You are on page 1of 15

I.

PEKERJAAN PERSIAPAN

I.1. PEK. BOUWPLANK


Panjang bangunan = ( 11.00 m + 11.00 m ) x
Lebar bangunan = ( 9.00 m + 9.00 m ) x

I.2. PAGAR PROYEK


Panjang bangunan = ( 20.00 m + 3.00 m ) x
Lebar bangunan = ( 8.00 m + 3.00 m ) x

II. PEKERJAAN STRUKTUR

A. PEKERJAAN TANAH
1 GALIAN TANAH PONDASI TAPAK (1,5x1,5x0,2)
Tinggi = 2.15 m =2+0.1+0.05
Lebar = 1.60 m
Jumlah = 24.00 ttk

Volume = 132.10 m3

2 GALIAN TANAH SLOOF 20/30


Tinggi = 0.30 m
Lebar = 0.30 m
Panjang = 124.00 m

Volume = 11.16 m3

3 URUG TANAH PEIL LANTAI PADAT


Lebar = 11.00 m
Panjang = 22.00 m
Tebal = 0.40 m

Volume = 96.80 m3

4 URUG PASIR BAWAH LANTAI TB=5 CM


Lebar = 11.00 m
Panjang = 22.00 m
Tebal = 0.05 m

Volume = 12.10 m3

5 URUG PASIR BAWAH PONDASI DAN SLOOF TB=5 CM


Dibawah pondasi ;
Lebar = 1.60 m
Tebal = 0.05 m
Jumlah = 24.00 ttk
Volume = 3.07 m3
Dibawah sloof ;
Lebar = 0.30 m
Panjang = 124.00 m
Tebal = 0.05 m
Volume 1.86 m3

Volume Total = 4.93 m3

B. PEKERJAAN PONDASI
1. PONDASI TAPAK (1,5x1,5x0,2)
Volume = 0.45 m3
Jumlah = 24.00 ttk

Volume Total = 10.80 m3

2. KOLOM PEDESTAL (30X30)


Tinggi = 2.20 m
Dimensi = 0.09 m2
Jumlah = 24.00 ttk

Volume Total = 4.75 m3

3. SLOOF 20/30
Panjang = 114.90 m'

Volume = 6.89 m3

4. PLASTIK SHEET
Lebar = 11.00 m
Panjang = 22.00 m

Volume = 242.00 m2

C. PEKERJAAN KONSTRUKSI BETON


C.1 Lantai 1 (Elevasi 0,00 ~ +4,00)
1. KOLOM 30X30
Tinggi = 4.00 m
Luas = 0.09 m2
Jumlah = 24.00 ttk

Volume = 8.64 m3

2. BALOK 30/40
Panjang arah x = 70.30 m'
b = 0.30 m
h = 0.40 m

Volume = 8.44 m3
3. BALOK 20/30
Panjang arah y = 41.20 m'
b = 0.20 m
h = 0.30 m

Volume = 2.47 m3

4. PELAT TB=12 CM
Luas
Blok I = 12.00 m2
Jumlah = 10.00 blok = 120.00 m2

Blok II = 4.00 m2
Jumlah = 1.00 blok = 4.00 m2

Blok III = 8.00 m2


Jumlah = 1.00 blok = 8.00 m2

Jumlah luasan = 132.00 m2


Tebal = 0.12 m

Volume = 15.84 m3

5. CANOPY TB=10 CM
Depan ;
Panjang = 12.00 m
Lebar = 0.70 m = 8.40 m2

Belakang ;
Panjang = 4.00 m
Lebar = 0.70 m = 2.80 m2

Jumlah luasan = 11.20 m2


Tebal = 0.08 m

Volume = 0.90 m3

6. RABAT BETON TB=6 CM


Panjang = 58.00 m
Lebar = 1.00 m
Tebal = 0.06 m

Volume = 3.48 m3

C.2 Lantai 2 (Elevasi 0,00 ~ +4,00)


1. KOLOM 30X30
Tinggi = 4.00 m
Luas = 0.09 m2
Jumlah = 24.00 ttk

Volume = 8.64 m3

2. DAK
Depan ;
Lebar = 2.00 m
Panjang = 20.00 m = 40.00 m2

Belakang ;
Lebar = 1.20 m
panjang = 20.00 m = 48.00 m2

Jumlah Luas = 88.00 m2


Volume = 8.80 m3

3. LISPLANK BETON
Panjang = 56.00 m'
Tinggi = 0.30 m'
Tebal = 0.08 m

Volume = 1.34 m3

4. RINGBALK
Panjang arah x = 0.80 m
Panjang arah y = 38.00 m'
Jumlah = 10.00 m'
48.00 m'

Volume = 2.88 m3

29. Plat beton tangga

Volume Lantai dasar = 6.44 m3

Panjang = 4.00 m
Tinggi = 2.00 m
= 4.47 m

1
III. PEKERJAAN ARSITEKTUR

2. Pas. Dinding
LANTAI 1

Tinggi = 3.88 m
Panjang arah x = 64.00 m'
Panjang arah y = 29.00 m'
Jumlah = 93.00 m'

