You are on page 1of 8

Type of Structure

Size of Structure
Sl. No. Building/Structure List Scope Input Data by Quantity (RCC/Structural Remarks of BOP Mechanical Remarks of
(LxBxH in Mtrs)
Steel)

A Site Related Investigations

1 Geotechnical Investigation TJ

2 Land Survey (Contour and Grid) TJ

B Construction Enabling Works

1 Site grading TJ/TV

2 Micro grading TJ/TV

C Main Plant Area

1 TG Building TJ

2 TG Control room TJ

3 Generator Transformer TJ

4 Station Transformer TJ

5 Unit Auxiliary Transformer TJ

6 Unit Transformer TJ

7 Station Auxiliary Transformer TJ

8 Spare GT TJ

9 Transformer Oil Pit in Main Transformer Yard TJ

10 Air Compressor & DG Building TV

Steam Generator (Boiler) Superstructure including Elevator supporting


11 structure & Machine room B

12 RCC Slab for machine room of Steam Generator (Boiler) lift TJ

13 Steam Generator (Boiler) Foundations including Lift pit. TJ

14 ESP Superstructure TJ

15 ESP Foundation TJ

16 Duct Supporting Structure B

17 Duct Supporting Structure Foundations TJ

18 TG Foundation TJ

19 BFP Foundation TJ

20 PA, FD & ID fan foundation TJ

21 Platforms around PA,FD & ID fans B

22 Mill and Bunker Building including Bunkers, liners (super structure) B

23 RCC floors for Bunker building TJ

24 Mill and Bunker Building (Foundation) TJ

25 Mill Foundations TJ

Transfer Tower in Main plant area (next to bunker building) -


26 TV
Superstructure
Transfer Tower in Main plant area (next to bunker building) -
27 TV
Foundations.
Conveyer Gallery, Trestle in main plant area (between TT / bunker
28 TV
building - in scope of B) - Superstructure
Type of Structure
Size of Structure
Sl. No. Building/Structure List Scope Input Data by Quantity (RCC/Structural Remarks of BOP Mechanical Remarks of
(LxBxH in Mtrs)
Steel)
Conveyer Gallery, Trestle in main plant area (between TT / bunker
29 TV
building - in scope of B) - Foundation

30 Interconnection galleries between boiler structure and TG building B

31 Interconnection galleries between boiler floors and bunker building B

32 Inter connection from TG building to Service building TJ

33 Fire Water Booster Pump Shed TV

34 CW and CEP pits (Within TG Building) TJ

35 RCC Paving from Power House to Chimney including Boiler area TJ

36 ESP Control / Switch gear rooms TJ

37 RCC Chimney including Wind Tunnel Study TJ

38 Condensate Storage Tank Foundation TJ

39 Foundations for all the pumps/equipments, pits, trenches in the TG area TJ

40 Foundations for all the pumps/equipments, pits, trenches in the SG area TJ

41 Transformer Yard Structures including Foundations TJ

42 Bunker MCC Room, if applicable TV

43 Clean & Dirty Lube oil Tank TJ

44 SA Fan Foundation TJ

45 Platforms around SA fans B

46 Continuous Emission Monitoring System ( CEMS) Room TJ

47 Auxiliary Boiler & Deaerator Super Structure TJ

48 Auxiliary Boiler Foundation & Deaerator Structure Foundation TJ

49 Auxiliary Boiler Control Room TJ

50 VIS for Fans, Mills ( if applicable) NA

D 400 kV Switchyard

Interconnecting bay from 220 kV switchyard to 400 kv switchyard-


1 TJ
Foundation work

2 Switch Yard Control Building TJ

3 Towers, Gantries, Equipment -Supports and Foundations TJ

4 Roads & Drains within Switch Yard TJ

5 Gravel Paving TJ

6 Cable trenches within switch yard TJ

Reactor foundations, Rail Track with foundation, Burnt oil pits, Fire
7 TJ
barrier walls

8 Fencing TJ

E Coal Handling System

1 Crusher House TV

2 Crushed Coal storage area incl. Drains TV

3 Wagon Tippler- Civil works TV


Type of Structure
Size of Structure
Sl. No. Building/Structure List Scope Input Data by Quantity (RCC/Structural Remarks of BOP Mechanical Remarks of
(LxBxH in Mtrs)
Steel)

