The inspection report summarizes the results of a sieve analysis test conducted on a sample of coarse aggregate. The test was commissioned by IOCL Refinery in Paradeep and conducted by Artson Engineering Ltd. for a crude oil storage tank project. The report documents the sieving process and percentages of the aggregate sample retained or passing through various sieve sizes.
The inspection report summarizes the results of a sieve analysis test conducted on a sample of coarse aggregate. The test was commissioned by IOCL Refinery in Paradeep and conducted by Artson Engineering Ltd. for a crude oil storage tank project. The report documents the sieving process and percentages of the aggregate sample retained or passing through various sieve sizes.
The inspection report summarizes the results of a sieve analysis test conducted on a sample of coarse aggregate. The test was commissioned by IOCL Refinery in Paradeep and conducted by Artson Engineering Ltd. for a crude oil storage tank project. The report documents the sieving process and percentages of the aggregate sample retained or passing through various sieve sizes.
Doc no :AEL/Q/CW/002 REV-00 INSPECTION REPORT FOR COARSE AGGREGATE SIEVE ANALYSIS. Report No. Date of sampling Location Date of testing. Tank No Drawing No
% WEIGHT CUMULATIVE % CUMULATIVE GRADING ZONE
WEIGHT RETAINED RETAINED % PASSING IS SIEVE SIZE RETAINED % PASSING REMARKS (gms) (gms) As Per (gms) (gms) IS 383-1970 80 MM
The Construction, Commissioning and Maintenance of Infrastructure Works For Electrified Double Track Project Between Seremban and Gemas - Package Ii (KM 502.600 - KM 535.500)