & cool-down time
c) High positive correlation the surface finish & coolant temperature
d) Low positive correlation the surface finish & squeeze time
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 273
Case Study #11
The quality information for pipe line welding is as follows:
Week Total Number of Week Total Number of
# Joints Rejected # Joints Rejected
1 1000 120 11 1100 120
2 1100 110 12 1200 120
3 1000 100 13 1200 100
4 1200 110 14 1300 120
5 1100 105 15 1300 120
6 1000 100 16 1300 120
7 1100 100 17 1400 130
8 1000 110 18 1400 130
9 1000 120 19 1500 140
10 1100 110 20 1500 140
Based on this information, discuss the following:
1- Frequency Analysis 2- Control Chart
3- Sigma Level 4- Summary report
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 274
Welding Process Week Production Rejected R% Comment
Production rate 1 1000 120 12.0 Max.
2 1100 110 10.0
1000 1500
3 1000 100 10.0
Joint/week 4 1200 110 9.17
Average = 1180 5 1100 105 9.55
6 1000 100 10.0
Rejected ratio
7 1100 100 9.09
8.33 12.00% 8 1000 110 11.0
Average = 9.84 % 9 1000 120 12.0
Range = 12-8.33 = 3.67 10 1100 110 10.0
11 1100 120 10.9
Standard Dev. = 0.943
12 1200 120 10.0
Quality Rate = 100 9.85 13 1200 100 8.33 Min.
= 90.15 % 14 1300 120 9.23
15 1300 120 9.23
1 S 68.27%
16 1300 120 9.23
X 90.15 17 1400 130 9.29
2 S 95.45% 18 1400 130 9.29
3 S 99. 73% 19 1500 140 9.33
20 1500 140 9.33
Sigma Level 1.81
X 1190 116.25 9.84
(without 1.5 S Shift)
S 164.012 12.13 0.943
Sigma Level 2.80 Min 1000 100 8.3
TQM Max Best1500
(with 1.5 S Shift) Quality Engineering 140
Practice Dr. Attia Gomaa - 201612.0 275
Frequency Analysis
Frequency
Class Limit Frequency
7.8-8.5 1 20
8.5-9.2 2 15
9.2-9.9 8
10
9.9-10.6 5
5
10.6-11.3 2
11.3-12.0 2 0
Rejected %
Total = 20 9 10 11 12
Mean
x = 9.85
n
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 276
X = 9.84S=0.943
UCL = x + 3 S = 12.67 LCL = x - 3 S = 7.0
Rejected % Upper Control Limit mean + 3 stdev
Mean
Week
Comment: All the points are within the control limits.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 277
Rejected %
Week
The table below gives the average and range for tensile tests on an
improved plastic product. The subgroups size is 4.
Determine the trial control limits. If any point is out of control, assume
assignable causes and calculate the revised limits.
Sub
group 1 2 3 4 5 6 7 8 9 10 11 12
X\ 462 476 467 484 468 475 489 478 490 488 485 498
R 14 31 14 12 16 14 14 18 44 14 16 15
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 279
X-bar and R charts
n=4 X-D bar = 480 R-bar = 18.5
UCLx-bar = X-D bar + A2 R-bar = 480 + 0.73*18.5 = 493.505
LCLx-bar = X-D bar - A2 R-bar = 480 - 0.73*18.5 = 466.495
UCLR = D4 R-bar = 2.28 * 18.5 = 42.18
LCLR = D3 R-bar = 0
Sub
1 2 3 4 5 6 7 8 9 10 11 12
group
X\ 462 476 467 484 468 475 489 478 490 488 485 498
R 14 31 14 12 16 14 14 18 44 14 16 15
Sub
1 2 3 4 5 6 7 8 9 10 11 12
group
Sub
1 2 3 4 5 6 7 8 9 10 11 12
group
Conclusion:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 281
Case Study #13 Photocopy Defect Analysis
1- Defect Description
Cleanness
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 282
2- Root Cause
ID Defect Description Root Causes
A Horizontal lines
B Vertical lines
C Curved lines
D Rounded dot
E Oval dot
F Irregular dot
G Rounded Circle
H Rectangular
I Clearness
L Cleanness
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 283
3- Check Sheet:
Sample #1
ID Defect Description Slides Total
A Horizontal lines 111-138-174 3
B Vertical lines 172 1
C Curved lines 0
D Rounded dot 123 1
E Oval dot 0
F Irregular dot 95-131-133-152-173-174-281-281 8
G Rounded Circle 73 1
H Rectangular 0
2-4-8-22-24-32-34-35-43-47-48-59-63-64-87-95-112-142-143-144-
I Clearness 146-167-177-186-187-188-189-211-219-240-245-246-247-250-251- 47
252-254-255-258-260-262-265-266-275-335-337-338-
L Cleanness 18-73-213-241- 4
Total 63 65
Defect Ratio 63/338 = 18.6%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 284
4- Check Sheet (Total Samples):
Sample Sample Sample Sample Sample Sample
ID Defect Description Total
#1 #2 #3 #4 #5 #6
A Horizontal lines 3
B Vertical lines 1
C Curved lines 0
D Rounded dot 1
E Oval dot 0
F Irregular dot 8
G Rectangular 1
H Clearness 0
I Cleanness 47
L Rounded Circle 4
Number of Defects 65
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 286
Continuous Process Improvement (CPI) Approaches
Quality Total Quality Long Term Continuous Strategic
Culture Management Improvement Planning
Kaizen is a tool originally used by Toyota to foster continued improvement within its
Toyota Production System (TPS).