4 Track Hopper- Civil works TV

5 MH-1&2 - Civil works TV

6 Reclaimer Hopper-1,2 & 3 TV

7 Junction Tower and Foundations TV

8 Sampling Tower and Foundations TV

9 Coal Conveyors Supporting Structures and Foundations TV

10 Stacker Reclaimer Foundation TV

11 Bulldozer Shed TV

12 HGTU Structure & Foundation TV

13 Cable Gallery structure & Foundation TV

14 Control Building for Tippler TV

15 Main Control Building for CHP TV

16 Electrical Building/MCC Room buidlings (2nos) TV

17 Pump Houses for DS system (with RCC Tanks) TV

18 DS Compressor Room for Dry Fog Type DS system TV

19 Coal Pile Runoff Pond (RCC Settling Pond) TV

20 Dust Extraction,Supression Supporting Structure TV

21 Roads & drains in CHP area TV

22 Conveyor Tunnel TV

23 Pent House TV

24 Ground Yard conveyors TV

25 Rail over Track Hopper Complex TV

26 Balance Complete Railway siding package C

F Ash Handling System including Fly Ash Silos

1 Ash Silo TV

2 Dry Ash Silo Utility Building TV

3 Bottom Ash Hopper Foundations TV

4 Ash Slurry Tank & Pump house TV

5 Ash Pipe racks,trenches,culverts,Pedestals TV

6 Ash Water Tank & Pump house TV

7 AHP Control Room TV

8 Ash Compressor cum Vacuum Pump House TV

9 AHP/Eco Slurry Tank TV

10 AHP Tube Settler Plant with civil works TV

Ash Disposal system civil works including pedestals,crossings of lake,


11 TV
nallahs, road, railways etc.

12 Buffer hopper tower and collector tank tower structure and foundation TV
Type of Structure
Size of Structure
Sl. No. Building/Structure List Scope Input Data by Quantity (RCC/Structural Remarks of BOP Mechanical Remarks of
(LxBxH in Mtrs)
Steel)
Ash Pond improvement work including strengthening of existing Ash
13 TV
Dyke bund wall

14 Modification of existing Ash Water Recovery Pump House TV

15 Misc. Equipment Foundations TV

G Mill Reject Handling System

1 Mill Reject Silo Structures TV

2 Equipment Foundations for Mill reject system TV

3 Pipe racks/supports for Mill reject system TV

4 Pipe rack foundations TV

5 Mill Reject Compressor Control Room TV

6 Silo Structure Foundations and trenches TV

H Fuel Oil Handling System

1 FO Unloading Area & Pump House TV

2 HFO/LDO Tank Area TV

3 FO Area Electrical & Control Room TV

4 Drain oil tank pit, Oil cooler, Oil heater foundation, Sump pit, Oil water pit TV

5 HFO/LDO Pressurizing Pump House TV

6 Fencing TV

I Water Systems

I-1 PT Plant

1 Intake channel from the Canal upto pump house and desilt basin TV

2 Intake pump house and forebay TV

3 Raw water intake pump house TV

4 Raw water intake pump house control room TV

5 Raw water reservoir (twin compartments) TV

6 Raw water pump house TV

7 Raw water pump house control room TV

8 Cascade Aerator TV

9 Stilling Chamber TV

10 Inlet & Outlet channel for Clarifiers TV

11 Flash mixer TV

12 Clariflocculator TV

13 Clarified water storage tank TV

14 Sludge Pit TV

15 Sludge Thickener TV

16 Thickened sludge sump TV

17 Centrifuge Building (double floor with staircase) TV


Type of Structure
Size of Structure
Sl. No. Building/Structure List Scope Input Data by Quantity (RCC/Structural Remarks of BOP Mechanical Remarks of
(LxBxH in Mtrs)
Steel)

18 Clarified water pumps house TV

19 Clarified water pump house control room TV

20 Common chemical house for PT & ETP (two storied building) TV

21 PT & PW chlorination sytem building TV

22 PT & PW chlorination sytem control room TV

23 Alum solution preparation tank TV

24 Lime solution preparation tanks TV

25 Pump foundations TV

I-2 DM Plant

1 DM Plant building with MCC ROOM TV

2 Water system control room (DM & CPU) TV

3 De gassed water storage tank TV

4 Bulk chemical storage area dyke wall TV

5 DM plant N-Pit (twin compartments) TV

6 Chemical laboratory TV

7 Foundation for DM water storage tank TV

8 Foundation for Condensate storage tank TV

9 Drain trench TV

10 Vessel foundations in DM Plant TV

11 Pump / blower foundations TV

12 Dosing tank foundations TV

I-3 Effluent Treatment and Recycling System


Retention pit for oily effluent from Fuel Oil pump house and unloading
1 TV
area

2 API type of oil water Separtor TV

3 Fuel oil oily waste sump pit TV

4 Treated water sump TV

5 Turbine area oily waste sump TV

6 Boiler area oily waste pit TV

7 Switch yard area oily waste pit TV

8 Common oily waste water sump TV

9 Foundation of OWS TV

10 Boiler area waster sump TV

11 Coal Pile Rainfall Runoff Settling Pond (With two compartments) TV

12 Settling pond overflow sump TV

13 Twin compartment CMB / Guard pond TV

14 CMB Overflow sump TV


Type of Structure
Size of Structure
Sl. No. Building/Structure List Scope Input Data by Quantity (RCC/Structural Remarks of BOP Mechanical Remarks of
(LxBxH in Mtrs)
Steel)

