You are on page 1of 6

CURRICULUM VITAE

Raja Umar Khan


Mobile : (+966) 508-865-483

Email : umarkhan78628@yahoo.com

Objective:
A pragmatic confident and professional Civil Engineer with a structured motivational
approach. Excellent engineering knowledge and command with the ability of problem solving
skills, recognizing the requirements for success and driving out dependencies and risks that
pose threats to successful delivery with SEVEN YEARS extensive experience in roads, bridges
and building construction. Working with large group of construction companies and can serve
the resource group in a challenging and dynamic environment towards a successful career. My
vision is ZERO tolerance towards accident and property damages and working with many
different group workers in the working place such as from Saudi, India, Pakistan, Nepal,
China, Sudan, Srilanka, Bangdalesh, Indonesia and Europe. Easy to sharing and
comunicate safety knowledge in English, Urdu, Hindi and Punjabi languages.

Academic Qualifications

B-Tech (Hons) Civil: (2012-2014)


B-Tech (Pass) Civil: (2009-2011)
DAE Civil Technology Diploma in the year (2005-2009)
Finish High School Education, Lahore, Pakistan (2003-2005)

Computer Proficiency

Graphic Designing in:


Adobe Photo Shop.
3D Max.
Coral Draw.
Auto CAD:
2D Drawing.
Commercial Drawing.
Cross Sectioning.
Conversion from 2D to 3D.
Computer literate:
General office duties, Internet use, MS Word, MS Excel, MS Power Point internet & E-mailing.

Key Strengths/Skills

Strong goal-oriented team player, able to meet the deadlines as per assignment.
Ability to work independently under demanding conditions.
Tend to learn more in practical environment.
Good communication skills.

1|Page
Languages Skills

Urdu Expert
Punjabi Expert
English Working proficiency
Arabic Beginner

Professional Experiences
1- Working with Waseem Naseem Abdul Majeed Hassan General Contracting Establishment

Position: Site Supervision Officer


Location of Assignment: Jaizan & Turaif
Duration: 15 May 2016 to till Date

Major Duties & Responsible for:

Inspect project sites to monitor progress and ensure conformance to design specifications.
Maintaining an up to date technical knowledge of design, drafting, and project standards and
techniques.
Engaged in calculation of quantities and cost estimate.
Arranging Skilled and unskilled labor for different construction works.
Preparation of cost estimates of Physical Infrastructure schemes
Writing reports on and advising on building and maintenance costs
Identifying efficiency and cost savings.

2- Working with Medical Transcription Billing Company (MTBC).

Position: Construction Manager


Location of Assignment: MTBC Office Bagh, Azad Kashmir
Duration: 28 January 2015 to 10 April 2016.

Major Duties & Responsible for:

Working as Construction Manager on above mentioned Project.


Layout of Building extension.
Inspect project sites to monitor progress and ensure conformance to design specifications.
Providing fit for purpose engineering solutions.
Undertaking appropriate research and investigation into any design modifications / improvements.
Maintaining an up to date technical knowledge of design, drafting, and project standards and
techniques.
Engaged in calculation of quantities and cost estimate.
Arranging Skilled and unskilled labor for different construction works.

2|Page
3- Working with Tahir Khan Builders and Developer

Position: Sub Engineer


Location of Assignment: Bagh Buildings, Roads & Sanitation Project
Duration: 28 October 2011 to 31 December 2014.

Major Duties & Responsible for:

Working as Sub Engineer on above mentioned Projects.


Layout of Building.
Inspect project sites to monitor progress and ensure conformance to design specifications.
Providing fit for purpose engineering solutions for complex projects.
Undertaking appropriate research and investigation into any design modifications / improvements.
Maintaining an up to date technical knowledge of design, drafting, and project standards and
techniques.
Engaged in calculation of quantities and cost estimate.
Supervision of ongoing work according to the specifications and drawings approved from ERRA.
Preparation of cost estimates of Physical Infrastructure schemes

4- Working with National Engineering Services Pakistan (Pvt) Ltd.


