Data Sheet Whr Parkbox 401

dependent parking
For permanent use only!*

* In case of short time user


(e.g. for office-, hotel-,
commercial building) only
possible on lower platform
and only if technically
adjusted, ask WHR!
Or with attendant or valet
parking both levels are
possible for short time user.
Load per platform
max. 2000 kg 290 +30
(load per wheel 500 kg)

Dimensions in cm
155

min. 300 cm horizontal


max. slope 10%

min.18
Please attend to restricted car- 70
and platform distance height!
500

305 315

155
170

min. 18 min.18
70 70
530 500

280 260 220


(280)
155

min. 18
100 hydraulic power pack
585
Parklift 401 | 05.2016 | C027-4302 | Otto Whr GmbH

Notes
1. According to the examples shown above the required height and length dimensions depend on the car size and parking
direction (frontwards/reverse).
2. Clear platform width of 220 cm for car widths of 190 cm. Installation width 260 cm (forwards), installation width 280 cm
(forwards and reverse parking).
3. According to ISO 3864 the floor has to be marked with 10 cm wide yellow-black stripes at a distance of 90 cm from the platform
edge by the purchaser (see statics and construction requirements on page 2).
4. It is not possible to have channels or undercuts and/or concrete haunches along the floor-to-wall joints. In the event that channels
or undercuts are necessary, the system width needs to be reduced or the installation width needs to be wider.
5. The manufacturer reserves the right to construction or model modifications and/or alterations. Furthermore, the right to any subsequent part
modification and/or variations and amendments in procedures and standards due to technical and engineering progresses in the art or due to
environmental regulation changes, are also hereby reserved.

Otto Whr GmbH lgrabenstrasse 14 Fon +49 [0] 7044 46 -0 www.woehr.de


01 Auto-Parksysteme 71292 Friolzheim | Germany Fax +49 [0] 7044 46 -149 info@woehr.de We compact parking space
Electrical datas Installation diagram
Item Performance Quantity Designation Position Frequency
1 Electric
1 by customer 1 unit electric meter in the feed cable 2 Fuse or automatic circuit breaker
3 x16 A slow blow according to
2 by customer 1 unit fuse or automatic circuit in the feed cable 1 per DIN VDE 0100 part 430 7 PVC control cable 5 x 1.52
breaker 3 x16A slow blow power pack from main switch to
acc. to DIN VDE 0100 p. 430 3 Feed line to the main switch
assembly
6 Lockable main switch
3 by customer as locally acc. to local power supply feed cable to 1 per 11 PVC control cable 3 x1.5 2
required regulations main switch power pack from branch connector
3 Ph + N + PE* to unlock magnet
4 by customer each equipotential bonding sa- corner pit floor/ 14 Unlock magnet
8 Hydraulic unit with three-phase
10 m fety lead-out connection rear wall motor, 230/400V, 50 Hz,
5 by customer 1 unit equipotential bonding sa- from the lead-out 1 per 10 Branch 1.5 kW. Switching cabinet
fety compliant to the connection to the Parklift connector with motor, protection, wired
already for installation
DIN EN 60204 standard system
4 Equipotential bonding safety
6 by customer 1 unit marked main switch, above operating 1 per lead-out connection
lockable to prevent device power pack
12 PVC Steuerleitung 5 Equipotential bonding safety
unauthorized switching on
5 x1.5 2 von Abzweig- from the lead-out connection
7 by customer 10 m PVC control cable with from main switch 1 per dose zum Drehtaster to the system
marked strands and pro- to hydraulic power power pack
13 Operating device for UP/DOWN 9 PVC control cable 5 x1.5 2 from
tective conductor 5 x 1,5 2 pack with EMERGENCY-STOP. If assembly to branch connector
Items 816 are included in Whrs scope of delivery unless otherwise specified in the possible on the left, but always
outside the platforms movement 15 Cylinder valve
offer/order.
range. Cables always feed in 16 PVC control cable 3 x1.5 2 from
* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE from below. (2 keys per parking place.) branch connector to valve
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.
The electrical components enable our fitters to complete
Maintenance
suppliedbythemanufacturer their work satisfactorily and to Regular maintenance by qualified personnel can be provided by means
must be connected in accord- check the correct functioning of an Annual Service Contract.
ance with the appropriate wiring of the units.
diagram and local regulations. In compliance with the DIN EN
German VDE electrical require- 60204 standard provisions, all
Protection against corrosion
ments must be adhered to, in systems must be connected Independent of a maintenance workings has to be carried out acc. to
order to validate the TV tested directly on site with an earthed Whr Cleaning and Maintenance Instruction regularly.
circuit. equipotential bonding. The lead- Clean up galvanized parts and platforms of dirt and road salt as well
The electrical supply to the out connection must be at a as other pollution (corrosion danger)!
power pack(s) must be provided 10 m distance!
prior to or during installation to Pit must be always ventilated and dearated well.

Noise protection Statics and construction requirements


Basis is the German DIN 4109 At differing constructional
Noise protection in buildings. conditions additional sound
With the following conditions absorbing measures are
required 30 dB (A) in rooms necessary.
can be provided: The best results are reached
noise protection package by separated sole plates from
, 6%

from our accessory the construction.


=5

insulation figure of the Increased noise protection:


4

construction of min. Rw = 57dB If increased noise protection


3,2

walls which are bordering must be provided planning has


the parking systems must be to be confirmed on a project
done as single wall and basis by Whr (further building
deflection resistant with min. measures are required).

Parklift 401 | 05.2016 | C027-4302 | Otto Whr GmbH | Vehicle drawings creativ collection Verlag GmbH/www.ccvision.de
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2 x = 70: small and
middle sized
cars
Temperature 155
(170) x = 100: big sized
The installation is designed to operate between +5and +40C. P1 P2 cars e.g.
Atmospheric Humidity: 50% at +40C. If the local circumstances BMW series 7
differ from the above please contact Whr.
220 x
Conformity test 5
All our systems are checked according to EC machinery directive Marking according to ISO 3864
2006/42/EC and EN 14010.
P1 = 12 kN*
P1 P2 P2 = 4 kN
Dimensions
All dimensions shown are minimum. Construction tolerances must 238 *all static
be taken into consideration. All dimensions in cm. 220 loadings
include the
weight of
Railings the car
P1 P2
If walkways are arranged directly to the side or behind the systems,
railings have to be provided acc. EN ISO 13857 by client acc. to local 90
requirements, height min. 200cm.

Fire safety The Parkbox will be fixed on the anchor points with heavy duty
Each and every fire safety requirement and all possible mandatory item(s) anchor bolts to a depth of approx. 1012cm.
and equipment(s) (fire extinguishing systems and fire alarm systems, etc.) Slab thickness min. 18cm. Concrete quality according to the static
are to be provided by the customer. requirements of the building, but for the dowel fastening we require
a concrete quality of min. C20/25.
Notes Special foundations are required with asphalt floors or paving-stones.
In case of lower cars with spoilers, sontact Company Whr or local agent.

02