1.1 SCOPE /
This procedure covers the requirements for the test and inspection of the AC / DC
BUS DUCT for Mongduong1 #1, 2..
Mongduong1 #1, 2 AC/DC BUS DUCT
.
1.2 APPLICATION /
This procedure shall be applied to test and inspection of the AC/DC BUS DUCT
manufactured in accordance with the customer's technical specification.
AC/DC BUS DUCT
.
1.3 REFERENCE /
The requirement of this procedure are established in accordance with the Applicable
section of the followings.
.
2
Site Inspection & Test Procedure
Document Number
ELECTRO ELECTRIC SYSTEMS
HHI-EES-W210-130701-A01
(Condition of ambient / )
1. Temp/ : Max./ 40
2. Humidity/ : between 7% to 90% (7% 90%)
Result (M) / :
R - E M S - E M T - E M
Before
/
Main R - S M S - T M T - R M
circuit
/ R - E M S - E M T - E M
After/
R - S M S T M T - R M
Certification Signatures ()
Doosan : Date/ :
Owner : Date/ :
3
Site Inspection & Test Procedure
Document Number
ELECTRO ELECTRIC SYSTEMS
HHI-EES-W210-130701-A01
Result (M) / :
P - E M N - E M - - -
Before
/
Main P - N M - - - - - -
circuit
/ P - E M N - E M - - -
After/
P - N M - - - - - -
Certification Signatures ()
Doosan : Date/ :
Owner : Date/ :
4
Site Inspection & Test Procedure
Document Number
ELECTRO ELECTRIC SYSTEMS
HHI-EES-W210-130701-A01
,
.
The wave shape shall be essentially sinusoidal and the frequency shall be
within 20% of the rated value 60Hz (IEC-62271-200)
IEC-62271-200
50Hz20% .
1) Procedure /
*The test shall be made phase to phase and each phase to ground for
These tests.
.
5
Site Inspection & Test Procedure
Document Number
ELECTRO ELECTRIC SYSTEMS
HHI-EES-W210-130701-A01
ACCEPTANCE CRITERIA :
The test shall be considered to have passed if no disruptive discharge occurs
during each test.
Flash Over .
Certification Signatures ()
Doosan : Date/ :
Owner : Date/ :
ACCEPTANCE CRITERIA :
The test shall be considered to have passed if no disruptive discharge occurs
during each test
Flash Over .
Certification Signatures ()
Doosan : Date/ :
Owner : Date/ :