It began as "Quality Circles," a means of factory shop floor employees solving quality
issues within a structured team framework,
using specific new tools.
It is now used around the world by many companies and has been adapted to suit their
individual needs and customs.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 288
Kaizen Approach
Change for Respect for
Batter / Good People
HRM
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 290
Brainstorming (Focus Groups):
Problem-solving Approach
Problem: -------------------------------- Team size 93
Report Outline:
1. Problem Definition (What is a Problem?)
2. Teamwork
3. Objectives (Benchmarking, Goals or Targets)
4. Problem Identification (Graph)
5. Root Causes Analysis
6. Recommendations
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 291
Kaizen Tools; for example:
Why-Why Technique (Root Cause Analysis); 1958
Cause-and-Effect Diagram (Fishbone diagram); 1958
5S (Visual Control - Workplace Organization); 1970
PokaYoke (Mistake-Proofing); 1970
Jidoka (Automatic Detection); 1970
etc.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 292
What is Root Cause Analysis (RCA)?
Root Cause Analysis is a systematic approach to get to the true root causes of
the problems.
Problem
5 Whys Method
You Can
Root Cause Control
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 293
Cause-and-Effect Diagram (Fishbone diagram)
A method a work group can use to identify the possible causes of a problem
Failure /
Defect /
Problem
1.
Sort
5. 2.
Sustain
5S Set in order
4. 3.
Standardize Shine
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 295
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 296
5S - Visual Control - Workplace Organization
Brainstorming:
Briefly discuss how to apply 5-S tool in your office.
Before After
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 297
5S - Visual Control - Workplace Organization
Brainstorming:
Briefly discuss how to apply 5-S tool in your store.
Before After
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 298
Before
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 299
After
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 300
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 301
Why good housekeeping?
Safety Productivity
Quality Clean
Environment
Good housekeeping
promotes
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 302
Poka-Yoke (Mistake-Proofing or Error-Proofing)
An approach for mistake-proofing processes
using automatic devices or methods to avoid Shigeo Shingo
simple human or machine error.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 303
Poka-Yoke (Mistake-Proofing or Error-Proofing); Examples:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 304
Process for Mistake Proofing
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 305
Jidoka (Automatic detection - Self working); Examples:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 306
Jidoka (Automatic detection - Self working); Examples:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 307
Jidoka (Automatic detection - Self working); Examples:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 308
What is Six Sigma?
A systematic approach to minimize defects; Defects
Near Zero Defects 3.4 PPM.
Improve Quality!
1987 Motorola
introduced Quality
Program now known
Customer Company/Supplier as Six Sigma.
95.45%
-2 +2
99.73%
-3 +3
Sigma
Yield Defect PDPM
Level
(Quality%) % (1000000)
-4 +4 ( z)
-5 +5
1 Sigma
2 Sigma
3 Sigma
1
2
3
68.27%
95.45%
99.73%
31.73%
4.55%
0.27%
317300
45500
2700
Strategic Objective
-6 +6
99.99966 6 Sigma 6 3.4 zero
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 310
Sources of Process Variability
The outputs (Y) of a process is dependent upon the inputs (Xs) to the process.
