You are on page 1of 10

Water and Wastewater Calculation Spreadsheet Instructions

Spreadsheet Version: 2013.08

1. For use with EMI's Civil & Environmental Preliminary Design Guide for Undeveloped Sites.

2. Rename and save this file in your project folder. It is read-only.

3. Light blue cells indicate user input.

4. Mouse over cells with red triangles in the corners for tips and information.

5. Add columns and modify this spreadsheet as necessary. It was created to be customized.
Users Water Usage Rates in Liters per Capita per Day (Lpcd)1 Wastewater Production (Lpd)3
Total per
Building User (Capita) No. of Domestic Institutional
Hospital Capita Total Usage
Building
Code Type per Buildings Utensil House Clothes Day-use Usage per Day2
Building Drinking Cooking Washing Washing Washing Bathing Toilets Other Hospital (Lpcd) (Lpd) Graywater @ Blackwater @
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
TOTAL GRAYWATER TOTAL BLACKWATER
ADDITIONAL USES - -
Notes
1
Usage determined based on local information or from the EMI Civil Preliminary Design Guide Agriculture -
2
The total usage rate is calculated by multiplying the per capita usage rate by the total number of users (i.e. Other -
users for all buildings).
3
Watewater production is equal to total water usage, which assumes that inflow & infiltration replaces any TOTAL WATER USAGE
water consumed. L/day -
L/month -
m3/month -
WELL PUMP CAPACITY
L/hour
Pump Hours
per Day
L/day -
% Capacity #DIV/0!
WATER STORAGE
Storage Required days = - L
Tank Shape
Tank Battery (Group of Tanks) Single Tank Size
Tank Side m #DIV/0! m
Other Tank Side m m
Water Height m m
Tank Freeboard m m
Total Tank Height 0.00 m 0.00 m
Tank Volume 0 L #DIV/0! L
Number of Tanks #DIV/0!
Tank Spacing m
Number of Tank Rows
Num. of Tank Columns
Required Footprint 0.00 m2
APPROX. HEIGHT OF STORAGE
Pressure Required kPa = 0.00 m height
Date:
Time:
Location:
Time Depth to Water Depth Perc Rate
(min) (cm) (mm) (mm) (mm/min) (min/mm) (min/25 mm)
0.00 0.0 -- -- -- --
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!
0.0 0.0 #DIV/0! #DIV/0! #DIV/0!

Result:

Application Rate (lpd / m2)


#N/A

Soil Characterization
Depth Soil Type Notes
Wastewater Primary Treatment (Septic Tanks)1
Total Total
Building Total Liquid A: Liquid B: Scum & Tank Dimensions (m)
Building Graywater Blackwater
Code Users Septic Tank Users per Wastewater per Retention Storage Capacity Total Volume (m3) Length 1st Length 2nd Resulting Tank
(Lpd) (Lpd)
Code Tank Tank (Lpd) Volume (L) (L) Required (A+B) Width2 Length3 Compartment Compartment Water Depth4 Height Storage Volume (m3)
- - - - - - - -
0 0 - - -
- - - - - - - -
- - - - - - - -
0 0 - - - - - - - - - - -
- - - - - - - -
0 0 - - - - - - - - - - -

Design Constants
Notes
N = Years between 1
Septic tank design based on "A Guide to Development of On-Site Sanition" by the World Health Organization, 1992, using the following criteria
Desludging: for liquid retention times:
If Q < 6,000 L/day, T = 24 hours
F = Sludge Digestion Rate
If 14,000 L/day > Q > 6,000 L/day, T = 33 - 0.001Q hours
Factor: If Q > 14,000 L/day, T = 12 hours
where: Q = tank inflow and T = retention time
Septic Tank Receives: And the following formula for scum & storage capacity: B = P x N x F x S
where: B = the required sludge and scum storage capacity in liters
P = Number of people served
Rate of Sludge and Scum N = Number of years between dislodging
40 L/person/yr
Accumulation: F = Sludge digestion rate factor
S = Rate of sludge and scum accumulation (25 L/person/yr receiving only blackwater; 40 L/person/yr all wastewater)
Required Freeboard: meters 2
Minimum width (W) of 0.6m.
3
Total length = 2W (first compartment) + W (second compartment).
4
Depth of water only, not less than 1.2m (1.5m preferred) or greater than total length; Height must include additional freeboard (open space)
above water surface in tank.

