Project No.

Date

AN9766 3-Oct-17
DESIGN CALCULATION SHEET
Sheet No. Computed by

of -- A. HASHEM

Checked by Approved by
Subject Luanda Water Treatment Plant
A. Shedid _
Corbel Design
Building
DESIGN OF CORBELS AND BRACKETS ACCORDING TO ACI 318 - 99
SECTION ID Inlet Channel Support
bearing plate As
Material Properties (Main Reinf.)
Concrete Cylinder Strength (f 'C) = 351.55 Kg/Cm2 Vu a
Steel Yield Stress (fY) = 4219 Kg/Cm2 Nuc

Section Properties h'


Breadth of Section (b) = 35.56 Cm
anchor
bar 2/3 d
Total Thickness (h) = 30.48 Cm h d
Depth of Section (d) = 27.94 Cm
Edge Thickness (h') = 20.00 Cm
Load distanse from face of support (a) = 7.62 Cm Ah
Closed Stirrups
a/d = 0.27 < 1
Straining Actions
Ultimate Vertical Force (Vu) = 44.18 t
Ultimate Normal Force (Nuc) = 15.42 t (Min. = 0.20 Vu = 8.84 t) ACI - 11.9.3.4
Ultimate Moment (MU) = 3.76 m. t ACI - 11.9.3
Shear Strength (Vn) = 47.50 t ACI - 11.9.3.2.1

Reinforcement Calculations
Reinforcement for Flexure (A f) = 3.64 Cm2
Reinforcement for Normal force (A n) = 4.32 Cm2 ACI - 11.9.3.4
Reinforcement for Shear Friction (Avf) = 8.84 Cm 2
ACI - 11.7.4.1, Eqn. (11-25)
Main Reinforcement (A s) = 10.21 Cm2 ACI - 11.9.3.5 & 11.9.5
Total Area of Stirrups (A h) = 2.95 Cm 2
ACI - 11.9.4

Reinforcement Size
As = 6 F 16 = 12.06 Cm2

Ah = 1 Set of closed Stirrups, 1 Row of F 16


= ( 2 ) Legs x ( 1 ) Rows x F 16 = 4.02 Cm2 > 2.95 O.K.

Anchorage Details
Apply one of the following anchorage method to (As) Reinforcement.
Loaded
area 4 db

tw = 3/4 db
tw = db /2 Loaded
Area
As
D= 6 db
As Straight
db
4 db Bent

a - Cross bar weld b - Horiz. Loop bar c - Vert. Loop bar

09:00:47 Page 1 of 2 367616302.xlsx Rev. 0


a - Cross bar weld b - Horiz. Loop bar c - Vert. Loop bar

09:00:47 Page 2 of 2 367616302.xlsx Rev. 0

You might also like