Y = f(x)
Process
x1
x3
Materials
Manpower Management
System
x2
Measurement
Machines
Money
Methods Tools
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 311
Normal Distribution Shifted by 1.5
Sigma Level PPM Yield Performance
1 691,462 31% F
2 308,537 69% D
3 66,807 93.3% C
4 6,210 99.3% B
5 233 99.98% A
6 3.4 99.9997% A+
Brainstorming
Total Total DPPM Defects % Yield % Process
Production Defects Sigma Level
1000 25 25000 2.50% 97.50% (3 to 4) 3.70
1200 26 21600 2.16% 97.84% (3 to 4) 3.75
900 24 26666 2.67% 97.33% (3 to 4) 3.67
1100 25 22730 2.27% 97.73% (3 to 4) 3.74
1300 32
1150 50
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 312
Sigma Capability Conversion Table
Yield % DPMO Process Sigma Level
30.85 691500 1.00
40.13 598700 1.25
50.00 500000 1.50
59.87 401300 1.75
69.15 308500 2.00
77.34 226600 2.25
84.13 158700 2.50
89.44 105600 2.75
93.32 66800 3.00
95.99 40100 3.25
97.73 22700 3.50
98.78 12200 3.75
99.38 6200 4.00
99.70 3000 4.25
99.87 1300 4.50
99.94 600 4.75
99.977 230 5.00
99.987 130 5.25
99.997 30 5.50
99.99833 16.7 5.75
99.99966 3.4 6.00
Yield Quality rate DPMO Defects Per Million Opportunities
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 313
Example Sigma Levels
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 314
Six Sigma Methodology
Focus on the customer (Critical To Customer)
Focus on the data (Data driven approach)
Focus on the process (Process-driven approach)
Proactive (What If Analysis)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 315
The process includes models for manufacturing, design and
administrative services
DMAIC
DMADV
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 316
Six Sigma (D-M-A-I-C) Cycle (Roadmap)
Define Measure Analyze Improve Control
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 317
Define: Process: Machining Process
Monthly Production:
Customer Requirements: Total Production = 10,000 units
Final Product weight = Total Defects = 58 units
Defect Ration = 58/10000 = 0.58 %
Target Defect Ratio 0.2%
8.40.2
Total Raw Material weight =
Material Yield = %
Standards / Reference:
Defect List:
ID Category Teamwork
A Machine errors Quality Leader (Facilitator)
B Method errors Production Engineer
C Measurement errors Machining Crew
D Operator errors
KPIs Selection:
E Defective material Sigma Level
F Environmental Process Capability
G Management system errors Coefficient of Variation (V%)
Material Scrape (%)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 318
Measure: Information Plan Lot Size = N = 1000 unit
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 322
Control:
KPIs Calculations:
Sigma Level
Process Capability
Coefficient of Variation (V%)
Material Scrape (%)
Corrective Actions:
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 323
Width of landing
strip 1/2 Width
of landing
strip
25
50
500.2 mm
USL = 50.2
Mean 6 Sigma
Mean = 50.0 Target:
Mean = 50.0
6 Sigma = 0.2
Sigma = 0.2 /6 = 0.033
Inputs ??????
LSL = 49.8
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 325
Target Design For 6 Sigma Process Cap. = 2
USL = 50.2
6 S = 0.20
Mean = 50.0 6 S = 0.2 S=0.033
LCL = 49.9
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 326
Six Sigma Project Participants
Green Belts
training
Black Belts
extensive training
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 327
What is Lean?
A systematic approach to minimize the waste in process
Lean is about understanding what is important to the customer
Lean
Customer Company/Supplier
Lean: A principle driven, tool based philosophy that focuses on
eliminating waste so that all activities/steps add value
from the customers perspective.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 328
Lean Approach:
It based on eliminating of the main seven wasters (Non-value-Added Activities).
Overproduction
1
1 Waiting
Unnecessary
movement 7 2
7 2
WASTE
Rework 6
6 3
3 Transportation
5
5 4
4
Inventory
Over-processing
Overproduction
Transportation
Processing
Inventory
Defects
Waiting
Motion
# Observation
1
One Day Site Visit
2
3
Measure Value
4 Main Wastes
5 Information Plan (standard forms)
6
Information Collection
Sources; etc.
7
Main Comments:
1.