Sludge Digestion Rate Factor (F)

Number of years F if ambient temp F if ambient temp


F if ambient temp <10
between >20 degrees C >10 degrees C
degrees C during winter
desludging throughout the year throughout the year

1 1.3 1.5 2.5


2 1 1.15 1.5
3 1 1 1.27
4 1 1 1.15
5 1 1 1.06
6 or more 1 1 1
Wastewater Secondary Treatment & Disp
Total Total
Building Total Wastewater to Rectangular Pit Dimensions (m) Circular Pit Dimensions (m) Soak Be
Building Graywater Blackwater
Code Users Load System Infiltrative Bottom Number Proposed Bottom Circular Wall Depth Number Proposed
(Lpd) (Lpd)
(Lpd) Area (m2) System Description Length Width Depth Area Wall Area of Pits Diameter Area Area Depth per Pit of Pits Field Width

0 0 - - - #DIV/0! - - #DIV/0! - #DIV/0! #DIV/0! #DIV/0!

0 0 - - - #DIV/0! - - #DIV/0! - #DIV/0! #DIV/0! #DIV/0!

0 0 - - - #DIV/0! - - #DIV/0! - #DIV/0! #DIV/0! #DIV/0!

Design Constants

Wastewater Application Rate:


Lpd/m2
Wastewater Secondary Treatment & Disposal Options
Total Total
Building Total Soak Bed Dimensions (m) Trench Dimensions (m)
Building Graywater Blackwater
Code Users Infiltrative Necessary Pipe Shoulder Number of Proposed Infiltrative Total Necessary Number of Length of Trench
(Lpd) (Lpd)
Depth Field Length Spacing Width Pipe Lengths Trench Width Depth Trench Length Trenches Each Trench Spacing Total Width Option Selected

0 0 - - - #DIV/0! #DIV/0! #DIV/0! #DIV/0! - -

0 0 - - - #DIV/0! #DIV/0! #DIV/0! #DIV/0! - -

0 0 - - - #DIV/0! #DIV/0! #DIV/0! #DIV/0! - -


VIP LATRINE DESIGN

N (effective life of the pit in years)


P (avg number of people using the pit daily)
R (estimated sludge accumulation rate for a single person in m 3/year)
V (effective volume of the pit (m3) = N x P x R

Diameter of the bottom of the pit (m)


Sludge Depth (m)

Q (water used for flushing in liters per day per person)


A (application rate in lpd/m2)
Infiltration Depth (m)=

Pit Depth (m) = Sludge Depth + Infiltration Depth + 0.5m

Sludge Accumulation Rate


Wastes retained in water where degradable anal cleaning materials are used
Wastes retained in water where non-degradable anal cleaning materials are used
Waste retained in dry conditions where degradable anal cleaning materials are used
Wastes reatained in dry conditions where non-degradable anal cleaning materials are used
0

#DIV/0!

#DIV/0!

#DIV/0!

R
40
60
60
90
Water Usage Rates in Liters per Capita per Day (Lpcd)1
Total per Total
Village User Number Users per Domestic Animals Capita Total Usage Usage per
Name Group of Groups Group Utensil House Clothes Usage per Day2 Village per
Drinking Cooking Washing Washing Washing Bathing Toilets Other Cow & Buffalo (Lpcd) (Lpd) Day (Lpd)
- -
-
- -
- -
-
- -

Notes
1
Usage determined based on local information or from the EMI Civil Preliminary Design Guide (Appendix A,
Indian Standards of Water Usage)
2
The total usage rate is calculated by multiplying the per capita usage rate by the total number of users (i.e.
users for all buildings).