Volume Lantai dasar = 360.84 m2

AREA KUSEN
J2 = 2.88 m2 x 5.00 = 14.40 m2
BV = 0.28 m2 x 4.00 = 1.12 m2
PVC = 1.60 m2 x 4.00 = 6.40 m2
P1 = 2.16 m2 x 2.00 = 4.32 m2
P2 = 4.32 m2 x 1.00 = 4.32 m2
Kaca Depan = 13.69 m2 x 2.00 = 27.38 m2
Jumlah = 57.94 m2

Volume Lantai dasar dikurangi vol dinding = 302.90 m2

LANTAI 2
Tinggi = 3.88 m
Panjang arah x = 48.00 m'
Panjang arah y = 18.00 m'
Jumlah = 66.00 m'

Tinggi = 0.80 m
Panjang arah x = 38.00 m'
Panjang arah y = 10.00 m'
Jumlah = 48.00 m'
Volume Lantai 2 = 114.00 m2

AREA KUSEN
J2 = 2.88 m2 x 10.00 = 28.80 m2
Kaca 50x50 = 1.85 m2 x 5.00 = 9.25 m2
Kaca Depan = 13.69 m2 x 2.00 = 27.38 m2
Jumlah = 65.43 m2

Volume Lantai dasar dikurangi vol dinding = 48.57 m2

10. PARTISI GYPSUM


Dinding Gypsum;
Panjang = 12.00 m'
Tinggi = 4.00 m
Volume = 48.00 m2

Area Kusen;
P2 = 4.32 m2 x 2.00 = 8.64 m2

Volume dinding partisi dikurangi kusen = 39.36 m2

PEKERJAAN LANTAI DAN DINDING

1. Pekerjaan Lantai keramik 60x60


LANTAI 1
Teras depan = 12.00 m2
Bangunan dalam = 192.00 m2
Tangga ;
Jumlah anak tangga = 15.00 anak tangga
lebar = 1.00 m
Optrade = 4.50 m2
Antrede = 3.00 m2
Bordes = 2.00 m2
Jumlah = 9.50 m2
Pengurangan ;
Toilet & Tangga = 32.67 m2

Volume Lantai 1 = 180.83 m2

LANTAI 2
Teras depan = - m2
Bangunan dalam = 192.00 m2
Tangga ;
Jumlah anak tangga = 15.00 anak tangga
lebar = 1.00 m
Optrade = 4.50 m2
Antrede = 3.00 m2
Bordes = 2.00 m2
Jumlah = 9.50 m2
Pengurangan ;
Toilet & Tangga = 32.67 m2

Volume Lantai 2 = 168.83 m2

Volume Lantai 3 = 168.83 m2

Volume Lantai 4 = 168.83 m2

PAS. PLINT KERAMIK

Volume Lantai 1 = 10.80 m2

Volume Lantai 2 = 10.80 m2

Volume Lantai 3 = 10.80 m2

Volume Lantai 4 = 10.80 m2

PAS. LANTAI KERAMIK KAMAR MANDI

Volume Lantai 1 = 9.72 m2

Volume Lantai 2 = 9.72 m2

Volume Lantai 3 = 9.72 m2

Volume Lantai 4 = 9.72 m2

PAS. KERAMIK DINDING KM/WC 20x25

LANTAI 1
Tinggi = 1.25
panjang = 6.00 m'
luas = 7.50 m2 - 1.13 =

Volume Lantai 1 = 30.00 m2

PEKERJAAN KUSEN
Pintu Lantai 1 = 2 = 3 = 4 = 1.00 unit

Jendela Lantai 2 = 3 = 4 = 12.00 unit

Rolling Dor = 3.00 unit (2,5*2,5)

PEKERJAAN PLAFON

LANTAI 1

Volume Lantai 1 = - m2

LIST PLAFOND

Panjang Lantai 1 = 161.15 m'

Panjang Lantai 2 = 161.15 m'

Panjang Lantai 3 = 161.15 m'

Panjang Lantai 4 = 161.15 m'

vhkj

5446
PEKERJAAN ATAP

Panjang = 7.00 m
Panjang miring = 3.93 m x
2.00 = 242.00 m' 33.00
2.00 = 162.00 m' 27.00
404.00 m' 60.00

2.00 = 120.00 m'


2.00 = 48.00 m'
168.00 m'
14
13

12
11
10
9
8
7
6
5

4
3
2
Optrede = 0.30 m
Antrede = 0.20 m
= 0.36 m
Panjang plat = 8.94 m Anak tangga =
Lebar = 1.00 m Lebar =
Tebal = 0.12 m Jumlah =
Volume plat = 1.07 m3 Volume Anak Tangga =
Jumlah = 2.15 m3

Plesteran dan Acian

m2

= 605.8 m2
m2

= 97.14 m2

m2
### m2
15

3.4
0.03 m2
1.00 m
15.00 bh
0.45 m3

You might also like