Item No. Activity Description Frequency Acceptance Criteria Verifying Document / Report
Activity Reference SUB-CON CONT ITL ENGINEER
1 Material Approval
A33 Quality
Before site Standards and
AUTO TRANSFER SWITCH Approved Material Submittal
1.1 Submit to the Engineer execution of the ENGINEER Approval Control,170.005 R R - R/A
PANEL Form
activity Standard and
Regulation
2 Drawing Submittal
Part A, A31
Before site
Ayto Transfer Switch Schematic Provision,Content Approved Shop Drawings
2.1 Submit to the Engineer execution of the Workmanlike. ENGINEER Approval R R -- R/A
Diagram and use of Submittal Form
activity
Documents
3 Method Statement
Part B, Section
V11/12/20
Before site
Method Statement for Installation Clauses Y71
3.1 Submit to the Engineer execution of the Workmanlike. ENGINEER Approval R R -- R/A Approved Method Statement
Auto Transfer Switch Panel Section V20
activity
300.275
Part B, Section
V11/12/20
Visual Inspection for damages Every Delivery Proper identification, same as specification,
AUTO TRANSFER SWITCH Clauses Y71 Material Inspection Check
4.1 and appearance. Inspection and movement of finish and packing. Storage and protection as H S -- S
PANEL Section V20 sheet
for dimensions' verification material per manufacturers recommendation
300.275
Page 1 of 2
ITP Reference
Number:AFISR/MEP/E/022
Inspection Points
Inspection and Test Specification
Item No. Activity Description Frequency Acceptance Criteria Verifying Document / Report
Activity Reference SUB-CON CONT ITL ENGINEER
5 Installation
Part B, Section
V11/12/20
AUTO TRANSFER SWITCH Inspection for the proper For each floor Installation is as per the approved method Clauses Y71
5.1 H H - A Quality Check Sheet
PANEL installation of Earthing system level statement Section V20