Professional Documents
Culture Documents
RFP for Construction of Six lane Vadodara Kim Expressway from Km 355.00 to Km 378.740 (Padra
to Vadodara Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase -
VI on EPC mode (Phase IA-Package I)
The National Highways Authority of India is engaged in the development of National Highways and
as part of this endeavour, it has been decided to undertake construction of Six lane Vadodara Kim
Expressway from Km 355.00 to Km 378.740 (Padra to Vadodara Section of Vadodara Mumbai
Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA-Package I)
through an Engineering, Procurement and Construction (EPC) Contract.
The National Highways Authority of India represented by its Chairman now invites bids from eligible
contractors for the following project:
Officer In-charge
Mr. Kamal Arora
General Manager (Expressway),
National Highways Authority of India,
G-5&6, Sector-10, Dwarka, New Delhi-110075
Phone: +91-11-25074100/200 (Extn. 1063)
e-mail: kamalarora@nhai.org
Signature Not Verified
Digitally signed by KAMAL KUMAR
ARORA
Date: 2017.08.09 17:49:30 IST
Location: Government eProcurement
System