15 Condensate waste water pit TV

16 TG wash water sump TV

17 ESP area wash water sump TV

18 Pre settling pit ( ESP Area sump) TV

19 Ash silo area water sump TV

20 ETP Control room TV

21 Flash mixer TV

22 Reactor Clarifier TV

23 Sludge sump TV

24 UF Water sump TV

25 De gassed water storage tank TV

26 ERS plant building TV

27 ERS plant control room TV

28 SSF Back wash water pit TV

29 Rain water Harvesting Pond TV

30 Pump / blower foundations TV

31 Dosing tank foundations TV

I-4 CW Treatment Plant

1 Side stream filters foundation TV

2 CW Chemical dosing building TV

3 CW Chlorination sytem building TV

4 CW Chlorination sytem control room & CWTP control room TV

5 Dosing tank foundations TV

6 PUMP foundations TV

7 Bulk chemical storage area dyke wall for Sulphuric Acid TV

I-5 Sewage Treatment Plant

1 Sewarage network for complete plant TV

Septic tank with soak pit arrangement for remote area sewage
2 TV
generation stations

3 Equalization Tank / Common collection sump TV

4 Aeration tank TV

5 Clarifier TV

6 Sludge Drying Beds TV

7 Clear water collection tank TV

8 Pump / Blower / dosing tank foundations TV

I-6 Condensate Polishing Plant

1 Foundations for CPU service vessels TJ

2 Regeneration building / control room TV


Type of Structure
Size of Structure
Sl. No. Building/Structure List Scope Input Data by Quantity (RCC/Structural Remarks of BOP Mechanical Remarks of
(LxBxH in Mtrs)
Steel)

J Condenser Cooling Water System

1 CW & ACW Pump House TV

2 CW Forebay & Channel TV

3 CW & IDCT Electrical Room TV

4 CW Conduits ( Cwph To Condenser) TV

5 CW Conduits ( Condenser To Cooling Tower) TV

6 IDCT TV

K Miscellaneous Plant Buildings / Facilities

1 Roads TJ/TV

2 Storm Water Drain (Main) TJ/TV

3 Storm Water Drain ( Garland) TJ/TV

4 Pipe and Cable racks (superstructure) E

5 Pipe and Cable racks Foundation TJ/TV

6 Cable Trenches TJ/TV

7 Pipe Pedestals , Trenches, Duct Banks TJ/TV

8 Lighting Mast Foundation TJ/TV

9 Civil and Structural Works for Perimeter Intrusion System and CCTV TV

10 Package Septic Tank ( if required) TV

11 Earthing Mat(installation Only) TJ/TV

12 Civil Works For Burried Pipe TJ/TV

13 Area Paving (other than power block area) TV

14 Demolition and Relocation of existing underground utilities/facilities TJ/TV

15 Dismantling of Existing Compound wall TV

16 Construction of New Compound wall TV

L Non Plant Building/Structures

1 Service Building TJ

2 Administrative Building TV

3 Fire station TV

4 Work Shop TV

5 Permanent Stores (Open +covered) TV

6 O/M Stores TV

7 Canteen TV

8 Main Gate TV

9 Heavy Vehicle Entry Gates TV

10 Times office cum security office TV

11 Dispensary and First aid center TV


Type of Structure
Size of Structure
Sl. No. Building/Structure List Scope Input Data by Quantity (RCC/Structural Remarks of BOP Mechanical Remarks of
(LxBxH in Mtrs)
Steel)

12 Parking for Cars.Scooters and Cycles TV

13 Weigh Bridge for Fly Ash Silo TV

14 Weigh Bridge Control Room TV

15 Watch Tower TV

16 Lube Oil storage shed with empty barrel storage yard TV

17 Coal Sampling / Processing Room in CHP Area TV

18 Unloading Platform TV

19 Gas Cylinder storage Building (N2) TV

20 Gas Cylinder storage Building (H2 & CO2) TV

21 FOPH Foam shed TV

22 Air Washer Room TJ

M Miscellaneous Works

1 Sheds for outdoor pumps E

2 Miscellaneous Concrete TJ/TV

3 Sign Boards TJ/TV

4 Road Signs TJ/TV

5 Flag Posts TJ/TV

6 Road Marking etc. TJ/TV

7 Neutralisation pit in Boiler area (if requred) TJ

8 RAPH foundation (if requred) TJ

9 Hard crusting in Boiler area TJ

10 Landscaping TV

11 Anti termite and antiweed treatment TJ/TV

12 HVAC Civil works. TV

Misc. steel structure like grating, handrails, ladder/staircase, platforms,


13 B
edge protection angle for equipment foundation in SG area

Misc. steel structure like grating, handrails, ladder/staircase, platforms,


14 TJ
edge protection angle for equipment foundation in TG area