2.
3.
4.
5.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 331
Lean Methodology
Define Define
Value
Measure Measure
Value
Analyze Analyze
Process - Flow
Improve Improve
Process - Pull
Control
Process
Control
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 332
Lean - D-M-A-I-C Cycle (Roadmap)
Define Measure Analyze Improve Control
Improvement Plans:
Short term (weekly, monthly, quarter)
Information Plan Medium tem (6 monthly, annual)
Standard Forms Long term (2 to 5 years)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 333
History and Philosophy of Lean
Lean production is the name given to the Toyota Production System (TPS)
Toyota Production System (TPS)
Best Quality - Lowest Cost - Shortest Lead Time
Through Eliminating Waste
Standardized Work
Operational Stability Robust Products & Processes
Total Productive Maintenance Supplier Involvement
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 334
Customer
Value Stream
Value
Work Processes
Normal Abnormal
Necessary Unnecessary
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 336
Activities Classification
Value- and Non-value-Added Activities
Focus on reduction
Waste
(Non- Value Added Value Added
& not necessary)
Non- Value Added,
but necessary
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 337
Activities Classification
Value Added
Any activity or operation performed that helps transform a product or service
from its raw state into its finished form.
Completed right the first time.
Any activity customer is prepared to pay for. Activity required to ensure that
a product or service is delivered in conformance to specification.
Non-Value Added
Any activity that doesnt help to transform a product or service into its final
form. Activity not performed right. Activity customer not willing to pay for.
This includes:
Unnecessary process steps
Movement of inventory, paperwork, etc.
Re-work, corrections, etc.
Storage between operations, batching inventory
Wait times, delay times, idle times
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 338
Process: Spare Part Manufacturing
# Activity Time Value add Non value add
1 Work Order Preparation 1 hour 1 hour
2 Material Receipt 1 hour 1 hour
3 Material Inspect 30 min. 30 min.
4 Material Handling 30 min. 30 min.
5 Machine startup 30 min. 30 min.
6 Machining Process 1 hour 1 hour
7 Inspection 30 min. 30 min.
8 Finishing Process 1 hour 1 hour
9 Inspection 30 min. 30 min.
10 Material Handling 30 min. 30 min.
11 Work Order Close-Out 30 min. 30 min.
Total 7.5 hours 2 hours 5.5 hours
Ratio 100 % 26.7 % 73.3 %
1 2 3 4 5 7 9 10 11
6 8
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 339
Value Stream Map Symbols 3,000 units
C/T = 30 sec
Supermarket
Push
Manual
Information
Flow Electronic
Information Flow
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 340
Value Stream Mapping
Understanding concepts of cycle time and value added time lead to improvement.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 341
Process Plan:
Process plan defines the key steps & stages which must be takes to achieve
the target process.
Process Map
SIPOC & Measurement Instruments
Requirements Requirements Requirements
S I P O C
Suppliers Inputs Process Outputs Customers
Measures Measures
Measures
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 342
Process Map (SIPOC Chart)
Quality Control
Receive Shop drawings
Submittal to
W/O & Drawings
the Engineer
Drawings Checking
for Approval
Quantity Completion of
Survey the W/o
Elements
Detailed Procurement of
Planning Resources Execution
of Works
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 343
Kanban
Part numbers
mark location
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 344
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 345
Total Productive Maintenance, Japanese concept, 1951
TPM is a Lean tool to optimize the effectiveness of
manufacturing equipment and tooling.
TPM is a Lean tool for Quality and Productivity
TPM Goals: Zero Losses
Vision: Total life cycle ZERO breakdowns
equipment management ZERO defects
ZERO speed losses
ZERO accidents
TPM in three words,
Total All individuals in the organization working together.
Productive Production of products that meet or exceed
customers expectations.