Position: Site Inspector
Location of Assignment: Ring Road Project Lahore on Package 9.
Duration: 17 January 2011 to 30 September 2011.

Major Duties& Responsible:

Assisting Quantity Surveyor on Lahore Ring Road Project (Package 09).


Working as part of a busy team, taking responsibility for several projects at differing Stages and
working with limited supervision. The workload includes new highway projects and refurbishment
projects.
Responsible for managing all project costs from pitch to completion.
Undertaking costs analysis for projects.
Monitoring the cost of site resources.
Inspecting and then valuing completed work.
Working on a number of build projects at any one time.
Writing reports on and advising on building and maintenance costs.
Preparing tender and contract documents.
Developing strong relationships with the clients and sub-contractors.
Providing advice and guidance to staff in the preparation and presentation of works
Proposals, reviews and updates.
5- Working with Pak Shahid Developers (Pvt) Ltd.

Position: Sub Engineer


Location of Assignment: DHA Phase 5, Aashyana Housing scheme and NCA College,
Duration: 01 August 2010 to 30 December 2010.

Major Duties & Responsible for

Working as Sub Engineer on above mentioned Projects.


Layout of Building.
Inspect project sites to monitor progress and ensure conformance to design specifications.
Providing fit for purpose engineering solutions for complex projects.
3|Page
Undertaking appropriate research and investigation into any design modifications / improvements.
Maintaining an up to date technical knowledge of design, drafting, and project standards and
techniques.

6- Working with National Engineering Services Pakistan (Pvt) Ltd.

Position: Site Inspector


Location of Assignment: Ring Road Project Lahore on Package 7.
Duration: 01 September 2009 to 15 July 2010.

Major Duties & Responsible for

Assisting Site Engineer on Lahore Ring Road Project (Package 07).


Supervision of Construction of Bridge including Piles, Piers, Transoms, Deck Slab & Barrier.
Supervision of Construction of Drainage system of the project.
Supervision of Construction of Abutment & Wing Walls of Bridges including Reinforced Earth Panels &
Columns.
Supervision of Different Highway activities including Sub-Grade, Sub-Base, Base (Aggregate + Asphalt) & Aspha
Base Course.
Supervise the concreting, Stressing, Grouting of Girders

7- Working with Habib Construction Services (Pvt) Ltd.


Position: Site Inspector
Location of Assignment: Ring Road Project Lahore on Package 7.
Duration: 14 March 2009 to 28 August 2009.

Major Duties & Responsible for

Working as Site Engineer on Lahore Ring Road Project (Package 07).


Supervision of Construction of Bridge including Piles, Piers, Transoms, Deck Slab & Barrier.
Supervision of Construction of Drainage system of the project.
Supervision of Construction of Abutment & Wing Walls of Bridges including Reinforced Earth Panels &
Columns.
Supervision of Different Highway activities including Sub-Grade, Sub-Base, Base
Supervise the concreting, Stressing, Grouting of Girders.

Civil Engineering skills

Awareness of contract conditions and the importance of contracts in project delivery.


Detailed knowledge of civil design principles and standards.
A detailed knowledge of AutoCAD.
Droughting, calculation, analysis and measurement knowledge.
Negotiating with Statutory Authorities for the provision of main services.
Identifying efficiency and cost savings.

4|Page
Personal Information

Name: Raja Umar Khan.


Nationality: Pakistani.
Residential / Iqama No: 2413045341 (Transferable)
Profession: General Surveyor
Employer: Waseem Naseem Abdul Majeed Hassan Gen. Cont. Est.
Address in Saudi Arabia: House #: 8037, Street: Abu Hadriyah, Cross #: 16/17 (Al-Touqbah) KSA.
Permanent Address in Pakistan: House #: 5, Street No: 13, Main Bazar Muslimabad, Mughal Pura, Lahore, Pakistan.
Date of Birth: April 02, 1989
Marital Status: Single.
Religion: Islam.
Driving License: Pakistani.

References:

Available on Demand.

5|Page
6|Page

You might also like