BBS FOR ACHWA BRIDGE WORKS

No. of Total No. BS.


No. of BARS
Members of bars SHAPE Length of bar Total length Total Weight
LOCATION MARK SIZE CODE A B C D mm mm (Tons) Remarks
1 T 20 118 2 236 21 250 5500 250 5950 1404200 3.468 TOP
2 T 20 118 2 236 21 250 5500 250 5950 1404200 3.468 BOT
3 T 20 56 2 112 21 150 11700 150 11950 1338400 3.306 TOP
4 T 20 56 2 112 21 150 11700 150 11950 1338400 3.306 BOT
5 T 20 118 2 236 21 400 1350 400 2100 495600 1.224 U BAR
6 T 20 118 2 236 21 400 1400 400 2150 507400 1.253 U BAR
7 T 20 56 2 112 21 400 1350 400 2100 235200 0.581 U BAR
8 T 20 56 2 112 21 400 1400 400 2150 240800 0.595
9 T 20 6 2 12 21 150 11650 150 11900 142800 0.353 FF
10 T 20 6 2 12 21 300 5450 300 6000 72000 0.178 NF
ABURTMENT 11 T 20 29 2 58 11 400 2550 2925 169650 0.419 FF
FOOTING A&B 12 T 20 29 2 58 11 400 2550 2925 169650 0.419 NF
13 T 20 29 2 58 11 400 3550 3925 227650 0.562 FF
14 T 20 29 2 58 11 400 3550 3925 227650 0.562 NF
15 T16 8 4 32 11 400 3550 3930 125760 0.199 FF
16 T16 8 4 32 11 400 3550 3930 125760 0.199 NF
17 T16 7 4 28 11 400 2550 2930 82040 0.130 FF
18 T16 7 4 28 11 400 2550 2930 82040 0.130 NF
19 T 20 50 2 100 98 400 1330 250 250 3460 346000 0.855 Chairs
20 T12 7 2 14 21 150 11500 150 11770 164780 0.147
21 T12 7 2 14 21 150 11500 150 11770 164780 0.147
22 T32 28 2 56 00 1200 1200 67200 0.425
TOTAL 21.924

1 T25 48 2 96 21 400 4300 400 5037.5 483600 1.867 TOP


2 T25 48 2 96 21 400 4300 400 5037.5 483600 1.867 BOT
3 T12 22 2 44 21 300 4750 300 5320 234080 0.208 TOP
4 T12 22 2 44 21 300 4750 300 5320 234080 0.208 BOT
5 T25 48 4 192 21 400 1080 400 1817.5 348960 1.347 U BAR
WINGWALL 6 T12 22 4 88 21 400 1100 400 1870 164560 0.146 U BAR
BASES
Aburtment A 7 T20 15 2 30 98 400 1030 250 250 2880 86400 0.213 CHAIR
8 T25 48 2 96 11 400 2620 2988.75 286920 1.108 FF
9 T25 48 2 96 11 400 3500 3868.75 371400 1.434 NF
10 T25 3 4 12 21 400 4750 400 5487.5 65850 0.254
11 T25 3 4 12 21 400 4300 400 5037.5 60450 0.233
Aburtment A

TOTAL 8.886

1 T25 70 2 140 21 400 4300 400 5037.5 705250 2.722 TOP


2 T25 70 2 140 21 400 4300 400 5037.5 705250 2.722 BOT
3 T12 22 2 44 21 300 6900 300 7470 328680 0.293 TOP
WINGWALL 4 T12 22 2 44 21 300 6900 300 7470 328680 0.293 BOT
BASES
Aburtment B 5 T25 70 4 280 21 400 1080 400 1817.5 508900 1.964 U BAR
6 T12 22 4 88 21 400 1100 400 1870 164560 0.146 U BAR
7 T20 25 2 50 98 400 1030 250 250 2880 144000 0.356 CHAIR
8 T25 70 2 140 11 400 2620 2988.75 418425 1.615 FF
9 T25 70 2 140 11 400 3500 3868.75 541625 2.091 NF
10 T25 3 4 12 21 400 6900 400 7637.5 91650 0.354
11 T25 3 4 12 21 400 4300 400 5037.5 60450 0.233
TOTAL 12.789

1 T 20 118 2 236 21 400 3900 400 4650 1097400 2.711 TOP


2 T 20 118 2 236 21 400 3900 400 4650 1097400 2.711 BOT
3 T 20 40 2 80 21 150 11700 150 11950 956000 2.361 TOP
4 T 20 40 2 80 21 150 11700 150 11950 956000 2.361 BOT
5 T 20 118 2 236 21 400 1350 400 2100 495600 1.224 U BAR
6 T 20 118 2 236 21 400 1400 400 2150 507400 1.253 U BAR
7 T 20 40 2 80 21 400 1350 400 2100 168000 0.415 U BAR
8 T 20 40 2 80 21 400 1400 400 2150 172000 0.425
PIER 1 AND 2 8 T 20 6 2 12 21 150 11700 150 11950 143400 0.354 FF
9 T 20 6 2 12 21 400 3900 400 4650 55800 0.138 NF
10 T 20 29 2 58 11 400 2550 2925 169650 0.419 FF
11 T 20 29 2 58 11 400 2550 2925 169650 0.419 NF
12 T 20 29 2 58 11 400 3550 3925 227650 0.562 FF
13 T 20 29 2 58 11 400 3550 3925 227650 0.562 NF
14 T 20 30 2 60 98 400 1330 250 250 3460 207600 0.513 Chairs
15 T16 7 2 14 21 150 11700 150 11960 167440 0.265
16 T16 7 2 14 21 150 11700 150 11960 167440 0.265
TOTAL 16.958

GRAND TOTAL 60.557


EXCAVATION FOR WORKS
LOCATION TOP OF FOUNDATION (OGL) BOTTOM OF EXCAVATION
993.48 990.464
994.63 990.464
ABURTMENT A 994.23 990.464
993.71 990.464
994.98 990.464
Average Level 994.206 990.464

Excavated Depth 3.742


Total quantity3.742m*12.2m*15.85m=723.591m 3
991.88 985.424
991.45 985.424
991.94 985.424
991.57 985.424
ABURTMENT B 992.85 985.424
992.75 985.424
991.77 985.424
991.68 985.424
994.98 985.424
Average Level 992.3188888889 985.424

Excavated Depth 6.895


Total quantity6.895m*12.2m*20m=1682.353m 3
Grand total of excavation in soft material 2405.944m 3

LOCATION TOP OF FOUNDATION (OGL) BOTTOM OF EXCAVATION


992.27 984.222
991.32 984.222
PIER 1 989.82 984.222
988.41 984.222
988.93 984.222
Average Level 990.15 984.222

Excavated Depth 5.928


Total quantity5.928m*12.2m*4.4m=318.215m 3
989.95 984.689
988.77 984.689
PIER 2 988.1 984.689
988.04 984.689
988.5 984.689
Average Level 988.672 984.689

Excavated Depth 3.983


Total quantity3.983m*12.2m*4.4m=213.807m 3
Grand total of excavation in rock532.022m3