STANDARD OPERATING PROCEDURE Drawing Rev. No & Date: C & 28 Nov 2011
SOP No: LI / SOP / PRV / 03
SOP Revision No & Date: 0 & 16 Mar 16
Operation Number & Name of Operation:- 60 & Turning Name of the Machine: CNC
Step:(1) Check Total Length as per above method (25.30 / 25.80) Step:(2) Check Groove Diameter as per above method - (15.75 / 15.85) Step:(3) Check Pre Drill Diameter as per above method - (9.25 / 9.80) Step:(4) Check Drill Depth as per above method - (19.05 / 19.55)
Step:(5) Check Distance as per above method - (13.60 / 13.85) Step:(6) Check Pre Outer Diameter as per above method - (16.92 / 16.94) Step:(7) Check Head Thickness as per above method - (11.45 / 12.10) Step:(8) Check the Free From line marks, chattering marks,damages etc.,