Maintenance Keeping equipment and plant in good condition
at all times.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 346
Process Time Analysis
Non-Productive Time
Time Losses
Planned Quality
downtime
Speed losses
Unplanned
(t1) losses
downtime Waiting (t5)
(t2) time (t4)
(t3)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 347
Process Time Analysis
Total (calendar) time (T0)
A
Planned (target) time (T1) t1
R
Available time (T2) t2
U
Operating (used) time (T3) t3
PE
Net operating time or uptime (T4) t4
EP QR
Productive time (T5) t5
QR= Quality rate = T5/T4 TEP= Total Equipment Productivity = T5/T0 > 80%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 348
R >= A Process Time Analysis
Total (calendar) time (T0) = 8760
A= 97% t1= 160
Planned (target) time (T1) = 8600
R=98.8% PM
t2=100
Available time (T2)=8500
CM
U
Operating (used) time (T3)=8000 t3=500
Standby
PE t4=2000
Net operating time or uptime (T4)=6000
Speed
EP QR
Productive time (T5)= 5540 t5=60
Defect
Non-productive time (TL)
Total time losses
A= Availability = T2/T0 R= Reliability = T2/T1
QR= Quality rate = T5/T4 TEP= Total Equipment Productivity = T5/T0 > 80%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 349
Overall Equipment Effectiveness (OEE)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 350
Case Study
Process: Excavation Equipment: Excavator
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 351
Case Study: Current Situation Analysis: Process: Spare Parts Manufacturing
Time Number of
# Activity Top 3 Comments / Problems (Rule 80/20)
(hour) Workers
1 Product Order 1 1 Incomplete specs Lack of info. Lack of control
2 Material Order 1 1 Incomplete specs Lack of info. Lack of control
3 Waiting Materials 1 - Material shortage Delivery late Lack of control
4 Material Receiving 1 1 Material defect Unsafe Delivery late
5 Material Handling to Process A 1 1 Low speed Unsafe Heavy work load
6 Process A (standard time) 4 (3) 2 Unskilled labor High WIP Low productivity
7 Material Handling to Process B 1 1 Low speed High noise Heavy work load
8 Process B (standard time) 3 (2) 2 Unskilled labor High WIP Low productivity
9 Process B Downtime 1 1 Machine failure Lack of PM w/o Lack of info.
10 Material Handling to Process C 1 1 Low speed High Noise Heavy work load
11 Process C (standard time) 2 (2) 2 High WIP Process Defect Lack of plan
12 Defect Repair 1 1 Lack of QA/QC Time pressure Lack of control
13 Final Product Handling to Store 1 1 Low speed High noise Heavy work load
14 Final Product Inventory 1 1 Delivery late Lack of control House keeping
Total (Product Lead Time Customer wise) 20
Production: Critical Material(s): General Comments:
Production Lead Time = 14 hour Material Type: Steel - Lack of information; planning; control
Total Production Quantity= 6 units Raw Material Quantity = 1000 kg - Unsafe Conditions (Near-miss)
Defective Quantity= 1 unit Final Product Quantity = 750 kg - High Work In Process (WIP)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 352
Current Situation Analysis:
Value Added Time Analysis
Time Target
# Activity Value Non- Value
(hour) Waste Time
Added Added
1 Product Order 1 1 0.5
2 Material Order 1 1 0.5
3 Waiting Materials 1 1 0
4 Material Receiving 1 1 0.5
5 Material Handling to Process A 1 1 0.5
6 Process A (standard time) 4 (3) 4 3
7 Material Handling to Process B 1 1 0.5
8 Process B (standard time) 3 (2) 3 2
9 Process B Downtime 1 1 0
10 Material Handling to Process C 1 1 0.5
11 Process C (standard time) 2 (2) 2 2
12 Defect Repair 1 1 0
13 Product Handling to Store 1 1 0.5
14 Final Product Inventory 1 1 0.5
Total Time 20 9 8 3 11
% 100 45 40 15 55%
For Safety Critical Items Safety Risk Wise Time Reduction 20%
Target:
Eliminate the waste time & minimize the non-value added time by 50%
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 353
Value Stream Mapping One Page
Management
Current State Target State
Information Flow
Supplier Customer
Abnormalities Abnormalities
Material Flow
Time Analysis
Value
Added
Analysis 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 hours
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 355
Value Stream Mapping - Current State Top Comments / Problems
Specs
Shortage
Specs
Shipping
Process Plan
1 hour
WIP
Safety
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 356
Process Flow Chart (Material Flow Chart): (Indoor)
Defect
Repair
1 hour
Standard Process A Process B Process C
plates 4 hour 3 hour 2 hour
2 workers 2 workers 2 workers
1 hour 1 hour
Process B
1 hour 1 hour
Symbols: Downtime
1 hour Final
Operations
1 hour Products
Inspection Product Description: Store
