Part Number: 593707A02

Part Name: Plug Relief Valve

STANDARD OPERATING PROCEDURE Drawing Rev. No & Date: C & 28 Nov 2011
SOP No: LI / SOP / PRV / 03
SOP Revision No & Date: 0 & 16 Mar 16
Operation Number & Name of Operation:- 60 & Turning Name of the Machine: CNC

Step:(1) Check Total Length as per above method (25.30 / 25.80) Step:(2) Check Groove Diameter as per above method - (15.75 / 15.85) Step:(3) Check Pre Drill Diameter as per above method - (9.25 / 9.80) Step:(4) Check Drill Depth as per above method - (19.05 / 19.55)

Step:(5) Check Distance as per above method - (13.60 / 13.85) Step:(6) Check Pre Outer Diameter as per above method - (16.92 / 16.94) Step:(7) Check Head Thickness as per above method - (11.45 / 12.10) Step:(8) Check the Free From line marks, chattering marks,damages etc.,

List of Documents / Guidelines: List of Records: Revision History Details

Sl.No. Revn No Revn Date Change History

1 0 16March2016 Fresh Release


(1) If any abnormality and NC Product observed during production
react as per reaction plan - (LI / RP / Plug Relief Valve / 06)
(1) Line Inspection Report - LI/LIR/Plug Relief Valve 01
(2) Follow Startup and Shutdown procedure for machine -
(2) Daily Machine Maintenance Checklist
(LI / WI / Maint / 02)
Prepared By Approved By
(3) Tool Life Monitoring Sheet
(3) Setup Procedure - (LI/SOP/Plug Relief Valve 01) V.Karthigaikumar T.Prabhudass
(4) Defect Tally Sheet - LI/DTS/Plug Relief Valve/01
(4)Tool Layout