GOLDEN ARROW RESOURCES CORP. age annual production would equate to


[GRG-TSXV; GARWF-OTCQB; G6A-SE] 2,100,000 ounces of silver equivalent. This
and joint venture partner SSR Mining Inc. would represent total attributable after-tax
[SSRM-TSX, NASDAQ], formerly Silver undiscounted cash flow of US $66.75 mil-
Standard Resources, are gradually working lion, based on a recent prefeasibility study.
through the Argentine permitting process Meanwhile, Joseph Grosso, Executive
to begin production at the Chinchillas Chairman, President and CEO of Golden
open pit silver mine. It is expected the Arrow, told Resource World that the com-
exploitation permit will be received in the pany has created a new company for its
near future. Argentine exploration projects that would
The joint venture, named Puna be a subsidiary of Golden Arrow named
Operations Inc., was formed to hold New Golden Explorations Inc.
Golden Arrows Chinchillas Project and One of the New Golden Explorations
SSRs Pirquitas Project, which consists of projects is the Antofalla silver-gold project
the now closed San Miguel open pit mine in Catamarca Province where initial results
and associated mineral processing and tail- from soil sampling and surface surveys
ings facility in Jujuy Province, northern have been encouraging. This has prompted
Argentina. Puna is 75% owned and oper- the company to plan a 3,000-metre
ated by Silver Standard, and 25% owned drill program for the fourth quarter this
by Golden Arrow. The joint venture was year.
formed in order to mine the Chinchillas Golden Arrow is also making plans for
deposit and truck the ore to the Pirquitas an exploration program on its Pescado gold
mill for processing. project located in San Juan Province where
The Chinchillas silver (lead-zinc) deposit it has two other projects the Mogote
will be mined by conventional drill, blast, copper-gold project and the Potrerillo
truck and loading open pit methods. A fleet gold-silver project. Other exploration
of 35-tonne road haul trucks will transport projects include the Don Bosco and
ore 42 km to the Pirquitas mill. Haul truck, Caballos copper-gold projects in La Rioja
loading equipment and drills at Pirquitas Province.
will be transferred to Chinchillas. The plan Grosso said that Golden Arrow intends
enables the project to use existing equip- to fund New Golden Explorations initial
ment and infrastructure for capital cost working capital by tapping into the ven-
savings and an expected shorter time to ture capital markets. It is intended that
production at the Chinchillas Mine. New Golden Explorations operations will
Mining the Chinchillas deposit is be self-financing by way of equity financ-
expected to supply the Pirquitas opera- ings, and, possibly, with an initial public
tion with milling ore in the second half of offering in the near future. Golden Arrow
2018. It is expected that the average annual intends to retain a controlling share posi-
silver equivalent production will total 8.4 tion in New Golden Explorations. n
million ounces over an eight-year mine life
at a production rate of 4,000 tonnes per
day. Golden Arrows 25% share of aver-

OCTOBER/NOVEMBER 2017 www.resourceworld.com 53