xxxxx
Transportation
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 357
Recommendations:
# Activity Main Recommendations (Soft Skills) Very Short Term
1 Product Order Standard Information (specs)
2 Material Order Standard Information (specs)
3 Waiting Materials Inventory Control Policy
4 Material Receiving QA / QC Check list
5 Material Handling to Process A Preventive Maintenance Program
6 Process A Method of Work; QA / QC Check list, Training Plan
7 Material Handling to Process B Preventive Maintenance Program
8 Process B Method of Work; QA / QC Check list, Training Plan
9 Process B Downtime Preventive Maintenance Program
10 Material Handling to Process C Preventive Maintenance Program
11 Process C Method of Work; QA / QC Check list, Training Plan
12 Defect Repair QA / QC Check list
13 Product Handling to Store Preventive Maintenance Program
14 Final Product Inventory QA / QC Check list
Conclusion:
1. Standard Information (Specs, time rates, etc)
2. Method of Work for all process
3. Advanced Training Plan Teamwork
4. QA / QC (Quality Assurance / Quality Control) Check list for material receiving and processes
5. Preventive Maintenance Program for all equipment
6. Safety Awareness Program Improvement Plan:
7. Motivation Program Task Specs Responsibility Duration Dates Resources
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 358
Target plan for the next period: Process: Product Manufacturing
Target Actual Number
# Activity Time Time of Top 3 Comments / Problems
(hour) (hour) Workers
1 Product Order 0.5
2 Material Order 0.5
4 Material Receiving 0.5
5 Material Handling to Process A 0.5
6 Process A (standard time) 3.0
7 Material Handling to Process B 0.5
8 Process B (standard time) 2.0
9 Material Handling to Process C 0.5
10 Process C (standard time) 2.0
11 Product Handling to Store 0.5
12 Final Product Inventory 0.5
Total 11
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 359
Lean Six Sigma
Lean tools and techniques are used to standardize work and remove
waste and non value-added activities.
Six Sigma tools and techniques are used to attack the variation present in
processes.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 360
Lean and Six Sigma
Lean = Rapid Improvement Teams focused on dramatically improving
process speed, and the elimination of the eight deadly wastes.
IMPROVE
Define Measure Analyze Improve Control
Problem Problem Process Process Process EFFECTIVENESS
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 361
What is Lean Six Sigma?
DMAIC (Define-Measure-Analysis-Improve-Control)
Lean Value Value Added Time, etc.?
Analyze
Improve
Define Measure Improve Control
Process-
Value Value Value Process
Flow Efficiency
&
Control
Effectiveness
Define Measure Analyze Improve
Problem Problem Process Process Process
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 362
Lean Six Sigma - D-M-A-I-C Cycle (Roadmap)
Define Measure Analyze Improve Control
Improvement Plans:
Short term (weekly, monthly, quarter)
Information Plan Medium tem (6 monthly, annual)
Standard Forms Long term (2 to 5 years)
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 363
The Theory of Constraints
A systematic way to view and analyze process flows.
Key aspects of the theory of constraints (TOC) include
identifying the bottlenecks in the process and balancing the
work flows in the system.
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 365
References
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 366
References
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 367
References
George, Michael. (2002). Lean Six Sigma: Combining Six Sigma Quality with Lean
Speed, New York: McGraw-Hill.
Rother, M. and Shook, J. (2003). Learning to See: Value Stream Mapping to
Create Value and Eliminate Muda, Brrookline, MA: The Lean Institute.
Pande, P, Neuman,R.P., and Cavanagh,R.R. (2000). The Six Sigma Way, New
York:McGraw Hill.
Bossert , James. ( July 2003) Lean and Six Sigma--Synergy Made in Heaven
Quality Progress.
Goldratt, Eliyahu M., (1994). The Goal: A Process of Ongoing Improvement,
second edition. Great Barrington, MA: North River Press.
Womack, James P. and Daniel T. Jones. (2003). Lean Thinking: Banish Waste
and Create Wealth in Your Corporation. New York: Simon & Schuster.
Also...you might consider:
www.6-sigma.com
www.sixsigma.co.uk
www.sixsigmasystems.com
www.isixsigma.com
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 368
Made in Egypt -
-
TQM Quality Engineering Best Practice Dr. Attia Gomaa - 2016 369
Thank you for your attention! Useful Science For
the Sake of Allah
Suggestions Comments
"
)32 (
Questions